| R25AC00209↗ | Department of the Interior | STATE ENGINEER, NEW MEXICO OFFICE OF THE | COOPERATIVE AGREEMENT (B) | 2026-01-26 | 2026-09-10 | 2 | THIS AWARD WILL INVESTIGATE, DEVELOP, PROTECT, AND CONSERVE THE WATERS IN NEW MEXICO. THIS SUPPORT AND ASSISTANCE SERVES THE PUBLIC S INTEREST BY ENHANCING THE RIO GRANDE PROJECT (RGP) TO ENSURE CONTINUED ACCESS TO WATER FOR MUNICIPAL, AGRICULTURAL, AND ENVIRONMENTAL USES, ENHANCE RIPARIAN WILDLIFE HABITAT, DECREASE FLOODING OF ADJACENT LANDS AND CHANNEL SEDIMENTATION, AND IMPLEMENT VOLUNTARY CONSUMPTIVE USE REDUCTIONS TO BUILD RESILIENCE IN THE RGP AREA UNDER PROLONGED DROUGHT. THIS SUPPORT AND ASSISTANCE ALSO SERVES THE PUBLICS INTEREST BY IMPLEMENTING CONSERVATION MEASURES IN THE MIDDLE RIO GRANDE PROJECT (MRG) TO SUPPORT ENDANGERED SPECIES. | $13.27M |
| R26AP00190↗ | Department of the Interior | STATE ENGINEER, NEW MEXICO OFFICE OF THE | GRANT | 2026-08-31 | 2026-08-31 | 1 | UPPER COLORADO BASIN REGION BUCKET 2 ECOSYSTEM (B2E) FINANCIAL ASSISTANCE PROGRAM PROVIDES FUNDING FOR PROJECTS THAT PROVIDE ENVIRONMENTAL BENEFITS AND RESTORATION OF ECOSYSTEMS AND HABITATS IMPACTED BY DROUGHT.THIS PROJECT INVOLVES LEASING UP TO 20,000 ACRE-FEET OF WATER ANNUALLY (2027-2031) FROM THE JICARILLA APACHE NATION FOR RELEASE FROM NAVAJO RESERVOIR, AIMED AT ENHANCING NATIVE FISH HABITATS AND IMPROVING WATER FLOW IN THE SAN JUAN RIVER. CONTRIBUTES WATER TO LAKE POWELL TO HELP MITIGATE DROUGHT AND THEREBY PROTECTS INFRASTRUCTURE AT GLEN CANYON DAM. KEY COMPONENTS INCLUDE THE ESTABLISHMENT OF AN ADAPTIVE MANAGEMENT AND MONITORING PLAN, WHICH INCORPORATES SEDIMENT MOVEMENT ANALYSIS AND DISSOLVED OXYGEN MONITORING TO INFORM ECOLOGICAL STRATEGIES IN THE TIMING OF STREAM FLOW RELEASES. COLLABORATION AMONG THE NEW MEXICO INTERSTATE STREAM COMMISSION, THE NATURE CONSERVANCY, AND VARIOUS TRIBAL NATIONS ENSURES COMPREHENSIVE WATER MANAGEMENT AND CONSERVATION EFFORTS. | $6.10M |
| R26AC00309↗ | Department of the Interior | STATE ENGINEER, NEW MEXICO OFFICE OF THE | COOPERATIVE AGREEMENT | 2026-08-14 | 2026-08-14 | 1 | THE STUDY TO LOWER THE ELEVATION OF THE NAVAJO INDIAN IRRIGATION PROJECT (NIIP) INTAKE OFFERS SUBSTANTIAL PUBLIC BENEFITS BY ENHANCING WATER SUPPLY RELIABILITY, SUPPORTING ECOLOGICAL HEALTH, AND IMPROVING REGIONAL DROUGHT RESILIENCE ACROSS THE COLORADO RIVER BASIN. THE CURRENT NIIP INTAKE ELEVATION LIMITS OPERATIONAL FLEXIBILITY AT NAVAJO RESERVOIR, A KEY UPPER BASIN FACILITY. LOWERING THE INTAKE HAS THE POTENTIAL TO UNLOCK OPERATING EFFICIENCIES BY ALLOWING DIVERSIONS AT LOWER RESERVOIR