693JF72540036↗

Puerto Rico Ports Authority received this grant or assistance award from Maritime Administration: $53.53M obligated so far for port infrastructure development program. Its latest action was on 2026-01-29.

Key facts · data as of Nov 20, 2026

Recipient
Puerto Rico Ports Authority
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$53.53M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 20, 2026.

Cite this page: SpendQuery, Award 693JF72540036, data as of Nov 20, 2026, https://spendquery.com/award?id=ASST_NON_693JF72540036_069

AWARD PURPOSE THE PROJECT WILL RESTORE AND MODERNIZE CRITICAL INFRASTRUCTURE AT THE PUERTO NUEVO DOCKS IN THE PORT OF SAN JUAN PUERTO RICO. IT WILL RECONSTRUCT WHARVES N AND O INCLUDING DEMOLITION AND DISPOSAL OF THE EXISTING PLATFORMS RECONSTRUCTION OF THE WHARVES AND INSTALLATION OF NEW FENDER SYSTEMS AND BOLLARDS. ACTIVITIES TO BE PERFORMED COMPONENT 1 ARCHITECTURAL ENGINEERING PRELIMINARY DESIGN AND PROCUREMENT SUPPORT. DEVELOP PLANS SPECIFICATIONS AND COST ESTIMATE DOCUMENTS UP TO A 30 PERCENT COMPLETION STAGE FOR THE PROJECT. THE 30 PERCENT COMPLETION STAGE DESIGN DOCUMENTS WILL BE USED IN THE PROCUREMENT OF A DESIGN BUILD REQUEST FOR PROPOSAL TO IMPLEMENT THE PROJECT. THE CONSULTANT WILL ALSO DEVELOP DESIGN CRITERIA GUIDELINES FOR THE REMAINING 70 PERCENT DESIGN, IMPLEMENTATION AND OPERATION. PROVIDE BID SUPPORT AND ASSIST IN THE REQUEST FOR INFORMATION PROCESS DURING DESIGN BUILD BID PROCESS. COMPONENT 2 DESIGN BUILD CONTRACT AND CONSULTING AND PROJECT MANAGEMENT SERVICES. ELEMENT 1 WHARF N DEMOLITION AND DISPOSAL EXISTING PLATFORMS AT WHARF N MEASURING 12000 SQUARE FEET AND EXISTING PLATFORMS AT WHARF O MEASURING 8000 SQUARE FEET WILL BE SYSTEMATICALLY DEMOLISHED. THIS WILL INCLUDE THE REMOVAL AND DISPOSAL OF BOTH THE CONCRETE ELEMENTS AND THE SUPPORTING STEEL PILES. UNDERWATER INSPECTION A THOROUGH UNDERWATER SURVEY WILL BE CONDUCTED TO DETECT AND CATALOGUE ANY SUBMERGED DEBRIS. SUBSEQUENT REMOVAL OF IDENTIFIED DEBRIS WILL BE CARRIED OUT TO ENSURE A CLEAR SITE FOR RECONSTRUCTION. WHARF N RECONSTRUCTION THE SHEET PILE PLATFORM WILL BE RECONSTRUCTED INCLUDING A CONCRETE DECK AND CURB AND STEEL SHEET PILES FOR BOTH PLATFORMS NEW WALE BEAM FOR THE COFFER CELL PLATFORM AND NEW STEEL PILES FOR THE STEEL SHEET PILE PLATFORM. ELEMENT 2 WHARF O. WHARF O RECONSTRUCTION THE STEEL SHEET PILE BULKHEAD PLATFORM CONCRETE MOORING DOLPHIN AND CATWALK PLATFORM AT WHARF O WILL BE RECONSTRUCTED WITH A CONCRETE DECK AND CONCRETE FILLED PILES. THE BULKHEAD PLATFORM WILL INCLUDE A NEARLY 600 LINEAR FOOT STEEL SHEET PILE AND STEEL WALE BEAMS FOR STRUCTURE. THE CONCRETE MOORING DOLPHIN AND CATWALK PLATFORM WILL INCLUDE AN EIGHT FOOT HIGH CONCRETE