| 693JF72540036↗ | Department of Transportation | PUERTO RICO PORTS AUTHORITY | PROJECT GRANT (B) | 2026-01-29 | 2026-01-29 | 1 | AWARD PURPOSE THE PROJECT WILL RESTORE AND MODERNIZE CRITICAL INFRASTRUCTURE AT THE PUERTO NUEVO DOCKS IN THE PORT OF SAN JUAN PUERTO RICO. IT WILL RECONSTRUCT WHARVES N AND O INCLUDING DEMOLITION AND DISPOSAL OF THE EXISTING PLATFORMS RECONSTRUCTION OF THE WHARVES AND INSTALLATION OF NEW FENDER SYSTEMS AND BOLLARDS. ACTIVITIES TO BE PERFORMED COMPONENT 1 ARCHITECTURAL ENGINEERING PRELIMINARY DESIGN AND PROCUREMENT SUPPORT. DEVELOP PLANS SPECIFICATIONS AND COST ESTIMATE DOCUMENTS UP TO A 30 PERCENT COMPLETION STAGE FOR THE PROJECT. THE 30 PERCENT COMPLETION STAGE DESIGN DOCUMENTS WILL BE USED IN THE PROCUREMENT OF A DESIGN BUILD REQUEST FOR PROPOSAL TO IMPLEMENT THE PROJECT. THE CONSULTANT WILL ALSO DEVELOP DESIGN CRITERIA GUIDELINES FOR THE REMAINING 70 PERCENT DESIGN, IMPLEMENTATION AND OPERATION. PROVIDE BID SUPPORT AND ASSIST IN THE REQUEST FOR INFORMATION PROCESS DURING DESIGN BUILD BID PROCESS. COMPONENT 2 DESIGN BUILD CONTRACT AND CONSULTING AND PROJECT MANAGEMENT SERVICES. ELEMENT 1 WHARF N DEMOLITION AND DISPOSAL EXISTING PLATFORMS AT WHARF N MEASURING 12000 SQUARE FEET AND EXISTING PLATFORMS AT WHARF O MEASURING 8000 SQUARE FEET WILL BE SYSTEMATICALLY DEMOLISHED. THIS WILL INCLUDE THE REMOVAL AND DISPOSAL OF BOTH THE CONCRETE ELEMENTS AND THE SUPPORTING STEEL PILES. UNDERWATER INSPECTION A THOROUGH UNDERWATER SURVEY WILL BE CONDUCTED TO DETECT AND CATALOGUE ANY SUBMERGED DEBRIS. SUBSEQUENT REMOVAL OF IDENTIFIED DEBRIS WILL BE CARRIED OUT TO ENSURE A CLEAR SITE FOR RECONSTRUCTION. WHARF N RECONSTRUCTION THE SHEET PILE PLATFORM WILL BE RECONSTRUCTED INCLUDING A CONCRETE DECK AND CURB AND STEEL SHEET PILES FOR BOTH PLATFORMS NEW WALE BEAM FOR THE COFFER CELL PLATFORM AND NEW STEEL PILES FOR THE STEEL SHEET PILE PLATFORM. ELEMENT 2 WHARF O. WHARF O RECONSTRUCTION THE STEEL SHEET PILE BULKHEAD PLATFORM CONCRETE MOORING DOLPHIN AND CATWALK PLATFORM AT WHARF O WILL BE RECONSTRUCTED WITH A CONCRETE DECK AND CONCRETE FILLED PILES. THE BULKHEAD PLATFORM WILL INCLUDE A NEARLY 600 LINEAR FOOT STEEL SHEET PILE AND STEEL WALE BEAMS FOR STRUCTURE. THE CONCRETE MOORING DOLPHIN AND CATWALK PLATFORM WILL INCLUDE AN EIGHT FOOT HIGH CONCRETE MOORING DOLPHIN CAP. FENDER SYSTEM AND BOLLARDS INSTALLATION THE SCOPE ALSO INCLUDES THE FITTING OF A FENDER SYSTEM AND THE PLACEMENT OF MOORING STRUCTURES BOLLARDS AT EACH WHARF WHICH ARE CRUCIAL FOR THE SAFE BERTHING OF VESSELS AND THE EFFECTIVE DISTRIBUTION OF MOORING FORCES. CONSULTING AND PROJECT MANAGEMENT SERVICES THIS PHASE