R26AC00309↗

State Engineer, New Mexico Office of the received this grant or assistance award from Bureau of Reclamation: $1.50M obligated so far for colorado river system conservation pilot. Its latest action was on 2026-08-14.

Key facts · data as of Nov 14, 2026

Recipient
State Engineer, New Mexico Office of the
Awarding agency
Bureau of Reclamation (Department of the Interior)
Obligated to date
$1.50M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award R26AC00309, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_R26AC00309_014

THE STUDY TO LOWER THE ELEVATION OF THE NAVAJO INDIAN IRRIGATION PROJECT (NIIP) INTAKE OFFERS SUBSTANTIAL PUBLIC BENEFITS BY ENHANCING WATER SUPPLY RELIABILITY, SUPPORTING ECOLOGICAL HEALTH, AND IMPROVING REGIONAL DROUGHT RESILIENCE ACROSS THE COLORADO RIVER BASIN. THE CURRENT NIIP INTAKE ELEVATION LIMITS OPERATIONAL FLEXIBILITY AT NAVAJO RESERVOIR, A KEY UPPER BASIN FACILITY. LOWERING THE INTAKE HAS THE POTENTIAL TO UNLOCK OPERATING EFFICIENCIES BY ALLOWING DIVERSIONS AT LOWER RESERVOIR LEVELS.THIS PROJECT CONDUCTS AN APPRAISAL-LEVEL ANALYSIS TO ASSESS THE FEASIBILITY AND BENEFITS OF LOWERING THE NAVAJO INDIAN IRRIGATION PROJECT (NIIP) DIVERSION INTAKE AT NAVAJO RESERVOIR IN SAN JUAN COUNTY, NEW MEXICO. LOWERING THE INTAKE ELEVATION WOULD ALLOW DIVERSIONS AT LOWER RESERVOIR LEVELS, PROVIDING ACCESS TO STORAGE CURRENTLY HELD IN THE INACTIVE POOL. THIS INCREASED OPERATIONAL FLEXIBILITY WOULD STRENGTHEN RECLAMATIONS ABILITY TO MANAGE RESERVOIR OPERATIONS FOR AUTHORIZED PURPOSES, SUPPORT ENVIRONMENTAL OBJECTIVES, AND MEET TRIBAL WATER SETTLEMENT COMMITMENTS DURING PROLONGED DROUGHT CONDITIONS.THE STUDY WILL EXAMINE THE TECHNICAL, OPERATIONAL, ENVIRONMENTAL, RECREATIONAL, HYDROLOGIC, AND SYSTEM WATER IMPLICATIONS OF MODIFYING THE INTAKE ELEVATION. BY EVALUATING THESE FACTORS, THE PROJECT WILL PROVIDE RECLAMATION AND THE STATE OF NEW MEXICO WITH THE INFORMATION NEEDED TO MAKE WELL SUPPORTED DECISIONS REGARDING FUTURE INFRASTRUCTURE IMPROVEMENTS AND LONG-TERM RESERVOIR MANAGEMENT STRATEGIES.

Cooperative Agreement · Bureau of Reclamation · to State Engineer, New Mexico Office of the (UEI DVYNKUUNX2K4) · data as of 2026-11-14

Obligated to date$1.50M1 action
Period2026-08-14 → 2026-08-14first to last action

What it is

Program
Colorado River System Conservation Pilot (Assistance Listing 15.567)
Where the work is
NM

Obligations by fiscal year

FY2026$1.50M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-08-14. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-08-14ORIGNew award$1.50MTHE STUDY TO LOWER THE ELEVATION OF THE NAVAJO INDIAN IRRIGATION PROJECT (NIIP) INTAKE OFFERS SUBSTANTIAL PUBLIC BENEFITS BY ENHANCING WATER SUPPLY RELIABILITY, SUPPORTING ECOLOGICAL HEALTH, AND IMPROVING REGIONAL DROUGHT RESILIENCE ACROSS THE COLORADO RIVER…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