| 693JF72344040↗ | Department of Transportation | SWINOMISH INDIAN TRIBAL COMMUNITY | PROJECT GRANT (B) | 2025-10-30 | 2025-10-30 | 1 | AWARD PURPOSE THE PROJECT CONSISTS OF FOUR COMPONENTS 1 DEVELOPMENT OF A PORT MASTER PLAN THAT EVALUATES THE EXISTING INFRASTRUCTURE ASSESSES THE COMMUNITYS NEEDS FOR PORT FACILITIES AND SERVICES IDENTIFIES A RANGE OF PROPOSED INFRASTRUCTURE SOLUTIONS TO MEET THOSE NEEDS AND CONDUCTS PRELIMINARY ENGINEERING AND DESIGN WORK FOR PRIORITY PROJECTS 2 DESIGN AND CONSTRUCTION OF A BOAT RAMP 3 COMPLETION OF DESIGN AND ENGINEERING FOR UPGRADES TO A COMMERCIAL PIER AND 4 REPLACEMENT OF A MOORING FLOAT. THE BOAT RAMP AND MOORING FLOAT WILL BE CONSTRUCTED ON TRIBAL LANDS. ACTIVITIES TO BE PERFORMED THE SWINOMISH PORT AUTHORITY A GOVERNMENTAL SUBDIVISION OF THE SWINOMISH INDIAN TRIBAL COMMUNITY, PROPOSES TO DEVELOP A PORT MASTER PLAN THAT EVALUATES THE EXISTING PORT INFRASTRUCTURE ASSESSES THE COMMUNITYS CURRENT AND FUTURE NEED FOR PORT FACILITIES AND SERVICES AND DEVELOPS A RANGE OF INFRASTRUCTURE SOLUTIONS. THE PROJECT WILL ALSO CONSIST OF DESIGN AND CONSTRUCTION OF A BOAT RAMP COMPLETION OF DESIGN AND ENGINEERING FOR UPGRADES TO A COMMERCIAL PIER AND REPLACEMENT OF A MOORING FLOAT. THE PROJECT WILL INCLUDE THE FOLLOWING COMPONENTS
COMPONENT 1 PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT FACILITATES THE DEVELOPMENT OF THE COMPREHENSIVE PORT MASTER PLAN INCLUDING RESEARCH DATA COLLECTION AND DATA ANALYSIS. DEVELOPS AND IMPLEMENTS A COMMUNITY OUTREACH PLAN TO SUPPORT THE PORT MASTER PLANNING PROCESS. PROCURES ALL PLANNING DESIGN AND ENGINEERING SUPPORT NECESSARY TO SUPPORT THE PROJECT IN COMPLIANCE WITH TRIBAL AND FEDERAL RULES. IMPLEMENTS ALL PHASES OF DEVELOPMENT FOR PORT AUTHORITY INFRASTRUCTURE PRIORITY PROJECTS THAT EMERGE FROM COMPLETION OF COMPONENT 2 IN ADDITION TO WORK IN COMPONENTS 3 AND 4 INCLUDING FEASIBILITY DESIGN PERMITTING PROJECT FINANCING AND CONSTRUCTION MANAGEMENT AS APPLICABLE. COMPONENT 2 DEVELOPMENT OF A PORT MASTER PLAN THE PORT MASTER PLAN DEVELOPMENT PROCESS WILL INCLUDE PLANNING FEASIBILITY ANALYSIS REVENUE FORECASTING ENVIRONMENTAL REVIEW PERMITTING AND PRELIMINARY ENGINEERING AND DESIGN WORK FOR FUTURE PRIORITY CAPITAL PROJECTS INCLUDING ELECTRIFICATION PLANNING TO BRING POWER TO THE PIER AND ASSOCIATED PORT FACILITIES AND PLANNING TO ADDRESS THE PORTS ABILITY TO WITHSTAND PROBABLE OCCURRENCE OR RECURRENCE OF AN EMERGENCY OR MAJOR DISASTER. EVALUATE THE EXISTING INFRASTRUCTURE ASSESS THE COMMUNITYS NEEDS FOR PORT FACILITIES AND SERVICES AND IDENTIFY A RANGE OF PROPOSED INFRASTRUCTURE SOLUTIONS TO MEET THOSE