Small Business Innovation Research · Small Business Technology Transfer
M4 Engineering, Inc.: SBIR & STTR awards
84 awards worth $31.64M to 1 companies since 2004 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
M4 Engineering, Inc.'s federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2026 | 1 | 0 | $240.0K |
| 2025 | 2 | 1 | $1.14M |
| 2024 | 1 | 2 | $2.49M |
| 2023 | 3 | 1 | $1.74M |
| 2022 | 3 | 1 | $2.84M |
| 2021 | 3 | 1 | $1.25M |
| 2020 | 4 | 2 | $2.04M |
| 2019 | 2 | 1 | $724.9K |
| 2018 | 2 | 0 | $274.8K |
| 2017 | 1 | 0 | $230.0K |
| 2016 | 1 | 2 | $1.79M |
| 2015 | 3 | 2 | $1.90M |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
By agency
- Department of Defense 49 awards · $20.28M
- National Aeronautics and Space Administration 35 awards · $11.36M
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| Hypersonic Computational Fluid Dynamics Heat Flux Sub-Models · topic N25B-T033 | M4 Engineering, Inc. · California | Department of Defense · Navy | STTR Phase I | $240.0K | 2025-10-14 |
| PyFoil81: Rotorcraft Design Tool Airfoil Table Generator · topic A1 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase I | $150.0K | 2025-09-17 |
| UAM Design Space Exploration Framework with Embedded Version Control · topic A1 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase II | $850.0K | 2025-07-10 |
| High-Fidelity Computational Modeling of Fluid-Thermal-Structural Interactions in Hypersonic Air-Breathing Systems · topic N25A-T001 | M4 Engineering, Inc. · California | Department of Defense · Navy | STTR Phase I | $140.0K | 2025-07-02 |
| UAM Design Space Exploration Framework with Embedded Version Control · topic A1 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase I | $150.0K | 2024-08-08 |
| Low Cost Carbon-Carbon Development for Hypersonic Flight Systems · topic MDA22-T013 | M4 Engineering, Inc. · California | Department of Defense · Missile Defense Agency | STTR Phase II | $1.49M | 2024-03-07 |
| Topology Optimization for Design of Highly Tailored Composites for AFP Manufacturing · topic T12 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase II | $850.0K | 2024-01-29 |
| Embedded Aircraft Design Geometry in Multidisciplinary Design Optimization Frameworks · topic N221-004 | M4 Engineering, Inc. · California | Department of Defense · Navy | SBIR Phase II | $1.30M | 2023-08-08 |
| Unsteady Metric-based Adaptation via Koopman Expansion of the Feature Field · topic T9 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase I | $150.0K | 2023-07-26 |
| Friction Drilling Fasteners for Composite Structures · topic N231-026 | M4 Engineering, Inc. · California | Department of Defense · Navy | SBIR Phase I | $140.0K | 2023-06-22 |
| Low Cost Carbon-Carbon Development for Hypersonic Flight Systems · topic MDA22-T013 | M4 Engineering, Inc. · California | Department of Defense · Missile Defense Agency | STTR Phase I | $150.0K | 2022-11-23 |
| Resin Process Research & Scale-up for Aerospace Carbon-Carbon Composite Structures · topic DLA222-007 | M4 Engineering, Inc. · California | Department of Defense · Defense Logistics Agency | SBIR Phase I | $100.0K | 2022-08-31 |
| Underwater Blast Lung Computational Model · topic DHA211-003 | M4 Engineering, Inc. · California | Department of Defense · Defense Health Agency | SBIR Phase II | $1.10M | 2022-08-18 |
| Topology Optimization for Design of Highly Tailored Composites for AFP Manufacturing · topic T12 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase I | $150.0K | 2022-07-11 |
| Embedded Aircraft Design Geometry in Multidisciplinary Design Optimization Frameworks · topic N221-004 | M4 Engineering, Inc. · California | Department of Defense · Navy | SBIR Phase I | $240.0K | 2022-06-29 |
| Physics-Based Structural Analysis Model Development and Integration with CAPS · topic AF221-DCSO1 | M4 Engineering, Inc. · California | Department of Defense · Air Force | SBIR Phase II – Direct to Phase II | $1.25M | 2022-05-06 |
| Underwater Blast Lung Computational Model · topic DHA211-003 | M4 Engineering, Inc. · California | Department of Defense · Defense Health Agency | SBIR Phase I | $250.0K | 2021-07-26 |