OF THE WORK WILL INCLUDE ASSISTING DURING THE COMPLETION OF DESIGN 70 PERCENT THROUGH FINAL CONSTRUCTION DOCUMENTS 100 PERCENT. ALSO ASSISTING THROUGH THE CONSTRUCTION UNTIL THE CLOSEOUT OF EACH PROJECT COMPONENT. THE CONSULTANT MAY BE CALLED UPON TO PROVIDE A PROJECT MANAGEMENT TEAM TO SERVE AS REPRESENTATIVE THROUGH A PORTION OF OR FULL CONSTRUCTION OF THE PROJECT. CONSTRUCTION PHASE DURING THE CONSTRUCTION PHASE THERE WILL BE FULL TIME PERSONNEL AT THE FIELD FOR EACH PROJECT PHASE TO CONDUCT ALL ACTIVITIES REQUIRED FOR THE CONSTRUCTION CONTRACT ADMINISTRATION INCLUDING BUT NOT LIMITED TO ADMINISTRATIVE SUPPORT ENSURING COMPLIANCE WITH THE DESIGN AND SPECIFICATIONS ENFORCEMENT OF FEDERAL AND STATE REGULATIONS AND QUALITY ASSURANCE IN ACCORDANCE WITH THE DESIGN AND PUERTO RICOS LOCAL REGULATIONS. DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 14 OF THE GRANT AGREEMENT MEASURE GROSS TONS SHORT OR METRIC.CATEGORY AND DESCRIPTION MEASUREMENT ECONOMIC COMPETITIVENESS THE MOVEMENT OF GROSS TONNAGE OF FREIGHT IN THE AREA DEFINED BY THE PROJECT STUDY AREA. SECONDARY VARIABLES TYPES OF FREIGHT TYPES OF INTERMODAL TRANSPORT. FREQUENCY QUARTERLY. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION MEASUREMENT ECONOMIC COMPETITIVENESS AND OPPORTUNITY THE NUMBER OF VESSELS CALLING TO THE AREA DEFINED IN THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE: VESSEL TYPE CONTAINER BULK RORO LNG FREIGHT CAPACITY VESSEL LENGTH, OR OTHER.FREQUENCY QUARTERLY. INTENDED BENEFICIARY PUERTO RICO PORTS AUTHORITY. SUBRECIPIENT ACTIVITIES NONE. | $53.53M |
| 693JF72340019↗ | Department of Transportation | PUERTO RICO PORTS AUTHORITY | PROJECT GRANT (B) | 2026-02-19 | 2026-02-19 | 1 | AWARD PURPOSE THE PROJECT WILL INCLUDE THE FOLLOWING IMPROVEMENTS TO WHARF C 1 REPLACE CONCRETE PLATFORM WITH A NEW ONE THAT WILL ALLOW OPERATIONAL CARGO LOADS UP TO 600 PSF 2 REHABILITATE THE EXISTING ASPHALT AND INSTALL NEW POST AND FENCE FABRIC FOR BOTH PREFERENTIAL AND TENANT CARGO AREAS 3 INSTALL NEW LED LIGHTING SYSTEMS AND UNDERGROUND ELECTRICAL REHABILITATION 4 REHABILITATE AN EXISTING FIRE PROTECTION SYSTEM 5 CONSTRUCT A STORM SEWER SYSTEM AND 6 REHABILITATE THE EXISTING WATER DISTRIBUTION SYSTEMS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL HAVE TWO COMPONENTS COMPONENT 1 PROGRAM CONSTRUCTION MANAGEMENT. PERFORM PROGRAM CONSTRUCTION MANAGEMENT ACTIVITIES SUCH AS BUT NOT LIMITED TO PERMITTING SUPPORT QUALITY CONTROL SAFETY MANAGEMENT AND PROJECT PHASING. COMPONENT 2 DESIGN BUILD. ELEMENT 1 WHARF RECONSTRUCTION REHABILITATE APPROXIMATELY 600 LINEAR FEET OF THE EXISTING WHARF C. THE WORK INCLUDES