THIS WORK CONSISTS OF BUT IS NOT LIMITED TO SLIDE AND SLUMP REPAIR, REMOVAL OF OBSTRUCTIONS, BLADING, DRAINAGE FEATURE RECONDITIONING, CULVERT REMOVAL AND INSTALLATION, GATE REPLACEMENT, AND ROADWAY/ROADSIDE VEGETATION REMOVAL. THE FINAL ROADWAY SHA
Up for re-bid: ends 2027-11-15. Recompete brief → · USDA Forest Service, Bitterroot National Forest, Selway Wilderness Suspension Trail Bridge Reconstruction Project ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
2 actions since 2026-04-24. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-25 | P00001 | Change order | $50.0K | THIS WORK CONSISTS OF BUT IS NOT LIMITED TO SLIDE AND SLUMP REPAIR, REMOVAL OF OBSTRUCTIONS, BLADING, DRAINAGE FEATURE RECONDITIONING, CULVERT REMOVAL AND INSTALLATION, GATE REPLACEMENT, AND ROADWAY/ROADSIDE VEGETATION REMOVAL. THE FINAL ROADWAY SHA |
| 2026-04-24 | 0 | $911.4K | THIS WORK CONSISTS OF BUT IS NOT LIMITED TO SLIDE AND SLUMP REPAIR, REMOVAL OF OBSTRUCTIONS, BLADING, DRAINAGE FEATURE RECONDITIONING, CULVERT REMOVAL AND INSTALLATION, GATE REPLACEMENT, AND ROADWAY/ROADSIDE VEGETATION REMOVAL. THE FINAL ROADWAY SHA |