80GSFC18C0014↗

Southwest Research Institute received this contract from Nasa Goddard Space Flight Center, National Aeronautics and Space Administration: $22.08M obligated so far for flight instruments. It runs to 2027-12-02.

Key facts · data as of Oct 25, 2026

Recipient
Southwest Research Institute
Awarding agency
National Aeronautics and Space Administration
Contracting office
Nasa Goddard Space Flight Center (80GSFC)
Obligated to date
$22.08M
Potential value
$144.35M
Ends
2027-12-02

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.

Cite this page: SpendQuery, Award 80GSFC18C0014, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_80GSFC18C0014_8000_-NONE-_-NONE-

UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.

Definitive Contract · National Aeronautics and Space Administration · to Southwest Research Institute (UEI PB11V1KH3KV4) · data as of 2026-10-25

Obligated to date$22.08M14 actions
Current value$144.35Mwith options exercised
Period2017-11-22 → 2027-12-02current end date
Passed on$2.32Mto 16 subcontractors

Up for re-bid: ends 2027-12-02. Recompete brief → · Orbital Safety Analysis (OSA) Support - JOFOC ↗

What it is

Product or service
Flight Instruments (PSC 6610)
Industry
Engineering Services (NAICS 541330)
Contracting office
Nasa Goddard Space Flight Center (80GSFC)
Competition
Full and open competition · 5 offers received
Pricing
Cost plus fixed fee
How it was bought
Standalone contract
Solicitation
NNH16ZDA005O
Where the work is
Bexar, TX · district TX-20

Obligations by fiscal year

FY2023$0
FY2024$0
FY2025$17.68M
FY2026$4.40M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

16 subawards totaling $2.32M (10.5% of what was obligated), as Southwest Research Institute reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Big Head Endian LLC$606.3K1KS2022-11-212022-11-21
Svenska Rymd Ab$407.7K1PA2025-06-302025-06-30
Uk Research & Innovation$288.6K12024-05-252024-05-25
Vantage Systems, Inc.$179.7K1MD2023-01-122023-01-12
Salt Lake County$127.9K1UT2024-09-122024-09-12
Coastline Micro Inc$110.3K1CA2026-06-292026-06-29
Spacenav, LLC$91.0K1CO2026-02-042026-02-04
Blue Canyon Technologies LLC$81.9K1CO2025-02-132025-02-13
The Regents of the University of Colorado$66.6K1CO2024-07-122024-07-12
The Trustees of Princeton University$60.9K1NJ2022-10-262022-10-26
Northwest Research Associates, Inc.$60.0K1WA2026-05-072026-05-07
Planetary Science Institute$58.5K1AZ2025-10-312025-10-31
Parabilis Space Technologies, Inc.$48.0K1CA2024-02-012024-02-01
Presidio Components, Inc.$45.2K1CA2023-10-042023-10-04
Rockwell Collins Australia Pty Limited$45.0K1CO2024-07-092024-07-09
RTX Corp$42.0K1CO2023-10-162023-10-16
The largest single subawards
DateToAmountFor
2022-11-21Big Head Endian LLC$606.3KBHE WILL PROVIDE ONGOING ANALYSIS SUPPORT TO HELP IDENTIFY AND CLARIFY SYSTEM PERFORMANCE, OPERATIONAL PROCEDURES AND IMPACTS TO CHANGES IN THE SYSTEM AS THEY OCCUR.
2025-06-30SSC Space US Inc$407.7KNORMAL PRIORITY PASSES FOR PUNCH GROUND NETWORK STATION PHASE E.
2024-05-25Uk Research & Innovation$288.6KCONTINUE TO DEVELOP INSTRUMENTATION FOR THE PUNCH MISSION.
2023-01-12Vantage Systems, Inc.$179.7KVANTAGE SYSTEMS, INC CREATED 4 CUSTOM MLI BLANKETS WITH MULTI LATER INSULATION FOR THE PUNCH PROJECT.
2024-09-12Salt Lake County$127.9KPUNCH OUTREACH AUGMENTATION IN SUPPORT OF NASA PUNCH OUTREACH EFFORTS.
2026-06-29Coastline Micro Inc$110.3KASUS 2U SERVER
2026-02-04Spacenav, LLC$91.0KSUBCONTRACTOR WILL PROVIDE FLIGHT DYNAMICS SYSTEM ENGINEERING SUPPORT FOR THE PUNCH PROGRAM. ELEMENTS INCLUDE SUPPORTING ORBIT DETERMINATION AND ORBIT PRODUCT GENERATION, MANEUVER PLANNING, COMMUNICATIONS AND GROUND…
2025-02-13Blue Canyon Technologies LLC$81.9KBLUE CANYON IS PROVIDING PRE-FLIGHT AND ON-ORBIT SUPPORT FOR THE PUNCH PROGRAM.
2024-07-12The Regents of the University of Colorado$66.6KTHE SUBCONTRACTOR WILL PROVIDE WORKING GROUP LEAD SUPPORT TO THE POLARIMETER TO UNIFY THE CORONA AND HELIOSPHERE (PUNCH) PROGRAM. ELEMENTS INCLUDE PARTICIPATING IN PUNCH TEAM MEETINGS, COORDINATING AND CARRYING OUT…
2022-10-26The Trustees of Princeton University$60.9KSCIENCE TEAM SUPPORT SCIENCE CO-INVESTIGATOR PUNCH PHASE C/D
2026-05-07Northwest Research Associates, Inc.$60.0KDR. CHRIS “GILLY” GILBERT WILL PARTICIPATE IN TELECONFERENCES, PARTICIPATE IN PUNCH SCIENCE PLANNING, REPRESENT PUNCH AT SCIENTIFIC MEETINGS, CARRY OUT SCIENCE ACTIVITIES, AND ASSIST PI IN ADDITIONAL RELEVANT TASKS AS…
2025-10-31Planetary Science Institute$58.5KVENDOR STAFF WILL DEVELOP A COMPREHENSIVE EVALUATION PLAN FOR PUNCH OUTREACH AND PRESENT IT AT ANNUAL POCC MEETING IN 2026.
2024-02-01Parabilis Space Technologies, Inc.$48.0KTHE VENDOR WILL BE PERFORMING THE PHASE C/D POWER ANALYSES AND SUPPORT FOR PUNCH LAUNCH. THIS WORK INCLUDES AS-NEEDED SUPPORT AND ANY REQUIRED TRAVEL IN CONDUCTING ANALYSES IN SUPPORT OF PUNCH INTEGRATION AND TEST…
2023-10-04Presidio Components, Inc.$45.2KSEMI CUSTOM BUILT LOW PROFILE CERAMIC CAPACITORS
2024-07-09Blue Canyon Technologies LLC$45.0KSWRI STAFF DISCOVERED ISSUES WITH A BOARD IN THEIR AVIONICS BOX DURING TESTING. BCT, THE ORIGINAL CREATOR OF THIS BOARD, IDENTIFIED A SPARE FLIGHT BOARD THAT COULD BE USED AS A REPLACEMENT.BCT PROPOSED TO REMOVE AND…
2023-10-16Blue Canyon Technologies LLC$42.0KFIRM FIXED PRICE FOR UPGRADING THE SOFTWARE ON SWRI€„¢S 3ASM4250-02EDU UNIT TO MATCH THE 3ASM3100-108 FM CONFIGURATION

