Small Business Innovation Research · Small Business Technology Transfer
Precision Combustion, Inc.: SBIR & STTR awards
208 awards worth $75.40M to 1 companies since 1987 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Precision Combustion, Inc.'s federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2025 | 5 | 3 | $5.22M |
| 2024 | 5 | 2 | $3.06M |
| 2023 | 1 | 2 | $3.30M |
| 2022 | 10 | 3 | $6.15M |
| 2021 | 0 | 2 | $1.85M |
| 2020 | 9 | 11 | $11.64M |
| 2019 | 9 | 0 | $1.09M |
| 2018 | 4 | 3 | $3.30M |
| 2017 | 3 | 3 | $3.14M |
| 2016 | 7 | 4 | $4.70M |
| 2015 | 3 | 3 | $2.42M |
| 2014 | 4 | 3 | $1.97M |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
By agency
- Department of Defense 86 awards · $34.10M
- Department of Energy 53 awards · $25.05M
- National Aeronautics and Space Administration 36 awards · $11.11M
- National Science Foundation 14 awards · $2.20M
- Environmental Protection Agency 14 awards · $1.50M
- Department of Agriculture 5 awards · $1.43M
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| Regenerable Adsorption-based Continuous CO2 Removal (RACCR) System for Continuously Eliminating CO2 from Closed Circuit Rebreathers · topic CBD254-003 | Precision Combustion, Inc. · Connecticut | Department of Defense · Office for Chemical and Biological Defense | SBIR Phase I | $209.5K | 2025-09-12 |
| High-Purity, Compressed Hydrogen from Greywater and Sunlight via Novel Membranes · topic A19B-T015 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | SBIR Phase II | $1.90M | 2025-08-28 |
| Structured, Highly Active Catalyst for Low Temperature Methanol Reforming · topic A23B-T016 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | STTR Phase II | $1.31M | 2025-07-07 |
| Scalable, Solid State, Hybrid Power and Propulsion System · topic A244-P038 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | SBIR Phase I | $250.0K | 2025-03-04 |
| Comprehension and Mitigation of Metal Corrosion Modes in Reversible Solid Oxide Cells · topic C59-09a | Precision Combustion, Inc. · Connecticut | Department of Energy | SBIR Phase I | $206.5K | 2025-02-18 |
| Simultaneous H2 Generation and Compression with Intermediate-Temperature Solid-Oxide Membranes · topic T7 | Precision Combustion, Inc. · Connecticut | National Aeronautics and Space Administration | STTR Phase II | $849.8K | 2025-02-13 |
| Deployable System for Unitized Hydrogen Generation and Compression from Saltwater · topic N242-070 | Precision Combustion, Inc. · Connecticut | Department of Defense · Navy | SBIR Phase I | $239.7K | 2024-12-02 |
| JP-8 Fueled Electrified Combat Vehicles · topic A244-P001 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | SBIR Phase I | $249.9K | 2024-10-28 |
| Efficient and Sustainable Paradigm for MW-hr. Electric Propulsion (ESP for MEP) · topic A1 | Precision Combustion, Inc. · Connecticut | National Aeronautics and Space Administration | SBIR Phase I | $149.5K | 2024-08-03 |
| Improved SIPH Thermal Particles for Decarbonization of Chemical Production · topic C58-17c | Precision Combustion, Inc. · Connecticut | Department of Energy | SBIR Phase I | $206.4K | 2024-07-22 |
| Electrochemical Microchip Paired with Energetic Fuels for MW-hr Electrified Propulsion (EMPoWEr) · topic DE-FOA-0003163 | Precision Combustion, Inc. · Connecticut | Department of Energy · ARPA-E | SBIR Phase II | $914.3K | 2024-05-13 |
| Electrochemical Microchip Paired with Energetic Fuels for MW-hr Electrified Propulsion (EMPoWEr) · topic DE-FOA-0003163 | Precision Combustion, Inc. · Connecticut | Department of Energy · ARPA-E | SBIR Phase I | $306.7K | 2024-05-13 |
| Structured, Highly Active Catalyst for Low Temperature Methanol Reforming · topic A23B-T016 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | STTR Phase I | $196.7K | 2024-01-08 |
| High Efficiency Carbon Capture and Storage on Ships · topic N232-107 | Precision Combustion, Inc. · Connecticut | Department of Defense · Navy | SBIR Phase I | $139.9K | 2023-12-04 |
| Fast Startup, Fuel Flexible CPOX System for SOFC · topic A22B-T009 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | STTR Phase II | $1.15M | 2023-11-07 |
| Simultaneous H2 Generation and Compression with Intermediate-Temperature Solid-Oxide Membranes · topic T7 | Precision Combustion, Inc. · Connecticut | National Aeronautics and Space Administration | STTR Phase I | $150.0K | 2023-07-28 |
| Improved Reactor and Catalyst for Light Alkanes to Olefins and Liquid Fuels · topic C47-22a | Precision Combustion, Inc. · Connecticut | Department of Energy | SBIR Phase II | $1.15M | 2023-04-06 |
