Small Business Innovation Research · Small Business Technology Transfer
Fiber Materials, Inc.: SBIR & STTR awards
94 awards worth $21.18M to 1 companies since 1983 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Fiber Materials, Inc.'s federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2011 | 4 | 2 | $1.60M |
| 2010 | 2 | 0 | $199.1K |
| 2009 | 2 | 0 | $150.0K |
| 2008 | 0 | 1 | $985.4K |
| 2007 | 2 | 0 | $200.0K |
| 2006 | 1 | 4 | $2.74M |
| 2005 | 7 | 0 | $618.3K |
| 2004 | 2 | 6 | $4.83M |
| 2003 | 6 | 2 | $2.18M |
| 2002 | 8 | 0 | $586.0K |
| 2001 | 1 | 0 | $64.9K |
| 2000 | 3 | 1 | $838.8K |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
By agency
- Department of Defense 69 awards · $16.39M
- National Aeronautics and Space Administration 18 awards · $3.84M
- Department of Transportation 2 awards · $557.8K
- Department of Energy 3 awards · $199.9K
- National Science Foundation 1 awards · $97.5K
- Department of Health and Human Services 1 awards · $91.3K
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| Composite DACS Nozzle for Next Generation Interceptor · topic MDA10-013 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $100.0K | 2011-08-24 |
| Multi-Layered Integrated Airframe System · topic X9.02 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase II | $599.9K | 2011-08-03 |
| Phenolic Impregnated Carbon Ablator (PICA) Gap Filler for Heat Shield Assemblies · topic X9.01 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase II | $598.9K | 2011-08-02 |
| Flexible Phenolic Impregnated Felt · topic X9.01 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase I | $100.0K | 2011-02-18 |
| Graded Density Carbon Bonded Carbon Fiber (CBCF) Preforms for Lightweight Ablative Thermal Protection Systems (TPS) · topic X9.01 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase I | $100.0K | 2011-02-18 |
| Integrated Composite Structure for EDL Application · topic X9.02 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase I | $100.0K | 2011-02-18 |
| Multi-Layered Integrated Airframe System · topic X9.02 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase I | $99.9K | 2010-01-29 |
| Phenolic Impregnated Carbon Ablator (PICA) Gap Filler for Heat Shield Assemblies · topic X9.01 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase I | $99.1K | 2010-01-29 |
| Nanoporous Thermal Barrier Coatings for Aircraft Structural Surfaces · topic N091-033 | Fiber Materials, Inc. · Maine | Department of Defense · Navy | SBIR Phase I | $80.0K | 2009-06-04 |
| High Temperature, High Stress GPS Antenna Window · topic N08-215 | Fiber Materials, Inc. · Maine | Department of Defense · Navy | SBIR Phase I | $70.0K | 2009-01-27 |
| Advanced CMC Materials and Manufacturing Processes for Divert and Attitude Control Systems · topic MDA06-027 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $985.4K | 2008-08-25 |
| Advanced CMC Materials and Manufacturing Processes for Divert and Attitude Control Systems · topic MDA06-027 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $100.0K | 2007-04-05 |
| Miniaturized CMC Propulsion System Components for Multiple Kill Vehicle (MKV) · topic MDA06-021 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $100.0K | 2007-04-05 |
| Development and Demonstration of an Advanced Composite Interceptor Nosecone for KEI · topic MDA04-111 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $749.8K | 2006-10-24 |
| Development of an Integrated Composite Raceway and Missile Harness-Fairing Assembly · topic MDA04-111 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $1.04M | 2006-06-16 |
| Development of Durable, Fiber-Reinforced Refractory Composites for Thermal Protection Systems (TPSs) · topic AF05-137 | Fiber Materials, Inc. · Maine | Department of Defense · Air Force | SBIR Phase II | $276.7K | 2006-05-09 |
| Effects of Defects in Ceramic Composites · topic N06-030 | Fiber Materials, Inc. · Maine | Department of Defense · Navy | SBIR Phase I | $80.0K | 2006-03-29 |
| Advanced Thermal Protection Systems (ATPS), Aerospace Grade Carbon Bonded Carbon Fiber Material · topic X2.06 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase II | $600.0K | 2005-12-02 |