DEMOLITION OF THE EXISTING CONCRETE PLATFORM AND SUBSTRUCTURE AS NEEDED. THE NEW WHARF WILL BE DESIGNED TO ALLOW OPERATIONAL CARGO LOADS OF UP TO 600 PSF. THE REHABILITATED WHARF INCLUDES UTILITIES FIRE SUPPRESSION SYSTEM MOORING HARDWARE AND NEW FENDERS. ELEMENT 2 LANDSIDE PAVEMENT AND UTILITIES IMPROVEMENTS. REHABILITATE UP TO APPROXIMATELY 350000 SQUARE FEET SF OF EXISTING PAVED AREA ACROSS WHARF C ACCESSIBLE PORTIONS WHARF D CARGO PATIO AND ADJACENT EMPLOYEE PARKING AND INSTALL NEW POST AND FENCE FABRIC FOR BOTH PREFERENTIAL AND TENANT CARGO AREAS. INSTALL LED LIGHTING FIXTURES THREE HIGH MAST POLES AND UNDERGROUND ELECTRICAL IMPROVEMENTS. REHABILITATE THE EXISTING FIRE PROTECTION SYSTEM OF THE PREFERENTIAL CARGO AREA. CONSTRUCT A NEW STORM SEWER SYSTEM INCLUDING THE REMOVAL OF OLD SEWER LINES AND REHABILITATE THE WATER DISTRIBUTION SYSTEM. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 11 SCHEDULE G OF THE GRANT AGREEMENT MEASURE CARGO VOLUME GROSS TONS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS TOTAL TONS OF CARGO MOVED PER YEAR TEUS OR SHORT TONS TONS. MEASUREMENT FREQUENCY ANNUAL. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS TOTAL VESSEL CALLS PER YEAR NUMBER. MEASUREMENT FREQUENCY ANNUAL. | $25.00M |
| 37200200472026↗ | Department of Transportation | PUERTO RICO PORTS AUTHORITY | PROJECT GRANT (B) | 2026-04-16 | 2026-04-16 | 1 | PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 11,700 FEET OF EXISTING CONCRETE RUNWAY 8/26 THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS PHASE 5, WHICH CONSISTS OF RECONSTRUCTION OF 2,114 FEET. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH AGUADILLA, PUERTO RICO. | $24.41M |
| 693JF72440068↗ | Department of Transportation | PUERTO RICO PORTS AUTHORITY | PROJECT GRANT (B) | 2026-02-19 | 2026-02-19 | 1 | AWARD PURPOSE THIS PROJECT WILL PLAN DESIGN AND RECONSTRUCT WHARF D OF THE PUERTO NUEVO DOCKS. PROJECT ACTIVITIES WILL INCLUDE DEMOLITION AND DISPOSAL OF THE EXISTING CONCRETE PLATFORM UNDERWATER INSPECTION AND DEBRIS REMOVAL RECONSTRUCTION OF THE CONCRETE PLATFORM AND INSTALLATION OF A NEW FENDER SYSTEM AND BOLLARDS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL HAVE TWO COMPONENTS COMPONENT 1 ARCHITECTURAL ENGINEERING A AND E PRELIMINARY DESIGN AND PROCUREMENT SUPPORT DEVELOP PLANS SPECIFICATIONS AND COST ESTIMATE DOCUMENTS UP TO A 30 PERCENT COMPLETION STAGE FOR THE PROJECT. THE 30 PERCENT COMPLETION STAGE DESIGN DOCUMENTS WILL BE USED IN THE PROCUREMENT OF A DESIGN BUILD REQUEST FOR PROPOSAL RFP TO IMPLEMENT THE PROJECT. THE CONSULTANT WILL ALSO DEVELOP DESIGN CRITERIA GUIDELINES FOR THE