Contract vehicle · Single-award IDIQ
Contract vehicle W58RGZ18D0001
145 orders under it are still running.
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
Companies with the most orders, FY2025
- Defense Systems and Solutions $673.08M
Agencies ordering, FY2025
- Department of Defense $673.08M
Offices ordering the most, FY2025
- W6QK Acc-Rsa $673.08M
Contracts ending in the next 12 months
78 contracts, $1.03B with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| W58RGZ25F0392 VERSATILE DEPOT AUTOMATIC TESTING STATION (VDATS) SUPPORT. | Defense Systems and Solutions | 2026-10-07 | $2.05M |
| W58RGZ23F0109 BALLISTIC PANEL SYSTEM FOR CH-47 AIRCRAFT. | Defense Systems and Solutions | 2026-10-10 | $6.71M |
| W58RGZ23F0217 THIS IS AN AIRCRAFT SURVIVABILITY PRODUCT IMPROVEMENT COMMON WARNING SYSTEM FOR APACHE HELICOPTERS. | Defense Systems and Solutions | 2026-10-15 | $15.28M |
| W58RGZ20F0488 PROVIDE UH-60M INTERNAL AUXILIARY FUEL TANK (IAFTS) KITS, MAVEN HEATER RELOCATION KITS, ENHANCED BALLISTIC PROTECTION SYSTEM (EBPS) RETROFIT KITS, MULTI-FUNCTION OPERATOR SEAT MODIFICATION KITS AND PERFORM INSTALLATION FOR SWEDEN, FMS CASE SW-B-WAD. | Defense Systems and Solutions | 2026-10-15 | $13.49M |
| W58RGZ19F0499 THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE TWENTY (20) ALL UP ROUND BALLASTS, GRADE B (AURBB). | Defense Systems and Solutions | 2026-10-15 | $12.13M |
| W58RGZ21F0112 PROCUREMENT, FABRICATION AND DELIVERY OF 20 MK112 ALL UP ROUND SIMULATOR (AURS) MK112 MOD3 UNITS, 20 DYNAMIC LOAD BANK CONTROLLERS (DLBC), AND 20 DLBC CABLES TO SUPPORT THE DESIGN AND MANUFACTURING OF THE TOMAHAWK MISSILE OPERATIONAL TEST EQUIPMENT. | Defense Systems and Solutions | 2026-10-15 | $6.85M |
| W58RGZ23F0234 TARDIS PHASE I. | Defense Systems and Solutions | 2026-10-30 | $37.67M |
| W58RGZ22F0359 C-130 IMPROVED MODULAR AIRBORNE FIRE FIGHTING SYSTEM (IMAFFS) PHASE IV. | Defense Systems and Solutions | 2026-10-30 | $23.34M |
| W58RGZ24F0181 APACHE MOBILE TEAM MATERIAL KITTING AND MOBILE ASSET LOGISTICS AND SUSTAINMENT | Defense Systems and Solutions | 2026-10-30 | $15.60M |
| W58RGZ20F0159 REQUIRED FOR THE DESIGN, ENGINEERING, INTEGRATION, AND TESTS ASSOCIATED WITH THE AIR GROUND NETWORKING RADIO (AGNR) INTEGRATION TO THE UH/HH 60M HELICOPTER | Defense Systems and Solutions | 2026-10-31 | $20.28M |
Orders are task and delivery orders and calls placed under the vehicle, from USAspending.gov. Sources and limits