Contracting office · 80GSFC
NASA Goddard Space Flight Center
National Aeronautics and Space Administration
NASA Goddard Space Flight Center (contracting office 80GSFC, National Aeronautics and Space Administration) obligated $3.39B on contracts in FY2026 so far. It buys mostly guided missile and space vehicle manufacturing, most from Blue Origin, LLC. It has 250 active contracts worth $33.52B. Of its 455 competed contracts in the last three years, 19% drew a single offer.
Key facts · data as of Nov 14, 2026
- Obligations, FY2026 so far
- $3.39B
- Active contracts
- 250, $33.52B
- Buys most
- Guided Missile and Space Vehicle Manufacturing
- Largest vendor
- Blue Origin, LLC ($660.00M)
- Competed contracts with one offer
- 19%
- Open notices now
- 3
Source: USAspending.gov prime contract awards (obligations: money committed, net of de-obligations) and SAM.gov notices, data as of Nov 14, 2026.
Cite this page: SpendQuery, NASA Goddard Space Flight Center (80GSFC) federal contracts, data as of Nov 14, 2026, https://spendquery.com/office?code=80GSFC
NASA Goddard Space Flight Center mostly buys space vehicle manufacturing and physical, engineering, and life sciences research and development, with $1.01 billion and $972.83 million in FY2026 obligations respectively. Its largest suppliers include Blue Origin ($660.00 million) and Lockheed Martin ($284.90 million). It usually buys through standalone contracts, and 19% of its 455 competed contracts over the last three years drew only one offer. (AI summary of the numbers on this page, checked against them; how)
At a glance
- 250 active contracts, $33.52B
- 19% of its 455 competed contracts drew a single offer (last 3 years)
- Usually buys through: Standalone contract
- Gives a median 30 days to respond (36 solicitations, last 3 years)
- Amends 92% of its solicitations at least once
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
Who wins here
Mostly repeat winners 5% of its 58 contracts since FY2025 went to a company's first win since 2023; 22% to companies with 5 wins or fewer.
- First win since 2023: 3
- 2nd–5th win: 10
- 6th–10th win: 4
- More than 10 wins: 41
A win = a contract or order of $10,000 or more; a company counts with its subsidiaries. Our contract data starts with FY2023, so “first” means first since 2023. Orders under someone's IDIQ, GWAC or BPA count toward a company's wins but not in the shares.
What it buys, FY2026
- 336414 Guided Missile and Space Vehicle Manufacturing $1.01B
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (Except Nanotechnology and Biotechnology) $972.83M
- 541330 Engineering Services $593.87M
- 541710 Research and Development in the Physical, Engineering, and Life Sciences $176.23M
- 517919 All Other Telecommunications $167.88M
- 561210 Facilities Support Services $162.70M
- 333314 Optical Instrument and Lens Manufacturing $67.68M
- 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing $30.67M
Who it buys from, FY2026
- Blue Origin, LLC $660.00M
- Lockheed Martin Corp $284.90M
- Association of Universities for Research in Astronomy, Inc. $259.32M
- Veritas Capital Fund Management, L.L.C. $243.01M
- Bae Systems PLC $229.18M
- Arctic Slope Regional Corporation $208.84M
- KBR, Inc. $159.31M
- RTX Corp $134.46M
- Columbus Technologies and Services, Inc $94.96M
- California Institute of Technology $91.05M
Contracts ending in the next 12 months
109 contracts, $12.46B with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| 80GSFC25CA022 THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, AND FACILITIES NECESSARY TO OPERATE AND MAINTAIN THE TRANSPORTABLE LASER RANGING STATION (TLRS) AT CHARACATO OBSERVATORY IN AREQUIPA, PERU | Universidad Nacional De San Agustin | 2026-11-24 | $1.21M |
| 80GSFC21CA022 THIS PROCUREMENT FOR THE PROCUREMENT FOR THE AERONET PROJECT FOR SUPPLIES FOR THE SUN PHOTOMETERS, AND PARTS NECESSARY FOR THE REPAIR, UPKEEP, AND UPGRADE OF THE SUN PHOTOMETERS. | Cimel Electronique | 2026-11-27 | $9.90M |
| 80GSFC26F0008 THIS CONTRACT PROCURES ELECTRICITY (SUPPLY AND DELIVERY) FOR NASA'S GODDARD SPACE FLIGHT CENTER (GSFC) MAIN CAMPUS IN GREENBELT, MD AND RESPECTIVE AREAS 100, 200, 300, AND 400. | Potomac Electric Power Co | 2026-11-30 | $20.94M |
| NNG17FC93C IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | The Trustees of Princeton University | 2026-11-30 | $12.09M |
| NNG14FC03C TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. | Massachusetts Institute of Technology | 2026-12-01 | $110.13M |
| 80GSFC24CA045 STRATOSPHERE TROPOSPHERE RESPONSE USING INFRARED VERTICALLY-RESOLVED LIGHT EXPLORER (STRIVE) SPACECRAFT AND MISSION OPS PHASE A | Northrop Grumman Systems Corporation | 2026-12-21 | $3.99M |
| 80GSFC25C0006 PHASE E LROC CONTRACT AWARD | Intuitive Machines, LLC | 2026-12-22 | $15.54M |
| 80GSFC18C0083 THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE). | Bae Systems Space & Mission Systems Inc. | 2026-12-31 | $307.94M |
| 80GSFC20C0063 DEEP ATMOSPHERE VENUS INVESTIGATION OF NOBLE GASES, CHEMISTRY, AND IMAGING PLUS (DAVINCI+) MALIN SPACE SCIENCE SYSTEMS PHASE A | Malin Space Science Systems, Inc | 2026-12-31 | $8.48M |
| 80GSFC20C0111 DEVELOPMENT AND SUSTAINMENT OF THE NASA SEARCH AND RESCUE (SAR) LABORATORY (SARLAB), A SATELLITE TESTING GROUND STATION AND RESEARCH AND DEVELOPMENT ENVIRONMENT FOR EMERGING SAR TECHNOLOGIES | Techno-Sciences, LLC | 2026-12-31 | $7.00M |
Open notices
- Hubble Space Telescope (HST) Servicing · Sources Sought · due 2026-11-30
- Geostationary extReme UltraViolet Imager (GRUVI), Instrument Request for Information · Sources Sought · due 2026-12-03 · No Set aside used
- HYDROSPHERE, BIOSPHERE, & GEOPHYSICS (HBG) SUPPORT SERVICES II - FINAL REQUEST FOR PROPOSAL (FRFP) · Solicitation · due 2026-12-04
From USAspending.gov prime awards and SAM.gov notices. Sources and limits