LEVELS.THIS PROJECT CONDUCTS AN APPRAISAL-LEVEL ANALYSIS TO ASSESS THE FEASIBILITY AND BENEFITS OF LOWERING THE NAVAJO INDIAN IRRIGATION PROJECT (NIIP) DIVERSION INTAKE AT NAVAJO RESERVOIR IN SAN JUAN COUNTY, NEW MEXICO. LOWERING THE INTAKE ELEVATION WOULD ALLOW DIVERSIONS AT LOWER RESERVOIR LEVELS, PROVIDING ACCESS TO STORAGE CURRENTLY HELD IN THE INACTIVE POOL. THIS INCREASED OPERATIONAL FLEXIBILITY WOULD STRENGTHEN RECLAMATIONS ABILITY TO MANAGE RESERVOIR OPERATIONS FOR AUTHORIZED PURPOSES, SUPPORT ENVIRONMENTAL OBJECTIVES, AND MEET TRIBAL WATER SETTLEMENT COMMITMENTS DURING PROLONGED DROUGHT CONDITIONS.THE STUDY WILL EXAMINE THE TECHNICAL, OPERATIONAL, ENVIRONMENTAL, RECREATIONAL, HYDROLOGIC, AND SYSTEM WATER IMPLICATIONS OF MODIFYING THE INTAKE ELEVATION. BY EVALUATING THESE FACTORS, THE PROJECT WILL PROVIDE RECLAMATION AND THE STATE OF NEW MEXICO WITH THE INFORMATION NEEDED TO MAKE WELL SUPPORTED DECISIONS REGARDING FUTURE INFRASTRUCTURE IMPROVEMENTS AND LONG-TERM RESERVOIR MANAGEMENT STRATEGIES. | $1.50M |
| R24AP00268↗ | Department of the Interior | STATE ENGINEER, NEW MEXICO OFFICE OF THE | GRANT | 2026-09-14 | 2026-09-14 | 1 | THIS PROJECT IS DESIGNED TO INCREASE THE CURRENT UNDERSTANDING OF BRACKISH GROUNDWATER AVAILABILITY IN SOUTHERN NEW MEXICO AND TO EVALUATE THE FEASIBILITY OF DESALINATING BRACKISH GROUNDWATER USING GREEN ENERGY FOR THE PURPOSE OF AUGMENTING WATER-SUPPLY AVAILABILITY IN THE LOWER RIO GRANDE VALLEY REGION IN NEW MEXICO.THIS WILL BE EXECUTED IN THREE MAIN PHASES: PHASE I - PERFORM A DESKTOP STUDY TO AUGMENT AND INCREASE UNDERSTANDING OF POTENTIAL SOURCE AQUIFERS FOR BRACKISH WATER ON THE EAST AND WEST SIDES OF THE RIO GRANDE IN SOUTHERN NEW MEXICO.PHASE I OUTCOMES. RANKING OF SOUTHERN NEW MEXICO S AVAILABLE BRACKISH GROUNDWATER AQUIFERS, WITH ESTIMATES OF ANNUAL PRODUCTION CAPACITIES AND VIABLE PUMPING TIMELINE HORIZONS. PHASE II - EVALUATE THE FEASIBILITY OF LOCATING, BUILDING, AND OPERATING A DESALINATION FACILITY.PHASE II OUTCOMES: A RANKED SET OF AT LEAST THREE POTENTIAL DESALINATION PLANT ALTERNATIVES, WITH CONCEPTUAL COSTS. PHASE ILL - EVALUATE THE FEASIBILITY OF OPERATING THE DESALINATION FACILITY WITH GREEN ENERGY SUCH AS SOLAR POWER.PHASE III OUTCOMES: FEASIBILITY ANALYSIS TO DETERMINE IF THERE IS A REASONABLE PROBABILITY TO POWER THE PROPOSED DESALINATION PLANT USING GREEN ENERGY SUCH AS SOLAR. | $0 |
| EMT-2023-GR-05014↗ | Department of Homeland Security | STATE ENGINEER, NEW MEXICO OFFICE OF THE | PROJECT GRANT (B) | 2026-01-30 | 2026-01-30 | 1 | NATIONAL DAM SAFETY PROGRAM | -$1 |