| Development of Durable, Fiber-Reinforced Refractory Composites for Thermal Protection Systems (TPSs) · topic AF05-137 | Fiber Materials, Inc. · Maine | Department of Defense · Air Force | SBIR Phase I | $100.0K | 2005-05-25 |
| Design Development of an Advanced Composite Interceptor Nosecone for KEI · topic MDA04-111 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $100.0K | 2005-03-25 |
| Multi-Dimensional Reinforced Ceramic Matrix Composite Application to Advanced Pintle Operated DACS Systems · topic MDA04-111 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $100.0K | 2005-03-25 |
| Integrated Missile Harness-Fairing Assembly · topic MDA04-111 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $99.9K | 2005-03-25 |
| Efficient Low-Cost Ceramic Grade Nicalon Textile Sizing for High-Temperature Polymer Matrix Composites · topic N05-025 | Fiber Materials, Inc. · Maine | Department of Defense · Navy | SBIR Phase I | $80.0K | 2005-02-24 |
| Advanced Thermal Protection Systems (ATPS), Aerospace Grade Carbon Bonded Carbon Fiber Material · topic X2.06 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase I | $70.0K | 2005-01-21 |
| Integrated Advanced Monopropellant CMC Thruster / Thermal Stand-Off Assembly · topic X6.05 | Fiber Materials, Inc. · Maine | National Aeronautics and Space Administration | SBIR Phase I | $68.5K | 2005-01-20 |
| Common Aero Vehicle Acreage Thermal Protection System · topic AF03-019 | Fiber Materials, Inc. · Maine | Department of Defense · Air Force | SBIR Phase II | $742.1K | 2004-08-31 |
| Advanced Divert and Attitude Control Materials, Attitude Control System (ACS) Thruster Body Application · topic MDA03-087 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $750.0K | 2004-08-25 |
| Innovative Manufacturing Processes - THAAD Midbody & Booster TPS Fabrication · topic BMDO01-004 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $747.8K | 2004-08-05 |
| Advanced Divert and Attitude Control System Materials for Liquid/Gel DACS Systems · topic MDA03-087 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $949.5K | 2004-07-01 |
| HfB2-filled Braided C/SiC Nozzles for High Performance DACS · topic BMDO02-006 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $749.8K | 2004-04-30 |
| Divert and Attitude Control Systems (DACs) Thruster Non-Destructive Examination · topic MDA02-038 | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $749.7K | 2004-03-25 |
| Bore Insulator Materials for a Naval Electromagnetic Launcher · topic N04-045 | Fiber Materials, Inc. · Maine | Department of Defense · Navy | SBIR Phase I | $70.0K | 2004-03-25 |
| Advanced Composites for Ammunition Protection and Crew Survivability · topic A03-032 | Fiber Materials, Inc. · Maine | Department of Defense · Army | SBIR Phase I | $69.9K | 2003-12-12 |
| Development of Integrated Composite Structures | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $947.6K | 2003 |
| Vibration Control of Optical Components in Missile Guidance Systems using PZT Fiber Composites | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase II | $749.6K | 2003 |
| Novel Flame and Impact Resistant Foam Core | Fiber Materials, Inc. · Maine | Department of Defense · Air Force | SBIR Phase I | $100.0K | 2003 |
| Common Aero Vehicle Payload and Avionics Isolation | Fiber Materials, Inc. · Maine | Department of Defense · Air Force | SBIR Phase I | $99.3K | 2003 |
| Characterization and Reduction of Vibration and Shock for an Integrated Composite Structure | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $70.0K | 2003 |
| Advanced Divert and Attitude Control Materials | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $70.0K | 2003 |
| Advanced Divert and Attitude Control System Materials for Liquid/Gel DACS Systems | Fiber Materials, Inc. · Maine | Department of Defense · Missile Defense Agency | SBIR Phase I | $70.0K | 2003 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-09-01. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.