693JF72340019↗
Puerto Rico Ports Authority received this grant or assistance award from Maritime Administration: $25.00M obligated so far for national infrastructure investments. Its latest action was on 2026-02-19.
Key facts · data as of Nov 14, 2026
- Recipient
- Puerto Rico Ports Authority
- Awarding agency
- Maritime Administration (Department of Transportation)
- Obligated to date
- $25.00M
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.
Cite this page: SpendQuery, Award 693JF72340019, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72340019_069
Puerto Rico Ports Authority: all federal awards · Department of Transportation: spending
AWARD PURPOSE THE PROJECT WILL INCLUDE THE FOLLOWING IMPROVEMENTS TO WHARF C 1 REPLACE CONCRETE PLATFORM WITH A NEW ONE THAT WILL ALLOW OPERATIONAL CARGO LOADS UP TO 600 PSF 2 REHABILITATE THE EXISTING ASPHALT AND INSTALL NEW POST AND FENCE FABRIC FOR BOTH PREFERENTIAL AND TENANT CARGO AREAS 3 INSTALL NEW LED LIGHTING SYSTEMS AND UNDERGROUND ELECTRICAL REHABILITATION 4 REHABILITATE AN EXISTING FIRE PROTECTION SYSTEM 5 CONSTRUCT A STORM SEWER SYSTEM AND 6 REHABILITATE THE EXISTING WATER DISTRIBUTION SYSTEMS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL HAVE TWO COMPONENTS COMPONENT 1 PROGRAM CONSTRUCTION MANAGEMENT. PERFORM PROGRAM CONSTRUCTION MANAGEMENT ACTIVITIES SUCH AS BUT NOT LIMITED TO PERMITTING SUPPORT QUALITY CONTROL SAFETY MANAGEMENT AND PROJECT PHASING. COMPONENT 2 DESIGN BUILD. ELEMENT 1 WHARF RECONSTRUCTION REHABILITATE APPROXIMATELY 600 LINEAR FEET OF THE EXISTING WHARF C. THE WORK INCLUDES DEMOLITION OF THE EXISTING CONCRETE PLATFORM AND SUBSTRUCTURE AS NEEDED. THE NEW WHARF WILL BE DESIGNED TO ALLOW OPERATIONAL CARGO LOADS OF UP TO 600 PSF. THE REHABILITATED WHARF INCLUDES UTILITIES FIRE SUPPRESSION SYSTEM MOORING HARDWARE AND NEW FENDERS. ELEMENT 2 LANDSIDE PAVEMENT AND UTILITIES IMPROVEMENTS. REHABILITATE UP TO APPROXIMATELY 350000 SQUARE FEET SF OF EXISTING PAVED AREA ACROSS WHARF C ACCESSIBLE PORTIONS WHARF D CARGO PATIO AND ADJACENT EMPLOYEE PARKING AND INSTALL NEW POST AND FENCE FABRIC FOR BOTH PREFERENTIAL AND TENANT CARGO AREAS. INSTALL LED LIGHTING FIXTURES THREE HIGH MAST POLES AND UNDERGROUND ELECTRICAL IMPROVEMENTS. REHABILITATE THE EXISTING FIRE PROTECTION SYSTEM OF THE PREFERENTIAL CARGO AREA. CONSTRUCT A NEW STORM SEWER SYSTEM INCLUDING THE REMOVAL OF OLD SEWER LINES AND REHABILITATE THE WATER DISTRIBUTION SYSTEM. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 11 SCHEDULE G OF THE GRANT AGREEMENT MEASURE CARGO VOLUME GROSS TONS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS TOTAL TONS OF CARGO MOVED PER YEAR TEUS OR SHORT TONS TONS. MEASUREMENT FREQUENCY ANNUAL. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS TOTAL VESSEL CALLS PER YEAR NUMBER. MEASUREMENT FREQUENCY ANNUAL.
What it is
- Program
- National Infrastructure Investments (Assistance Listing 20.933)
- Where the work is
- San Juan, PR · district PR-98
- Funding law
- Infrastructure law (IIJA)
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
1 action since 2026-02-19. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-02-19 | New award | $25.00M | AWARD PURPOSE THE PROJECT WILL INCLUDE THE FOLLOWING IMPROVEMENTS TO WHARF C 1 REPLACE CONCRETE PLATFORM WITH A NEW ONE THAT WILL ALLOW OPERATIONAL CARGO LOADS UP TO 600 PSF 2 REHABILITATE THE EXISTING ASPHALT AND INSTALL NEW POST AND FENCE FABRIC FOR BOTH… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