693JF72440068↗
Puerto Rico Ports Authority received this grant or assistance award from Maritime Administration: $21.22M obligated so far for national infrastructure investments. Its latest action was on 2026-02-19.
Key facts · data as of Nov 14, 2026
- Recipient
- Puerto Rico Ports Authority
- Awarding agency
- Maritime Administration (Department of Transportation)
- Obligated to date
- $21.22M
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.
Cite this page: SpendQuery, Award 693JF72440068, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72440068_069
Puerto Rico Ports Authority: all federal awards · Department of Transportation: spending
AWARD PURPOSE THIS PROJECT WILL PLAN DESIGN AND RECONSTRUCT WHARF D OF THE PUERTO NUEVO DOCKS. PROJECT ACTIVITIES WILL INCLUDE DEMOLITION AND DISPOSAL OF THE EXISTING CONCRETE PLATFORM UNDERWATER INSPECTION AND DEBRIS REMOVAL RECONSTRUCTION OF THE CONCRETE PLATFORM AND INSTALLATION OF A NEW FENDER SYSTEM AND BOLLARDS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL HAVE TWO COMPONENTS COMPONENT 1 ARCHITECTURAL ENGINEERING A AND E PRELIMINARY DESIGN AND PROCUREMENT SUPPORT DEVELOP PLANS SPECIFICATIONS AND COST ESTIMATE DOCUMENTS UP TO A 30 PERCENT COMPLETION STAGE FOR THE PROJECT. THE 30 PERCENT COMPLETION STAGE DESIGN DOCUMENTS WILL BE USED IN THE PROCUREMENT OF A DESIGN BUILD REQUEST FOR PROPOSAL RFP TO IMPLEMENT THE PROJECT. THE CONSULTANT WILL ALSO DEVELOP DESIGN CRITERIA GUIDELINES FOR THE REMAINING 70 PERCENT DESIGN IMPLEMENTATION AND OPERATION. PROVIDE BID SUPPORT AND ASSIST IN THE REQUEST FOR INFORMATION RFI PROCESS DURING DESIGN BUILD BID PROCESS. COMPONENT 2 DESIGN BUILD CONTRACT AND CONSULTING AND PROJECT MANAGEMENT SERVICES. ELEMENT 1 DESIGN COMPLETE DESIGN BUILD PACKAGE FROM 30 100 PERCENT. ELEMENT 2 CONSTRUCTION OF WHARF D DEMOLITION AND DISPOSAL DEMOLITION AND DISPOSAL OF EXISTING PLATFORM AT WHARF D MEASURING 400 LINEAR FEET LF WILL BE SYSTEMATICALLY DEMOLISHED. THIS WILL INCLUDE THE REMOVAL AND DISPOSAL OF BOTH THE CONCRETE ELEMENTS AND THE SUPPORTING STEEL PILES. UNDERWATER INSPECTION A THOROUGH UNDERWATER SURVEY WILL BE CONDUCTED TO DETECT AND CATALOGUE SUBMERGED DEBRIS. SUBSEQUENT REMOVAL OF IDENTIFIED DEBRIS WILL BE CARRIED OUT TO ENSURE A CLEAR SITE FOR RECONSTRUCTION. RECONSTRUCTION RECONSTRUCTION OF THE COFFER CELL OR PILE SUPPORTED PLATFORM AND THE STEEL SHEET PILE PLATFORM INCLUDING A CONCRETE DECK AND CURB AND STEEL SHEET PILES FOR BOTH PLATFORMS NEW WALE BEAM FOR THE COFFER CELL PLATFORM. FENDER BOLLARDS AND ANY PERTINENT ANCILLARY SYSTEM THE SCOPE OF THE PROJECT WILL ALSO INCLUDE THE FITTING OF A FENDER SYSTEM AND THE PLACEMENT OF MOORING STRUCTURES BOLLARDS AT EACH WHARF WHICH ARE CRUCIAL FOR THE SAFE BERTHING OF VESSELS AND THE EFFECTIVE DISTRIBUTION OF MOORING FORCES. ELEMENT 3 PROJECT MANAGEMENT CONSULTING AND PROJECT MANAGEMENT SERVICES THIS WILL INCLUDE ASSISTANCE DURING THE 30 PERCENT DESIGN PROCESS UP TO 100 PERCENT FINAL CONSTRUCTION DOCUMENTS. CONSTRUCTION PHASE DURING THE CONSTRUCTION PHASE FULL TIME PERSONNEL WILL CONDUCT ALL ACTIVITIES REQUIRED FOR THE DESIGN BUILD CONTRACT ADMINISTRATION INCLUDING BUT NOT LIMITED TO ADMINISTRATIVE SUPPORT COMPLIANCE WITH THE PLANS AND SPECIFICATIONS AND ENFORCEMENT AND QUALITY ASSURANCE OF THE PLANS IN COMPLIANCE WITH FEDERAL AND LOCAL REGULATIONS. ADMINISTER THE CONSTRUCTION CONTRACT THROUGH THE RECIPIENTS DESIGNATED OFFICIALS INCLUDING ALL REQUIRED PROJECT MANAGEMENT ACTIVITIES. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 11 SCHEDULE G OF THE GRANT AGREEMENT. PERFORMANCE MEASURE CARGO VOLUME GROSS TONS. UNIT REPORTED TOTAL TONS OF CARGO MOVED BY VESSEL IN THE AREA DEFINED BY THE PROJECT STUDY AREA. TONS. PERFORMANCE MEASURE VESSEL CALLS. UNIT REPORTED TOTAL VESSEL CALLS PER YEAR. INTENDED BENEFICIARY PUERTO RICO PORTS AUTHORITY. SUBRECIPIENT ACTIVITIES NONE.
What it is
- Program
- National Infrastructure Investments (Assistance Listing 20.933)
- Where the work is
- San Juan, PR · district PR-98
- Funding law
- Infrastructure law (IIJA)
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
1 action since 2026-02-19. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-02-19 | New award | $21.22M | AWARD PURPOSE THIS PROJECT WILL PLAN DESIGN AND RECONSTRUCT WHARF D OF THE PUERTO NUEVO DOCKS. PROJECT ACTIVITIES WILL INCLUDE DEMOLITION AND DISPOSAL OF THE EXISTING CONCRETE PLATFORM UNDERWATER INSPECTION AND DEBRIS REMOVAL RECONSTRUCTION OF THE CONCRETE… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