Small Business Innovation Research · Small Business Technology Transfer
Ues Inc: SBIR & STTR awards
297 awards worth $74.73M to 1 companies since 1983 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Ues Inc's federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2023 | 2 | 0 | $174.9K |
| 2022 | 3 | 1 | $1.96M |
| 2021 | 2 | 2 | $2.06M |
| 2020 | 5 | 1 | $1.40M |
| 2019 | 4 | 2 | $4.24M |
| 2018 | 0 | 2 | $1.75M |
| 2017 | 8 | 2 | $2.75M |
| 2016 | 2 | 0 | $290.0K |
| 2015 | 1 | 2 | $2.73M |
| 2014 | 4 | 7 | $6.17M |
| 2013 | 8 | 1 | $1.49M |
| 2012 | 10 | 0 | $1.16M |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
By agency
- Department of Defense 224 awards · $60.27M
- Department of Energy 39 awards · $9.21M
- National Science Foundation 17 awards · $2.59M
- National Aeronautics and Space Administration 6 awards · $1.19M
- Department of Health and Human Services 4 awards · $748.8K
- Nuclear Regulatory Commission 2 awards · $239.4K
- Department of Agriculture 2 awards · $200.0K
- Environmental Protection Agency 2 awards · $179.9K
- Department of Transportation 1 awards · $99.9K
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| AiHigh Fidelity, Library Based THz Air Toxic Monitoring System for Neighborhood-Level Surveillance · topic 2A | Ues Inc · Ohio | Environmental Protection Agency | SBIR Phase I | $99.9K | 2022-12-01 |
| Si3N4 Fiber (22-RD-381) · topic X224-OCSO1 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $75.0K | 2022-11-02 |
| Design, Analysis, Fabrication, and Test Firing of Non-eroding Hybrid Ceramic Nozzle Throats Using Strong and Tough TaC-Composites (22-RD-379) · topic X222-PDCSO1 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase II | $1.50M | 2022-09-15 |
| Novel Innovative UHTC and Fabrication for Solid Propulsion Pintles (22-RD-360) · topic MDA22-003 | Ues Inc · Ohio | Department of Defense · Missile Defense Agency | SBIR Phase I | $150.0K | 2022-07-25 |
| Ceramic Matrix Composites With Novel Additives For Gas Turbine Engine Applications (22-RD-363) · topic N22A-T019 | Ues Inc · Ohio | Department of Defense · Navy | STTR Phase I | $140.0K | 2022-06-06 |
| Protective Nanostructured Coatings for Engine Fuel Systems (21-RD-327) · topic A21C-T005 | Ues Inc · Ohio | Department of Defense · Army | STTR Phase I | $173.0K | 2022-05-26 |
| Robotic Microelectronic Planar Serial Sectioning System (21-RD-282) · topic DMEA211-002 | Ues Inc · Ohio | Department of Defense · Defense Microelectronics Activity | SBIR Phase I | $167.5K | 2021-09-10 |
| Probability of Detection and Validation for Computed Tomography Processes for Additive Manufacturing (21-RD-284) · topic Z4 | Ues Inc · Ohio | National Aeronautics and Space Administration | SBIR Phase II | $747.1K | 2021-08-02 |
| Rapid Repair of Corroded Fastener Holes (20-RD-233 v6) · topic N192-085 | Ues Inc · Ohio | Department of Defense · Navy | SBIR Phase II | $1.10M | 2021-04-30 |
| Design, Analysis, and Test Firing of EM 76 Advanced Rocket Nozzle Using Strong and Tough TaC-Composites (20-RD-268) · topic AF203-001 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $50.0K | 2020-12-17 |
| Probability of Detection and Validation for Computed Tomography Processes for Additive Manufacturing (20-RD-231) · topic Z4 | Ues Inc · Ohio | National Aeronautics and Space Administration | SBIR Phase I | $125.0K | 2020-08-28 |
| Advanced Ceramic Matrix Composite Gas Turbine Engine Research Combustor (20-RD-220) · topic A20-027 | Ues Inc · Ohio | Department of Defense · Army | SBIR Phase I | $111.5K | 2020-06-01 |
| Scalable Process for Novel Nanomaterials with Infrared Filtering Properties (20-RD-214) · topic A20-022 | Ues Inc · Ohio | Department of Defense · Army | SBIR Phase I | $111.5K | 2020-06-01 |
| Hypersonic Vehicle Electrical Power Generation through Efficient Thermionic Conversion Devices (19-RD-182) · topic AF192-048 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $150.0K | 2019-12-12 |
| Erosion Resistant Coatings for Large-Diameter Gas Turbine Engine Compressor Integrally-Bladed Rotors (IBRs) and Lift-Fan Blades (19-RD-186) · topic AF192-041 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $150.0K | 2019-12-12 |
| UHTC-Based Leading Edge Components (19-RD-207) · topic AF192-001 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase II | $748.8K | 2019-11-07 |
