| R22AP00675↗ | Department of the Interior | EL PASO WATER UTILITIES PUBLIC SERVICE BOARD | GRANT | 2026-06-25 | 2026-06-25 | 1 | THE AQUIFER STORAGE AND RECOVERY (ASR)PROJECT IS A CRITICAL WATER SUPPLY STRATEGY THAT WILL HELP EL PASO MANAGE DROUGHT, PROVIDE WATER (15,000 ACRE-FEET PER YEAR) FOR FUTURE HOMES AND BUSINESSES, AND ENHANCE LONG-TERM SUSTAINABILITY OF THE HUECO BOLSON AQUIFER SYSTEM.AN ADDITIONAL BENEFIT OF THE PROJECT IS THE CREATION OF MAN-MADE FLOWS WITHIN THE ARROYO AS PART OF THE INFILTRATION PROCESS FOR THE PURPOSE OF PROVIDING 10-25 ACRES OF WETLANDS FOR HABITAT AND RECREATIONAL TRAILS. THAT HABITAT WILL SUPPORT NUMEROUS WILDLIFE SPECIES COMMON TO EL PASO, PLUS SOME LISTED OR ENDANGERED SPECIES SUCH AS THE WILLOW FLYCATCHER, YELLOW-BILLED CUCKOO, IBIS, AND PEREGRINE FALCON. THE ARROYO WILL ALSO ATTRACT BIRDS, MAMMALS, AND REPTILES THAT COMMONLY VISIT THE EL PASO AND RIO BOSQUE AREAS FOR WATERING, SANCTUARY, NESTING, AND BREEDING PURPOSES.THE NORTHEAST AQUIFER STORAGE AND RECOVERY (ASR) ENHANCED ARROYO PHASE I WILL CREATE LINEAR BASINS BY ENHANCING AN ARROYO WHICH WILL REPLACE THE EXISTING INFILTRATION BASINS THAT EL PASO WATER CURRENTLY USES TO RECHARGE THE HUECO BOLSON AQUIFER. THE ENHANCED ARROYO SHALL RECEIVE HIGHLY TREATED WASTEWATER FROM THE FRED HERVEY WATER RECLAMATION PLANT THROUGH CONSTRUCTION OF THE PROPOSED EARTHWORK IMPROVEMENTS WHICH WILL ALLOW INFILTRATION OF WATERS INTO THE HUECO BOLSON. THE PROJECT IS LOCATED IN NORTHEAST EL PASO JUST WEST OF MCCOMBS STREET AND PAINTED DUNES GOLF COURSE. IN ADDITION TO EARTHWORK AND PIPELINE INJECTION FACILITIES, LANDSCAPE IMPROVEMENTS ALONG THE PROJECT LIMITS ARE INCLUDED IN THE SCOPE (HIKE AND BIKE TRAILS, PLANTINGS, IRRIGATION SYSTEM,AMENITIES, ETC).THE WORK COVERED UNDER THIS PROJECT WOULD PROVIDE A NEW INLET FOR THE TREATED WASTEWATER TO INFILTRATE INTO THE GROUND AND RECHARGE THE LOCAL AQUIFER. THE OVERALL PROJECT CONSISTS OF THE FOLLOWING ITEMS: MOBILIZATION, DEMOBILIZATION, EXCAVATION, TRENCH SAFETY SYSTEM, TRAFFIC CONTROL PLAN, 16-INCH, 20-INCH, AND 24-INCH PVC PIPING, GATE VALVES (16-INCH, 20-INCH, AND 24-INCH) WITH BONNET BOX, HMAC PAVING FOR THE PARKING LOT AND HIKE AND BIKE TRAIL, AND WALKING TRAIL, CONCRETE HEADER CURB, CONCRETE WEIR STRUCTURES, ROCK WALLS, RETAINING WALLS, GABION BASKETS AND MATRESSES, CONCRETE DRIVEWAYS, MAINTENANCE ROAD WITH ROCK SCREENING, 8-INCH INJECTION PIPE, 8-INCH MOTOR OPERATED GATE VALVES, FLOW METER, LANDSCAPING AMENITIES (TREES, BOULDERS, BOLLARDS, IRRIGATION SYSTEM, BENCHES, TRASH CANS, ETC.) MOTOR OPERATED VALVES (MOV), ELECTRICAL AND SCADA SYSTEM INTEGRATION | $2.75M |
| R23AP00273↗ | Department of the Interior | EL PASO WATER UTILITIES PUBLIC SERVICE BOARD | PROJECT GRANT (B) | 2025-12-08 | 2025-12-15 | 2 | <P>THE PRIMARY BENEFIT OF THE ADVANCED WATER PURIFICATION FACILITY PROJECT IS THAT IT WILL INCREASE DROUGHT RESILIENCY, REDUCE GROUNDWATER USAGE, AND DELAY WATER IMPORTATION WHILE INTRODUCING THE MOST SUSTAINABLE WATER SOURCE POSSIBLE TO DIVERSIFY EL PASO'S WATER PORTFOLIO. IT WILL ENSURE A SUSTAINABLE, RESILIENT WATER SUPPLY FOR EL PASO. PURIFIED WATER IS A DROUGHTPROOF WATER SUPPLY THAT WILL BE AVAILABLE WHEN THE EL PASO COMMUNITY NEEDS IT MOST. PURIFIED WATER WILL ADD A COMPLETELY NEW WATER SOURCE TO FURTHER DIVERSITY THE EL PASO WATER PORTFOLIO, ONE THAT IS THE FIRST OF ITS KIND IN THE UNITED STATES.</P> | $0 |