R22AP00675↗

El Paso Water Utilities Public Service Board received this grant or assistance award from Bureau of Reclamation: $2.75M obligated so far for watersmart water recycling. Its latest action was on 2026-06-25.

Key facts · data as of Nov 25, 2026

Recipient
El Paso Water Utilities Public Service Board
Awarding agency
Bureau of Reclamation (Department of the Interior)
Obligated to date
$2.75M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 25, 2026.

Cite this page: SpendQuery, Award R22AP00675, data as of Nov 25, 2026, https://spendquery.com/award?id=ASST_NON_R22AP00675_014

THE AQUIFER STORAGE AND RECOVERY ASR PROJECT IS A CRITICAL WATER SUPPLY STRATEGY THAT WILL HELP EL PASO MANAGE DROUGHT, PROVIDE WATER 15,000 ACRE FEET PER YEAR FOR FUTURE HOMES AND BUSINESSES, AND ENHANCE LONG TERM SUSTAINABILITY OF THE HUECO BOLSON AQUIFER SYSTEM AN ADDITIONAL BENEFIT OF THE PROJECT IS THE CREATION OF MAN MADE FLOWS WITHIN THE ARROYO AS PART OF THE INFILTRATION PROCESS FOR THE PURPOSE OF PROVIDING 10 25 ACRES OF WETLANDS FOR HABITAT AND RECREATIONAL TRAILS THAT HABITAT WILL SUPPORT NUMEROUS WILDLIFE SPECIES COMMON TO EL PASO, PLUS SOME LISTED OR ENDANGERED SPECIES SUCH AS THE WILLOW FLYCATCHER, YELLOW BILLED CUCKOO, IBIS, AND PEREGRINE FALCON THE ARROYO WILL ALSO ATTRACT BIRDS, MAMMALS, AND REPTILES THAT COMMONLY VISIT THE EL PASO AND RIO BOSQUE AREAS FOR WATERING, SANCTUARY, NESTING, AND BREEDING PURPOSES THE NORTHEAST AQUIFER STORAGE AND RECOVERY ASR ENHANCED ARROYO PHASE I WILL CREATE LINEAR BASINS BY ENHANCING AN ARROYO WHICH WILL REPLACE THE EXISTING INFILTRATION BASINS THAT EL PASO WATER CURRENTLY USES TO RECHARGE THE HUECO BOLSON AQUIFER THE ENHANCED ARROYO SHALL RECEIVE HIGHLY TREATED WASTEWATER FROM THE FRED HERVEY WATER RECLAMATION PLANT THROUGH CONSTRUCTION OF THE PROPOSED EARTHWORK IMPROVEMENTS WHICH WILL ALLOW INFILTRATION OF WATERS INTO THE HUECO BOLSON THE PROJECT IS LOCATED IN NORTHEAST EL PASO JUST WEST OF MCCOMBS STREET AND PAINTED DUNES GOLF COURSE IN ADDITION TO EARTHWORK AND PIPELINE INJECTION FACILITIES, LANDSCAPE IMPROVEMENTS ALONG THE PROJECT LIMITS ARE INCLUDED IN THE SCOPE HIKE AND BIKE TRAILS, PLANTINGS, IRRIGATION SYSTEM,AMENITIES, ETC THE WORK COVERED UNDER THIS PROJECT WOULD PROVIDE A NEW INLET FOR THE TREATED WASTEWATER TO INFILTRATE INTO THE GROUND AND RECHARGE THE LOCAL AQUIFER THE OVERALL PROJECT CONSISTS OF THE FOLLOWING ITEMS MOBILIZATION, DEMOBILIZATION, EXCAVATION, TRENCH SAFETY SYSTEM, TRAFFIC CONTROL PLAN, 16 INCH, 20 INCH, AND 24 INCH PVC PIPING, GATE VALVES 16 INCH, 20 INCH, AND 24 INCH WITH BONNET BOX, HMAC PAVING FOR THE PARKING LOT AND HIKE AND BIKE TRAIL, AND WALKING TRAIL, CONCRETE HEADER CURB, CONCRETE WEIR STRUCTURES, ROCK WALLS, RETAINING WALLS, GABION BASKETS AND MATRESSES, CONCRETE DRIVEWAYS, MAINTENANCE ROAD WITH ROCK SCREENING, 8 INCH INJECTION PIPE, 8 INCH MOTOR OPERATED GATE VALVES, FLOW METER, LANDSCAPING AMENITIES TREES, BOULDERS, BOLLARDS, IRRIGATION SYSTEM, BENCHES, TRASH CANS, ETC MOTOR OPERATED VALVES MOV , ELECTRICAL AND SCADA SYSTEM INTEGRATION

Grant · Bureau of Reclamation · to El Paso Water Utilities Public Service Board (UEI Z738SDJQDVH4) · data as of 2026-11-25

Obligated to date$2.75M2 actions
Period2024-12-30 → 2026-06-25first to last action

What it is

Program
Watersmart Water Recycling (Assistance Listing 15.504)
Where the work is
TX

Obligations by fiscal year

FY2025$0
FY2026$2.75M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

2 actions since 2024-12-30. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-06-2502Revision$2.75MTHE AQUIFER STORAGE AND RECOVERY (ASR)PROJECT IS A CRITICAL WATER SUPPLY STRATEGY THAT WILL HELP EL PASO MANAGE DROUGHT, PROVIDE WATER (15,000 ACRE-FEET PER YEAR) FOR FUTURE HOMES AND BUSINESSES, AND ENHANCE LONG-TERM SUSTAINABILITY OF THE HUECO BOLSON…
2024-12-301Revision$0THE AQUIFER STORAGE AND RECOVERY (ASR)PROJECT IS A CRITICAL WATER SUPPLY STRATEGY THAT WILL HELP EL PASO MANAGE DROUGHT, PROVIDE WATER (15,000 ACRE-FEET PER YEAR) FOR FUTURE HOMES AND BUSINESSES, AND ENHANCE LONG-TERM SUSTAINABILITY OF THE HUECO BOLSON…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