| Rapid Repair of Corroded Fastener Holes (19-RD-189) · topic N192-085 | Ues Inc · Ohio | Department of Defense · Navy | SBIR Phase I | $140.0K | 2019-09-25 |
| Breathing Air Manifold For Air Quality Sampling (19-RD-156) · topic AF191-016 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $150.0K | 2019-08-19 |
| UHTC-Based Leading Edge Components (19-RD-190) · topic AF192-001 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $50.0K | 2019-08-02 |
| Non-Silicon and Non-Boron based Leading Edges for Hypersonic Vehicles (19-RD-145, second submission) · topic AF141-001 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase II | $3.00M | 2019-04-26 |
| Metal Additive Manufacturing with Minimal Post Processing (MaMMPP) (18-RD-116) · topic A18B-T003 | Ues Inc · Ohio | Department of Defense · Army | STTR Phase I | $150.0K | 2018-12-17 |
| Joining of Ni based Superalloys for Sustainable High-temperature Hybrid Turbine Rotors (18-RD-993) · topic AF171-059 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase II | $750.0K | 2018-10-30 |
| Joining of Ceramic Composites for Nuclear Applications (18-RD-986) · topic 10b | Ues Inc · Ohio | Department of Energy | SBIR Phase II | $1.00M | 2018-05-21 |
| High Temperature, High Performance Wire Insulation (17-RD-964) · topic N162-088 | Ues Inc · Ohio | Department of Defense · Navy | SBIR Phase II | $750.0K | 2018-02-21 |
| Self Regenerative Coatings for Enhanced Protection of Silicon Based Ceramic Composites in Particle Laden Degraded Engine Environments (17-RD-938) · topic A17-030 | Ues Inc · Ohio | Department of Defense · Army | SBIR Phase I | $100.0K | 2017-09-05 |
| Nitride based Nanocomposite Bond Coat for SiC/SiC CMCs (17-RD-936) · topic AF161-120 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase II | $750.0K | 2017-08-04 |
| Joining of Ni based Superalloys for Sustainable High-temperature Hybrid Turbine Rotors (17-RD-929) · topic AF171-059 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $150.0K | 2017-07-19 |
| In-field Detection of Biotic and Abiotic Pollutants in Surface Water in Agricultural Environments(16-RD-908) · topic 8.4 | Ues Inc · Ohio | Department of Agriculture | SBIR Phase I | $100.0K | 2017-06-15 |
| Origination of Defects in Powder Bed Fusion Additive Manufacturing (17-RD-923) · topic N171-090 | Ues Inc · Ohio | Department of Defense · Navy | SBIR Phase I | $125.0K | 2017-06-01 |
| Development of Novel Hybrid UHTC Composites for Advanced Tactical Propulsion Systems (16-RD-882) · topic MDA15-002 | Ues Inc · Ohio | Department of Defense · Missile Defense Agency | SBIR Phase II | $1.00M | 2017-03-20 |
| Compact Laser Drivers for Photoconductive Semiconductor Switches (16-RD-863) · topic DTRA16A-004 | Ues Inc · Ohio | Department of Defense · Defense Threat Reduction Agency | STTR Phase I | $150.0K | 2017-03-01 |
| Joining of Ceramic Composites for Nuclear Applications · topic 10b | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $150.0K | 2017-02-21 |
| High Temperature, High Performance Wire Insulation (16-RD-888) · topic N162-088 | Ues Inc · Ohio | Department of Defense · Navy | SBIR Phase I | $150.0K | 2016-10-20 |
| Onsite Structural Restoration Methods for Aircraft Components (16-RD-887) · topic N162-087 | Ues Inc · Ohio | Department of Defense · Navy | SBIR Phase I | $80.0K | 2016-10-07 |
| Nitride based Nanocomposite Bond Coat for SiCf-SiC composites(16-RD-862) · topic AF161-120 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $150.0K | 2016-07-12 |
| Development of Novel Hybrid UHTC Composites for Advanced Tactical Propulsion Systems · topic MDA15-002 | Ues Inc · Ohio | Department of Defense · Missile Defense Agency | SBIR Phase I | $140.0K | 2015-12-17 |
| Dual Mode Electrical Accumulator Unit (DMEAU) II · topic AF093-173 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase II | $1.73M | 2015-04-07 |
| Durable High Temperature Coatings For Utility Scale Gas Turbine Hot Gas Path Components · topic 14c | Ues Inc · Ohio | Department of Energy | STTR Phase II | $849.9K | 2015-04-06 |
| Non-Silicon and Non-Boron based Leading Edges for Hypersonic Vehicles · topic AF141-001 | Ues Inc · Ohio | Department of Defense · Air Force | SBIR Phase I | $150.0K | 2014-10-01 |
| Fabrication of Ta-Hf-C-based Ultra High Temperature Composites · topic MDA09-T002 | Ues Inc · Ohio | Department of Defense · Missile Defense Agency | STTR Phase II | $500.0K | 2014-11-03 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.