| Aeroelasticity and Aeroservoelastic Control · topic A1 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase II | $749.9K | 2021-07-08 |
| Design Tools for Advanced Tailorable Composites · topic T12 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase I | $125.0K | 2021-05-10 |
| Low Cost Carbon-Carbon Composites for Hot Structures · topic H5 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase I | $124.6K | 2021-05-10 |
| Lightweight Conformal Structures · topic Z4 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase II | $750.0K | 2020-09-25 |
| Advanced Propulsion Systems Ground Test Technology · topic H10 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase I | $124.9K | 2020-08-25 |
| Aeroelasticity and Aeroservoelastic Control · topic A1 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase I | $125.0K | 2020-08-20 |
| Finite Element Method (FEM) for Bonded Repair Design · topic AF193-024 | M4 Engineering, Inc. · California | Department of Defense · Air Force | SBIR Phase I | $149.9K | 2020-04-27 |
| Hexahedral Dominant Auto-Mesh Generator · topic N20A-T004 | M4 Engineering, Inc. · California | Department of Defense · Navy | STTR Phase I | $140.0K | 2020-04-18 |
| Novel Aeroservoelastic Scaled Model Design, Fabrication, and Testing · topic T15 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase II | $749.3K | 2019-12-20 |
| Lightweight Conformal Structures · topic Z4 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase I | $125.0K | 2019-08-19 |
| Verification and Optimization of Advanced Finite Element Modeling Techniques for Complex Submarine Hull Structures · topic N171-059 | M4 Engineering, Inc. · California | Department of Defense · Navy | SBIR Phase II | $499.9K | 2019-05-02 |
| Uncertainty Reduction in High Speed Flight Vehicle Modeling · topic MDA18-T006 | M4 Engineering, Inc. · California | Department of Defense · Missile Defense Agency | STTR Phase I | $99.9K | 2019-03-26 |
| Novel Aeroservoelastic Scaled Model Design, Fabrication, and Testing · topic T15 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase I | $124.8K | 2018-07-27 |
| Extremely Small Balance Technology · topic AF181-013 | M4 Engineering, Inc. · California | Department of Defense · Air Force | SBIR Phase I | $149.9K | 2018-06-25 |
| Verification and Optimization of Advanced Finite Element Modeling Techniques for Complex Submarine Hull Structures · topic N171-059 | M4 Engineering, Inc. · California | Department of Defense · Navy | SBIR Phase I | $230.0K | 2017-09-12 |
| Innovative Aerodynamic Modeling for Aeroservoelastic Analysis and Design · topic T4.01 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase II | $750.0K | 2016-09-26 |
| Bonded Joint Analysis Method · topic N12A-T004 | M4 Engineering, Inc. · California | Department of Defense · Navy | STTR Phase II | $911.4K | 2016-07-20 |
| Reduced Order Nonlinear Dynamic Aeroservoelasticity · topic A1.01 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase I | $125.0K | 2016-06-10 |
| Innovative Aerodynamic Modeling for Aeroservoelastic Analysis and Design · topic T4.01 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase I | $125.0K | 2015-06-17 |
| Multi-Disciplinary Analysis and Optimization of Integrated Spacecraft System Models · topic T11.02 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase I | $121.5K | 2015-06-17 |
| Uncertainty Propagation to Modal Parameters and Metrics · topic AF151-126 | M4 Engineering, Inc. · California | Department of Defense · Air Force | SBIR Phase I | $149.9K | 2015-06-04 |
| Dynamic ASE Modeling and Optimization of Aircraft with SpaRibs · topic T4.01 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | STTR Phase II | $749.8K | 2015-05-27 |
| Physics-Based Conceptual Design Tools · topic A3.05 | M4 Engineering, Inc. · California | National Aeronautics and Space Administration | SBIR Phase II | $749.9K | 2015-05-15 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-09-01. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.