| High-Temperature Fuel Coking Mitigation Frangible Coatings for Fuel Nozzles and Screens · topic N212-127 | Precision Combustion, Inc. · Connecticut | Department of Defense · Navy | SBIR Phase II | $2.00M | 2022-12-29 |
| Fast Startup, Fuel Flexible CPOX System for SOFC · topic A22B-T009 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | STTR Phase I | $172.9K | 2022-09-27 |
| MOF Sponges for Enhanced Protection Against Warfare Chemicals · topic A22B-T021 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | STTR Phase I | $172.9K | 2022-09-19 |
| Jet-fueled, All-electric Power and Propulsion for Small Unmanned Aerial Systems (SUAS) · topic AF212-0010 | Precision Combustion, Inc. · Connecticut | Department of Defense · Air Force | SBIR Phase I | $149.9K | 2022-09-06 |
| Hypersonic Engine Combustion Reactivity Enhancement Utilizing On-Board Fuel · topic AF221-0023 | Precision Combustion, Inc. · Connecticut | Department of Defense · Air Force | SBIR Phase I | $149.9K | 2022-08-24 |
| Water Management System for Reversible PEM Cells Applications · topic Z1 | Precision Combustion, Inc. · Connecticut | National Aeronautics and Space Administration | SBIR Phase I | $149.9K | 2022-07-07 |
| Capture of Atmospheric CO2 · topic C54-22a | Precision Combustion, Inc. · Connecticut | Department of Energy | SBIR Phase I | $255.8K | 2022-06-27 |
| Ethylene Control for Produce · topic 8.5 | Precision Combustion, Inc. · Connecticut | Department of Agriculture | SBIR Phase I | $181.5K | 2022-04-15 |
| DESTRUCTION OF VAM USING A MODULAR CATALYTIC ELEMENT SYSTEM · topic N/A | Precision Combustion, Inc. · Connecticut | Department of Energy | SBIR Phase II | $1.75M | 2022-03-14 |
| DESTRUCTION OF VAM USING A MODULAR CATALYTIC ELEMENT SYSTEM · topic N/A | Precision Combustion, Inc. · Connecticut | Department of Energy · ARPA-E | SBIR Phase II | $1.71M | 2022-03-14 |
| DESTRUCTION OF VAM USING A MODULAR CATALYTIC ELEMENT SYSTEM · topic N/A | Precision Combustion, Inc. · Connecticut | Department of Energy · ARPA-E | SBIR Phase I | $259.6K | 2022-03-14 |
| Pressure and Low Temperature Tolerant, High Current Density Solid Electrolyte for Propellant Grade Reactants · topic T2 | Precision Combustion, Inc. · Connecticut | National Aeronautics and Space Administration | STTR Phase II | $749.9K | 2022-02-18 |
| Thermally and Chemically Stable Metallic Membranes for H2 Generation with CO2 Capture · topic C53-22a | Precision Combustion, Inc. · Connecticut | Department of Energy | SBIR Phase I | $206.3K | 2022-02-14 |
| Frangible Coatings for Fuel Filters and Nozzles · topic N212-127 | Precision Combustion, Inc. · Connecticut | Department of Defense · Navy | SBIR Phase I | $239.7K | 2021-10-20 |
| Vacuum-RegenerableTrace Contaminant Control for Exploration Portable Life Support System · topic H4 | Precision Combustion, Inc. · Connecticut | National Aeronautics and Space Administration | SBIR Phase II | $749.3K | 2021-07-28 |
| High Purity H2 from Sunlight via a Unique Combination of Novel Photodiodes and Membranes · topic A19B-T015 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | STTR Phase II | $1.10M | 2021-06-02 |
| SOFCs for FLIGHT · topic 1 | Precision Combustion, Inc. · Connecticut | Department of Energy · ARPA-E | SBIR Phase II | $1.54M | 2021-08-02 |
| SOFCs for FLIGHT · topic 1 | Precision Combustion, Inc. · Connecticut | Department of Energy · ARPA-E | SBIR Phase I | $256.6K | 2021-02-01 |
| Effective Reduction of Ammonia in Poultry Facilities · topic 8.300000000000001 | Precision Combustion, Inc. · Connecticut | Department of Agriculture | SBIR Phase II | $599.6K | 2020-09-21 |
| Pressure and Low Temperature Tolerant, High Current Density Solid Electrolyte for Propellant Grade Reactants · topic T2 | Precision Combustion, Inc. · Connecticut | National Aeronautics and Space Administration | STTR Phase I | $124.7K | 2020-08-20 |
| Vacuum-Regenerable Trace Contaminant Control for Exploration Portable Life Support System · topic H4 | Precision Combustion, Inc. · Connecticut | National Aeronautics and Space Administration | SBIR Phase I | $124.8K | 2020-07-31 |
| Develop Sand-Plugging Resistant Metallic Combustor Liners · topic A19-002 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | SBIR Phase II | $558.9K | 2020-07-09 |
| Solid Oxide Fuel Cell (SOFC) Power System · topic A19-010 | Precision Combustion, Inc. · Connecticut | Department of Defense · Army | SBIR Phase II | $555.2K | 2020-07-09 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-09-01. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.