693JF72344040↗

Swinomish Indian Tribal Community received this grant or assistance award from Maritime Administration: $11.07M obligated so far for port infrastructure development program. Its latest action was on 2025-10-30.

Key facts · data as of Nov 14, 2026

Recipient
Swinomish Indian Tribal Community
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$11.07M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award 693JF72344040, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72344040_069

AWARD PURPOSE THE PROJECT CONSISTS OF FOUR COMPONENTS 1 DEVELOPMENT OF A PORT MASTER PLAN THAT EVALUATES THE EXISTING INFRASTRUCTURE ASSESSES THE COMMUNITYS NEEDS FOR PORT FACILITIES AND SERVICES IDENTIFIES A RANGE OF PROPOSED INFRASTRUCTURE SOLUTIONS TO MEET THOSE NEEDS AND CONDUCTS PRELIMINARY ENGINEERING AND DESIGN WORK FOR PRIORITY PROJECTS 2 DESIGN AND CONSTRUCTION OF A BOAT RAMP 3 COMPLETION OF DESIGN AND ENGINEERING FOR UPGRADES TO A COMMERCIAL PIER AND 4 REPLACEMENT OF A MOORING FLOAT. THE BOAT RAMP AND MOORING FLOAT WILL BE CONSTRUCTED ON TRIBAL LANDS. ACTIVITIES TO BE PERFORMED THE SWINOMISH PORT AUTHORITY A GOVERNMENTAL SUBDIVISION OF THE SWINOMISH INDIAN TRIBAL COMMUNITY, PROPOSES TO DEVELOP A PORT MASTER PLAN THAT EVALUATES THE EXISTING PORT INFRASTRUCTURE ASSESSES THE COMMUNITYS CURRENT AND FUTURE NEED FOR PORT FACILITIES AND SERVICES AND DEVELOPS A RANGE OF INFRASTRUCTURE SOLUTIONS. THE PROJECT WILL ALSO CONSIST OF DESIGN AND CONSTRUCTION OF A BOAT RAMP COMPLETION OF DESIGN AND ENGINEERING FOR UPGRADES TO A COMMERCIAL PIER AND REPLACEMENT OF A MOORING FLOAT. THE PROJECT WILL INCLUDE THE FOLLOWING COMPONENTS COMPONENT 1 PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT FACILITATES THE DEVELOPMENT OF THE COMPREHENSIVE PORT MASTER PLAN INCLUDING RESEARCH DATA COLLECTION AND DATA ANALYSIS. DEVELOPS AND IMPLEMENTS A COMMUNITY OUTREACH PLAN TO SUPPORT THE PORT MASTER PLANNING PROCESS. PROCURES ALL PLANNING DESIGN AND ENGINEERING SUPPORT NECESSARY TO SUPPORT THE PROJECT IN COMPLIANCE WITH TRIBAL AND FEDERAL RULES. IMPLEMENTS ALL PHASES OF DEVELOPMENT FOR PORT AUTHORITY INFRASTRUCTURE PRIORITY PROJECTS THAT EMERGE FROM COMPLETION OF COMPONENT 2 IN ADDITION TO WORK IN COMPONENTS 3 AND 4 INCLUDING FEASIBILITY DESIGN PERMITTING PROJECT FINANCING AND CONSTRUCTION MANAGEMENT AS APPLICABLE. COMPONENT 2 DEVELOPMENT OF A PORT MASTER PLAN THE PORT MASTER PLAN DEVELOPMENT PROCESS WILL INCLUDE PLANNING FEASIBILITY ANALYSIS REVENUE FORECASTING ENVIRONMENTAL REVIEW PERMITTING AND PRELIMINARY ENGINEERING AND DESIGN WORK FOR FUTURE PRIORITY CAPITAL PROJECTS INCLUDING ELECTRIFICATION PLANNING TO BRING POWER TO THE PIER AND ASSOCIATED PORT FACILITIES AND PLANNING TO ADDRESS THE PORTS ABILITY TO WITHSTAND PROBABLE OCCURRENCE OR RECURRENCE OF AN EMERGENCY OR MAJOR DISASTER. EVALUATE THE EXISTING INFRASTRUCTURE ASSESS THE COMMUNITYS NEEDS FOR PORT FACILITIES AND SERVICES AND IDENTIFY A RANGE OF PROPOSED INFRASTRUCTURE SOLUTIONS TO MEET THOSE NEEDS AND CONDUCT PRELIMINARY ENGINEERING AND DESIGN WORK FOR PRIORITY PROJECTS.THE PORT MASTER PLAN WILL ASSESS CURRENT AND FUTURE NEEDS AND ADDRESS THE FUTURE