Small Business Innovation Research · Small Business Technology Transfer
Kalsi Engineering, Inc: SBIR & STTR awards
16 awards worth $6.84M to 1 companies since 1987 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Kalsi Engineering, Inc's federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2024 | 0 | 1 | $1.15M |
| 2023 | 1 | 0 | $199.9K |
| 2022 | 0 | 1 | $799.8K |
| 2021 | 1 | 0 | $131.5K |
| 2019 | 0 | 1 | $2.04M |
| 2006 | 0 | 1 | $750.0K |
| 2005 | 1 | 0 | $100.0K |
| 1997 | 0 | 1 | $750.0K |
| 1996 | 1 | 0 | $75.0K |
| 1994 | 2 | 0 | $145.0K |
| 1991 | 0 | 1 | $498.1K |
| 1990 | 2 | 0 | $100.0K |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
By agency
- Department of Energy 9 awards · $3.65M
- Department of Defense 1 awards · $2.04M
- National Aeronautics and Space Administration 3 awards · $1.00M
- Nuclear Regulatory Commission 3 awards · $150.0K
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| Development of Fast Response Flow Control Valve for Gaseous Hydrogen Fueling of Fuel Cell Vehicles · topic C56-18c | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase II | $1.15M | 2024-09-10 |
| Project Title:Development of fast response flow control valve for gaseous hydrogen fueling of fuel cell vehicles Topic Number: C56-18C · topic C56-18c | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase I | $199.9K | 2023-07-10 |
| Miniature passive thermal control valve for mixing or splitting single-phase fluid · topic Z2 | Kalsi Engineering, Inc · Texas | National Aeronautics and Space Administration | SBIR Phase II | $799.8K | 2022-05-31 |
| Miniature passive thermal control valve for mixing or splitting single-phase fluid · topic Z2 | Kalsi Engineering, Inc · Texas | National Aeronautics and Space Administration | SBIR Phase I | $131.5K | 2021-05-10 |
| Engineered Integral and Downstream Flow Conditioners · topic NX19-003 | Kalsi Engineering, Inc · Texas | Department of Defense · Navy | SBIR Phase II | $2.04M | 2019-08-23 |
| Advanced Sealed Bearing Assembly for Positive Displacement Motors used in Micro-borehole Drilling · topic 12 | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase II | $750.0K | 2006 |
| Advanced Sealed Bearing Asembly for Positive Discplacment Motors used in Micro-borehole Driling · topic 12 | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase I | $100.0K | 2005 |
| High Speed Bearing for Roller Cone Drill Bits Used in Hard Rock Drilling | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase II | $750.0K | 1997 |
| High Speed Bearing for Roller Cone Drill Bits Used in Hard Rock Drilling | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase I | $75.0K | 1996 |
| DEVELOPMENT OF A HIGHER PRESSURE ROTARY BLOWOUT PREVENTER FOR SAFE DIRECTIONAL DRILLING IN UNDERBALANCED APPLICATIONS | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase I | $75.0K | 1994 |
| Pressure Relief Valve for Cryogenic Gases with Modulating Pressure Control | Kalsi Engineering, Inc · Texas | National Aeronautics and Space Administration | SBIR Phase I | $70.0K | 1994 |
| DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase II | $498.1K | 1991 |
| IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS | Kalsi Engineering, Inc · Texas | Nuclear Regulatory Commission | SBIR Phase I | $50.0K | 1990 |
| DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS | Kalsi Engineering, Inc · Texas | Department of Energy | SBIR Phase I | $50.0K | 1990 |
| PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS | Kalsi Engineering, Inc · Texas | Nuclear Regulatory Commission | SBIR Phase II | $50.0K | 1988 |
| PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS | Kalsi Engineering, Inc · Texas | Nuclear Regulatory Commission | SBIR Phase I | $50.0K | 1987 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.