Every action

14 actions since 2023-04-17. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-06-30P00036Funding only$4.40MTHIS MOD ADDS FUNDING TO SUPPORT PERFORMANCE OF PHASE E/F WORK.
2026-06-17P00035Change order$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLAUSE 52.222-90. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A…
2025-09-17P00034Funding only$8.14MTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE UNPRICED CHANGE ORDER THAT WAS EXECUTED IN P00030 TO INCORPORATE PHASE E&F SCOPE INTO THE CONTRACT - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES…
2025-08-20P00033Change order definitized$2.40MTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE UNPRICED CHANGE ORDER THAT WAS EXECUTED IN P00030 TO INCORPORATE PHASE E&F SCOPE INTO THE CONTRACT - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES…
2025-07-29P00032Administrative change$0THE PURPOSE OF THIS MODIFICATION IS TO ANNOTATE THE REALLOCATION OF CONTRACT VALUE AND CANCEL RFP - INCORPORATION OF ATTACHMENT A-4 INTO SECTION J LIST OF ATTACHMENTS - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT,…
2025-06-09P00031Change order$2.40MINCORPORATION OF ATTACHMENT A-4 INTO SECTION J LIST OF ATTACHMENTS - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A…
2025-05-07P00030Change order$0INCORPORATION OF ATTACHMENT A-4 INTO SECTION J LIST OF ATTACHMENTS - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A…
2025-04-30P00029Administrative change$0REMOVAL OF CLAUSES IAW PCD 25-01 AND PCD 25-02 - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE…
2025-04-28P00028Change order$697.4KUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED…
2025-02-26P00027Funding only$2.00MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED…
2025-01-23P00026Funding only$2.04MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED…
2023-12-20P00025Supplemental agreement (work within scope)$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED…
2023-12-01P00024Supplemental agreement (work within scope)$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED…
2023-04-17P00023Supplemental agreement (work within scope)$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