Free tool · no sign-up

Wrap rate calculator

From what you pay a person to what you bill the government: fringe on labor, overhead on its base, G&A on total cost input, then fee. Bases differ from company to company (your disclosed accounting practice), so both are switchable. Everything is worked out in your browser; nothing is stored. More free tools

Benefits, payroll taxes, paid leave
Facilities, supervision, equipment for the work
General and administrative: the company's running costs

$99.07 an hour, fully loaded

Wrap rate 2.20× with fee · 2.04× without

Direct labor$45.00the hourly pay rate
Fringe$13.5030% of direct labor
Overhead$23.4040% of direct labor + fringe
G&A$9.8312% of labor, fringe and overhead
Total cost$91.73before fee
Fee / profit$7.348% of total cost
Billed rate$99.07

A GSA schedule ceiling or a rate the buyer caps: the most you can pay with these rates

Compare with what others charge: GSA ceiling rates by labor category.

How it adds up

Fringe = direct labor × fringe %. Overhead = (direct labor + fringe) × overhead %. G&A = (direct labor + fringe + overhead) × G&A %. Total cost = all four. Billed rate = total cost × (1 + fee %). The wrap rate is the billed rate divided by direct labor. On cost-type contracts the fee is limited by FAR 15.404-4; indirect rates are reviewed by DCAA or the contracting officer.