REMAINING 70 PERCENT DESIGN IMPLEMENTATION AND OPERATION. PROVIDE BID SUPPORT AND ASSIST IN THE REQUEST FOR INFORMATION RFI PROCESS DURING DESIGN BUILD BID PROCESS. COMPONENT 2 DESIGN BUILD CONTRACT AND CONSULTING AND PROJECT MANAGEMENT SERVICES. ELEMENT 1 DESIGN COMPLETE DESIGN BUILD PACKAGE FROM 30 100 PERCENT. ELEMENT 2 CONSTRUCTION OF WHARF D DEMOLITION AND DISPOSAL DEMOLITION AND DISPOSAL OF EXISTING PLATFORM AT WHARF D MEASURING 400 LINEAR FEET LF WILL BE SYSTEMATICALLY DEMOLISHED. THIS WILL INCLUDE THE REMOVAL AND DISPOSAL OF BOTH THE CONCRETE ELEMENTS AND THE SUPPORTING STEEL PILES. UNDERWATER INSPECTION A THOROUGH UNDERWATER SURVEY WILL BE CONDUCTED TO DETECT AND CATALOGUE SUBMERGED DEBRIS. SUBSEQUENT REMOVAL OF IDENTIFIED DEBRIS WILL BE CARRIED OUT TO ENSURE A CLEAR SITE FOR RECONSTRUCTION. RECONSTRUCTION RECONSTRUCTION OF THE COFFER CELL OR PILE SUPPORTED PLATFORM AND THE STEEL SHEET PILE PLATFORM INCLUDING A CONCRETE DECK AND CURB AND STEEL SHEET PILES FOR BOTH PLATFORMS NEW WALE BEAM FOR THE COFFER CELL PLATFORM. FENDER BOLLARDS AND ANY PERTINENT ANCILLARY SYSTEM THE SCOPE OF THE PROJECT WILL ALSO INCLUDE THE FITTING OF A FENDER SYSTEM AND THE PLACEMENT OF MOORING STRUCTURES BOLLARDS AT EACH WHARF WHICH ARE CRUCIAL FOR THE SAFE BERTHING OF VESSELS AND THE EFFECTIVE DISTRIBUTION OF MOORING FORCES. ELEMENT 3 PROJECT MANAGEMENT CONSULTING AND PROJECT MANAGEMENT SERVICES THIS WILL INCLUDE ASSISTANCE DURING THE 30 PERCENT DESIGN PROCESS UP TO 100 PERCENT FINAL CONSTRUCTION DOCUMENTS. CONSTRUCTION PHASE DURING THE CONSTRUCTION PHASE FULL TIME PERSONNEL WILL CONDUCT ALL ACTIVITIES REQUIRED FOR THE DESIGN BUILD CONTRACT ADMINISTRATION INCLUDING BUT NOT LIMITED TO ADMINISTRATIVE SUPPORT COMPLIANCE WITH THE PLANS AND SPECIFICATIONS AND ENFORCEMENT AND QUALITY ASSURANCE OF THE PLANS IN COMPLIANCE WITH FEDERAL AND LOCAL REGULATIONS. ADMINISTER THE CONSTRUCTION CONTRACT THROUGH THE RECIPIENTS DESIGNATED OFFICIALS INCLUDING ALL REQUIRED PROJECT MANAGEMENT ACTIVITIES. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 11 SCHEDULE G OF THE GRANT AGREEMENT. PERFORMANCE MEASURE CARGO VOLUME GROSS TONS. UNIT REPORTED TOTAL TONS OF CARGO MOVED BY VESSEL IN THE AREA DEFINED BY THE PROJECT STUDY AREA. TONS. PERFORMANCE MEASURE VESSEL CALLS. UNIT REPORTED TOTAL VESSEL CALLS PER YEAR. INTENDED BENEFICIARY PUERTO RICO PORTS AUTHORITY. SUBRECIPIENT ACTIVITIES NONE. | $21.22M |
| 37200200482026↗ | Department of Transportation | PUERTO RICO PORTS AUTHORITY | PROJECT GRANT (B) | 2026-05-21 | 2026-05-21 | 1 | PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 11,700 FEET OF EXISTING CONCRETE RUNWAY 8/26 THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS PHASE 6, WHICH CONSIST OF RECONSTRUCTION OF 1,243 FEET. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH AGUADILLA, PUERTO RICO. | $14.13M |