NEEDS AND CONDUCT PRELIMINARY ENGINEERING AND DESIGN WORK FOR PRIORITY PROJECTS.THE PORT MASTER PLAN WILL ASSESS CURRENT AND FUTURE NEEDS AND ADDRESS THE FUTURE DEVELOPMENT OF PORT INFRASTRUCTURE AND OTHER CAPABILITIES AND CAPACITIES WITH A 10 TO 30 YEAR PLANNING HORIZON. COMPONENT 3 ENVIRONMENTAL REVIEW AND MITIGATION OF PROJECT NEPA DOCUMENT DEVELOPMENT INCLUDING THE BIOLOGICAL ASSESSMENT SUBMERGED AQUATIC VEGETATION SURVEY AND PERMITTING PREPARATION FOR JOINT AQUATIC RESOURCES PERMIT APPLICATION AND SECTION 408. PROJECT MANAGEMENT. PILING REMOVAL AND ENVIRONMENTAL MITIGATION MEASURES. COMPONENT 4 BOAT RAMP CONSTRUCTION AND COMMERCIAL PIER DOCK FINAL DESIGN BOAT RAMP CONSTRUCTION STRUCTURAL AND CIVIL ENGINEERING CONCEPT RAMP LAYOUT PLAN AND PROFILE SHOWING ELEVATIONS AND CUT FILL VOLUMES. CONCEPT SITE PLAN WITH GRADING. PERFORM PRELIMINARY ANALYSIS TO DEVELOP PILE LAYOUT AND SIZING. TRUCK AND BOAT TRAILER TURNING MOVEMENT EXHIBITS. REVIEW OF HABITAT RESTORATION OPPORTUNITIES ASSOCIATED WITH THE BOAT LAUNCH. CONSULT WITH THE SWINOMISH STAKEHOLDERS THROUGHOUT PERFORMANCE OF THE WORK TO ENSURE DESIGN DEVELOPMENT MEETS THE OPERATIONAL NEEDS OF THE FISHING FLEET. SITE SPECIFIC ROUGH ORDER OF MAGNITUDE ROM COSTS FOR FINAL DESIGN PERMITTING AND CONSTRUCTION. DEVELOP ANTICIPATED PROJECT DURATION FOR DESIGN PERMITTING AND CONSTRUCTION. CONSTRUCT BOAT RAMP IN ACCORDANCE WITH FINAL DESIGN AND ALLOWABLE WORK WINDOW. PERFORM PROJECT MITIGATION MEASURES AS PRESCRIBED BY ENVIRONMENTAL REVIEW. MOORING FLOAT REPLACEMENT COMPLETE FINAL MOORING FLOAT DESIGN REPLACE EXISTING MOORING FLOAT COMMERCIAL PIER DOCK FINAL DESIGN COMPLETE ALTERNATIVES ANALYSIS STUDY AND SELECT REPLACEMENT OPTION. DEVELOP ROM COSTS FOR FINAL ANALYSIS DESIGN AND DEVELOPMENT OF CONSTRUCTION DOCUMENTS. IDENTIFY REQUIRED PERMITS. IDENTIFY MITIGATION ALTERNATIVES. DELIVERABLES EXPECTED OUTCOMES PERFORMANCE MEASURE TABLE FROM SCHEDULE G PAGE 11 OF THE GRANT AGREEMENT. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY
TOTAL VESSEL CALLS PER YEAR. MEASURES THE NUMBER OF VESSELS CALLING TO THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE: VESSEL TYPE EG CONTAINER BULK RORO LNG FREIGHT CAPACITY VESSEL LENGTH OR OTHER. MEASURE GROSS TONS. MEASUREMENT FREQUENCY QUARTERLY.CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL TONS OF CARGO MOVED PER YEAR. CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY SWINOMISH INDIAN TRIBAL COMMUNITY. SUBRECIPIENT ACTIVITIES NONE. | $11.07M |
| 64G970048↗ | Department of Health and Human Services | SWINOMISH INDIAN TRIBAL COMMUNITY | DIRECT PAYMENT FOR SPECIFIED USE, AS A SUBSIDY OR OTHER NON-REIMBURSABLE DIRECT FINANCIAL AID (C) | 2025-10-27 | 2026-07-02 | 10 | SELF-GOVERNANCE | $5.20M |