DEVELOPMENT OF PORT INFRASTRUCTURE AND OTHER CAPABILITIES AND CAPACITIES WITH A 10 TO 30 YEAR PLANNING HORIZON. COMPONENT 3 ENVIRONMENTAL REVIEW AND MITIGATION OF PROJECT NEPA DOCUMENT DEVELOPMENT INCLUDING THE BIOLOGICAL ASSESSMENT SUBMERGED AQUATIC VEGETATION SURVEY AND PERMITTING PREPARATION FOR JOINT AQUATIC RESOURCES PERMIT APPLICATION AND SECTION 408. PROJECT MANAGEMENT. PILING REMOVAL AND ENVIRONMENTAL MITIGATION MEASURES. COMPONENT 4 BOAT RAMP CONSTRUCTION AND COMMERCIAL PIER DOCK FINAL DESIGN BOAT RAMP CONSTRUCTION STRUCTURAL AND CIVIL ENGINEERING CONCEPT RAMP LAYOUT PLAN AND PROFILE SHOWING ELEVATIONS AND CUT FILL VOLUMES. CONCEPT SITE PLAN WITH GRADING. PERFORM PRELIMINARY ANALYSIS TO DEVELOP PILE LAYOUT AND SIZING. TRUCK AND BOAT TRAILER TURNING MOVEMENT EXHIBITS. REVIEW OF HABITAT RESTORATION OPPORTUNITIES ASSOCIATED WITH THE BOAT LAUNCH. CONSULT WITH THE SWINOMISH STAKEHOLDERS THROUGHOUT PERFORMANCE OF THE WORK TO ENSURE DESIGN DEVELOPMENT MEETS THE OPERATIONAL NEEDS OF THE FISHING FLEET. SITE SPECIFIC ROUGH ORDER OF MAGNITUDE ROM COSTS FOR FINAL DESIGN PERMITTING AND CONSTRUCTION. DEVELOP ANTICIPATED PROJECT DURATION FOR DESIGN PERMITTING AND CONSTRUCTION. CONSTRUCT BOAT RAMP IN ACCORDANCE WITH FINAL DESIGN AND ALLOWABLE WORK WINDOW. PERFORM PROJECT MITIGATION MEASURES AS PRESCRIBED BY ENVIRONMENTAL REVIEW. MOORING FLOAT REPLACEMENT COMPLETE FINAL MOORING FLOAT DESIGN REPLACE EXISTING MOORING FLOAT COMMERCIAL PIER DOCK FINAL DESIGN COMPLETE ALTERNATIVES ANALYSIS STUDY AND SELECT REPLACEMENT OPTION. DEVELOP ROM COSTS FOR FINAL ANALYSIS DESIGN AND DEVELOPMENT OF CONSTRUCTION DOCUMENTS. IDENTIFY REQUIRED PERMITS. IDENTIFY MITIGATION ALTERNATIVES. DELIVERABLES EXPECTED OUTCOMES PERFORMANCE MEASURE TABLE FROM SCHEDULE G PAGE 11 OF THE GRANT AGREEMENT. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL VESSEL CALLS PER YEAR. MEASURES THE NUMBER OF VESSELS CALLING TO THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE: VESSEL TYPE EG CONTAINER BULK RORO LNG FREIGHT CAPACITY VESSEL LENGTH OR OTHER. MEASURE GROSS TONS. MEASUREMENT FREQUENCY QUARTERLY.CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL TONS OF CARGO MOVED PER YEAR. CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY SWINOMISH INDIAN TRIBAL COMMUNITY. SUBRECIPIENT ACTIVITIES NONE.

Project Grant (B) · Maritime Administration · to Swinomish Indian Tribal Community (UEI M4EWJ7AWAD17) · data as of 2026-11-14

Obligated to date$11.07M1 action
Period2025-10-30 → 2025-10-30first to last action

What it is

Program
Port Infrastructure Development Program (Assistance Listing 20.823)
Where the work is
Douglas, WI · district WI-07

Obligations by fiscal year

FY2026$11.07M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2025-10-30. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2025-10-30New award$11.07MAWARD PURPOSE THE PROJECT CONSISTS OF FOUR COMPONENTS 1 DEVELOPMENT OF A PORT MASTER PLAN THAT EVALUATES THE EXISTING INFRASTRUCTURE ASSESSES THE COMMUNITYS NEEDS FOR PORT FACILITIES AND SERVICES IDENTIFIES A RANGE OF PROPOSED INFRASTRUCTURE SOLUTIONS TO…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