MOORING DOLPHIN CAP. FENDER SYSTEM AND BOLLARDS INSTALLATION THE SCOPE ALSO INCLUDES THE FITTING OF A FENDER SYSTEM AND THE PLACEMENT OF MOORING STRUCTURES BOLLARDS AT EACH WHARF WHICH ARE CRUCIAL FOR THE SAFE BERTHING OF VESSELS AND THE EFFECTIVE DISTRIBUTION OF MOORING FORCES. CONSULTING AND PROJECT MANAGEMENT SERVICES THIS PHASE OF THE WORK WILL INCLUDE ASSISTING DURING THE COMPLETION OF DESIGN 70 PERCENT THROUGH FINAL CONSTRUCTION DOCUMENTS 100 PERCENT. ALSO ASSISTING THROUGH THE CONSTRUCTION UNTIL THE CLOSEOUT OF EACH PROJECT COMPONENT. THE CONSULTANT MAY BE CALLED UPON TO PROVIDE A PROJECT MANAGEMENT TEAM TO SERVE AS REPRESENTATIVE THROUGH A PORTION OF OR FULL CONSTRUCTION OF THE PROJECT. CONSTRUCTION PHASE DURING THE CONSTRUCTION PHASE THERE WILL BE FULL TIME PERSONNEL AT THE FIELD FOR EACH PROJECT PHASE TO CONDUCT ALL ACTIVITIES REQUIRED FOR THE CONSTRUCTION CONTRACT ADMINISTRATION INCLUDING BUT NOT LIMITED TO ADMINISTRATIVE SUPPORT ENSURING COMPLIANCE WITH THE DESIGN AND SPECIFICATIONS ENFORCEMENT OF FEDERAL AND STATE REGULATIONS AND QUALITY ASSURANCE IN ACCORDANCE WITH THE DESIGN AND PUERTO RICOS LOCAL REGULATIONS. DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 14 OF THE GRANT AGREEMENT MEASURE GROSS TONS SHORT OR METRIC.CATEGORY AND DESCRIPTION MEASUREMENT ECONOMIC COMPETITIVENESS THE MOVEMENT OF GROSS TONNAGE OF FREIGHT IN THE AREA DEFINED BY THE PROJECT STUDY AREA. SECONDARY VARIABLES TYPES OF FREIGHT TYPES OF INTERMODAL TRANSPORT. FREQUENCY QUARTERLY. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION MEASUREMENT ECONOMIC COMPETITIVENESS AND OPPORTUNITY THE NUMBER OF VESSELS CALLING TO THE AREA DEFINED IN THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE: VESSEL TYPE CONTAINER BULK RORO LNG FREIGHT CAPACITY VESSEL LENGTH, OR OTHER.FREQUENCY QUARTERLY. INTENDED BENEFICIARY PUERTO RICO PORTS AUTHORITY. SUBRECIPIENT ACTIVITIES NONE.

Project Grant (B) · Maritime Administration · to Puerto Rico Ports Authority (UEI XJULBJJEK958) · data as of 2026-11-20

Obligated to date$53.53M1 action
Period2026-01-29 → 2026-01-29first to last action

What it is

Program
Port Infrastructure Development Program (Assistance Listing 20.823)
Where the work is
San Juan, PR · district PR-98

Obligations by fiscal year

FY2026$53.53M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-01-29. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-01-29New award$53.53MAWARD PURPOSE THE PROJECT WILL RESTORE AND MODERNIZE CRITICAL INFRASTRUCTURE AT THE PUERTO NUEVO DOCKS IN THE PORT OF SAN JUAN PUERTO RICO. IT WILL RECONSTRUCT WHARVES N AND O INCLUDING DEMOLITION AND DISPOSAL OF THE EXISTING PLATFORMS RECONSTRUCTION OF THE…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