| A23AV01149↗ | Department of the Interior | SWINOMISH INDIAN TRIBAL COMMUNITY | DIRECT PAYMENT FOR SPECIFIED USE, AS A SUBSIDY OR OTHER NON-REIMBURSABLE DIRECT FINANCIAL AID (C) | 2026-08-19 | 2026-08-19 | 1 | IRA NOAA REIMBURSABLE FUNDING DISTRIBUTION PER THE APPROVED BIA/NOAA HATCHERY PLAN FOR MARBLEMOUNT HATCHERY NEW GROUNDWATER WELL AND PIPELINE CONSTRUCTION PROJECT PER AMENDMENT #16 TO THE 2014-2026 MYFA. | $2.00M |
| A26AV00215↗ | Department of the Interior | SWINOMISH INDIAN TRIBAL COMMUNITY | DIRECT PAYMENT FOR SPECIFIED USE, AS A SUBSIDY OR OTHER NON-REIMBURSABLE DIRECT FINANCIAL AID (C) | 2025-12-29 | 2026-09-18 | 7 | FEDERAL POWER COMPLIANCE (FERC) DISTRIBUTION FOR PROJECT NAME: SWINOMISH PARTICIPATION IN THE SKAGIT RIVER RELICENSING AND SETTLEMENT AGREEMENT EARLY ACTION IMPLEMENTATION. | $1.88M |
| A24AV00364↗ | Department of the Interior | SWINOMISH INDIAN TRIBAL COMMUNITY | DIRECT PAYMENT FOR SPECIFIED USE, AS A SUBSIDY OR OTHER NON-REIMBURSABLE DIRECT FINANCIAL AID (C) | 2026-03-11 | 2026-03-11 | 1 | DISTRIBUTIONS FOR PAYMENTS FOR TRIBAL LEASES FOR: PLANNING AND COMMUNITY DEVELOPMENT BUILDING AND SOCIAL SERVICE BUILDING; 105(L) LEASES CY 2024 FOR THE PERIOD OF 01/01/2024 TO 12/31/2024, PAYMENTS FOR TRIBAL LEASE PROGRAM. | $872.0K |
| A23AV00214↗ | Department of the Interior | SWINOMISH INDIAN TRIBAL COMMUNITY | DIRECT PAYMENT FOR SPECIFIED USE, AS A SUBSIDY OR OTHER NON-REIMBURSABLE DIRECT FINANCIAL AID (C) | 2026-03-11 | 2026-03-11 | 1 | DISTRIBUTIONS FOR PAYMENTS FOR TRIBAL LEASES FOR: PLANNING AND COMMUNITY DEVELOPMENT BUILDING AND SOCIAL SERVICE BUILDING; 105(L) LEASES CY 2023 FOR THE PERIOD OF 02/15/2023 TO 12/31/2023, PAYMENTS FOR TRIBAL LEASE PROGRAM. | $719.4K |
| 03J07201↗ | Environmental Protection Agency | SWINOMISH INDIAN TRIBAL COMMUNITY | FORMULA GRANT (A) | 2025-12-03 | 2026-07-21 | 2 | DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING FOR THE OPERATION OF THE SWINOMISH INDIAN TRIBAL COMMUNITY CONTINUING ENVIRONMENTAL PROGRAMS WHILE GIVING IT GREATER FLEXIBILITY TO IMPROVE ENVIRONMENTAL PERFORMANCE, ACHIEVE ADMINISTRATIVE SAVINGS AND STRENGTHEN THE PARTNERSHIP BETWEEN THE TRIBE AND EPA. THIS AGREEMENT PROVIDES FUNDS TO BUILD AND IMPLEMENT ENVIRONMENTAL PROGRAMS AND ADDRESS ENVIRONMENTAL AND PUBLIC HEALTH CONCERNS RELATED TO POLLUTION.ACTIVITIES:ACTIVITIES TO BE PERFORMED UNDER THIS AGREEMENT INCLUDE PLANNING, DEVELOPING AND ESTABLISHING CORE ENVIRONMENTAL PROGRAM CAPACITIES RELATED TO ADMINISTRATIVE AND FINANCIAL