| 693JF72245031↗ | Department of Transportation | PUERTO RICO PORTS AUTHORITY | PROJECT GRANT (B) | 2026-01-08 | 2026-01-08 | 1 | AWARD PURPOSE TO RUND RECONSTRUCTION OF THE TENDER PIER AND DOCK B IN THE PIER 15 AREA IN THE PORT OF SAN JUAN. IT WILL ALSO FUND THE REHABILITATION OF AN OUTFITTING PIER TO ENHANCE RO RO OPERATIONS AT PIER 15. COMPONENT 1 CONSTRUCTION ELEMENT 1 DOCK B. ELEMENT 2 TENER PIER. ELEMENT 3 OUTFITTING PIER. ACTIVITIES TO PERFORM IMPROVE DOCK B TENDER PIER AND THE OUTFITTER PIER OUTCOMES INCREASE THE GROSS TONS OF CARGO AT THE PIER AND INCREASE THE NUMBER OF VESSEL CALLS. GROSS TONS SHORT METRIC ECONOMIC COMPETITIVENESS THE MOVEMENT OF GROSS TONNAGE OF FRIEGHT IN THE AREA DEFINED BY THE PROJECT STUDY AREA SECONDARY VARIABLES TYPES OF FREIGHT TYPES OF INTERMODAL TRANSPORT. VESSEL CALLS ECONOMIC COMPETITIVENESS VESSEL TYPE AND OR FREIGHT CAPACITY OF THE VESSES CALLING TO THE AREA DEFINED IN THE PROJECT STUDY AREA. INTENDED BENEFICIARY MARAD. SUBRECIPIENT ACTIVITIES NONE. | $10.00M |
| 37200060072026↗ | Department of Transportation | PUERTO RICO PORTS AUTHORITY | PROJECT GRANT (B) | 2026-07-17 | 2026-07-17 | 1 | PURPOSE: REHABILITATE APRON; REHABILITATE RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT REHABILITATES 6,100 FEET OF EXISTING PAVED RUNWAY 10-28 TO MAINTAIN THE STRUCTURAL INTEGRITY AND MINIMIZE FOREIGN OBJECT DEBRIS TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 8,818 SQUARE YARDS OF EXISTING APRON PAVEMENT TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT AND TO MINIMIZE FOREIGN OBJECT DEBRIS. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF DESIGN. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH HUMACAO, PUERTO RICO. | $199.5K |
| 37200230142021↗ | Department of Transportation | PUERTO RICO PORTS AUTHORITY | PROJECT GRANT (B) | 2025-11-12 | 2025-11-12 | 1 | PURPOSE: CORONAVIRUS RELIEF AND RESPONSE SUPPLEMENTAL APPROPRIATIONS ACT FUNDS AWARDED AS ECONOMIC RELIEF TO ELIGIBLE U.S. AIRPORTS AND ELIGIBLE CONCESSIONS AT THOSE AIRPORTS TO PREVENT, PREPARE FOR, AND RESPOND TO THE COVID-19 PANDEMIC. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS GRANT PROVIDES ECONOMIC RELIEF FUNDS FOR COSTS RELATED TO OPERATIONS, PERSONNEL, CLEANING, SANITIZATION, JANITORIAL SERVICES, DEBT SERVICE PAYMENTS, AND COMBATING THE SPREAD OF PATHOGENS AT THE AIRPORT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH CEIBA, PUERTO RICO. | -$35 |