SYSTEMS, INFORMATION MANAGEMENT, ENVIRONMENTAL BASELINE NEEDS ASSESSMENT, PUBLIC EDUCATION, AND TECHNICAL/ANALYTICAL DATA. THE RECIPIENT WILL CONDUCT WATER QUALITY PLANNING, MONITORING, DATA MANAGEMENT AND REPORTING, AND NON-POINT SOURCE ASSESSMENT AND MANAGEMENT ACTIVITIES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE WORK INCLUDES DELIVERABLES ASSOCIATED WITH MANAGING CONTINUING ENVIRONMENTAL PROGRAMS AND ACTIVITIES TO PROTECT AND MAINTAIN AIR, WATER, LAND AND DATA QUALITY, INCLUDING ENVIRONMENTAL PROTECTION AND MANAGEMENT, NON-POINT SOURCE ACTIVITIES, AND MANAGEMENT OF DATA. THE RECIPIENT WILL ATTEND PROFESSIONAL DEVELOPMENT TRAINING, CONTINUE TO BUILD THE TRIBE'S ENVIRONMENTAL PROGRAMS, CONDUCT WATER QUALITY MONITORING ACTIVITIES, DRAFT A WATER QUALITY REPORT AND SUBMIT TO EPA, AND CONDUCT NON-POINT SOURCE PROTECTION ACTIVITIES. EXPECTED OUTCOMES INCLUDE INCREASED SKILLS AND KNOWLEDGE OF TRIBAL ENVIRONMENTAL STAFF, INCREASED TRIBAL KNOWLEDGE OF REGIONAL AND NATIONAL ENVIRONMENTAL ISSUES, ENHANCED WORKING RELATIONSHIPS WITH PARTNERS, INCREASED UNDERSTANDING OF POTENTIAL CUMULATIVE IMPACTS TO HUMAN HEALTH, INCREASED KNOWLEDGE OF TRIBAL WATERS TO ASSIST THE TRIBE IN MAKING SOUND DECISIONS REGARDING WATER RESOURCE MANAGEMENT, AND THE TRIBE'S LANDS, AIR AND WATER WILL BECOME HEALTHIER. DIRECT BENEFICIARIES OF THIS GRANT ARE MEMBERS OF THE TRIBE. | $589.0K |
| 03J24401↗ | Environmental Protection Agency | SWINOMISH INDIAN TRIBAL COMMUNITY | GRANT | 2026-06-15 | 2026-06-15 | 1 | DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO THE SWINOMISH INDIAN TRIBAL COMMUNITY. SPECIFICALLY, THE RECIPIENT WILL REDUCE EMISSIONS OF DIESEL PARTICULATE MATTER, NOX, AND EXPOSURE TO DIESEL AIR TOXICS ACROSS THE SWINOMISH RESERVATION AND NEIGHBORING COMMUNITIES IN SKAGIT COUNTY, WASHINGTON THROUGH THE REPLACEMENT OF ENGINES WITH LOWER-EMITTING NEWER TECHNOLOGIES.
ACTIVITIES:THE RECIPIENT WILL REPLACE 1 TIER 0 WITH TIER 3 MARINE PROPULSION ENGINE AND 1 (ONE) 1999 CLASS 6 TRUCK WITH CLASS 6 TRUCK.
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE A REDUCTION OF FINE PARTICULATE (PM2.5) EMISSIONS FROM THE APPLICABLE VESSEL AND VEHICLE BY 92.8% ANNUALLY, IN ADDITION TO REDUCTIONS IN NITROUS OXIDES (85%), HYDROCARBONS (83%), CARBON MONOXIDE (86%) AND CARBON DIOXIDE (51%).
THE EXPECTED OUTCOMES INCLUDE REPOWERING A MARINE VESSEL WITH A LOW-EMISSION TIER 3 ENGINE AND REPOWERING AN OFF-HIGHWAY CLASS 6 MUNICIPAL TRUCK WITH A CLASS 6 ZERO EMISSIONS VEHICLE.
THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF SKAGIT COUNTY, WASHINGTON AND SURROUNDING COMMUNITIES. | $543.6K |