80GSFC20C0059↗

Lockheed Martin Corp received this contract from Nasa Goddard Space Flight Center, National Aeronautics and Space Administration: $32.04M obligated so far for r&d- other research and development (basic research). It runs to 2026-10-31.

Key facts · data as of Oct 25, 2026

Recipient
Lockheed Martin Corp
Awarding agency
National Aeronautics and Space Administration
Contracting office
Nasa Goddard Space Flight Center (80GSFC)
Obligated to date
$32.04M
Potential value
$38.33M
Ends
2026-10-31

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.

Cite this page: SpendQuery, Award 80GSFC20C0059, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_80GSFC20C0059_8000_-NONE-_-NONE-

THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S COMPETITIVELY SELECTED DAVINCI+ MISSION.

Definitive Contract · National Aeronautics and Space Administration · to Lockheed Martin Corp (UEI FYHNA5WC8XD7) · data as of 2026-10-25

Obligated to date$32.04M28 actions
Current value$38.33Mwith options exercised
Period2020-05-29 → 2026-10-31current end date
Passed on$1.61Mto 7 subcontractors

Up for re-bid: ends 2026-10-31. Recompete brief → · LISA Engineering Test Unit (ETU) Telescope ↗

What it is

Product or service
R&D- Other Research and Development (Basic Research) (PSC AZ11)
Industry
Guided Missile and Space Vehicle Manufacturing (NAICS 336414)
Contracting office
Nasa Goddard Space Flight Center (80GSFC)
Competition
Full and open competition · 5 offers received
Pricing
Firm fixed price
How it was bought
Standalone contract
Solicitation
NNH19ZDA010O
Where the work is
Douglas, CO · district CO-07

Obligations by fiscal year

FY2023$4.95M
FY2024$4.34M
FY2025$9.96M
FY2026$12.79M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

22 subawards totaling $1.61M (5.0% of what was obligated), as Lockheed Martin Corp reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Bae Systems PLC$691.5K5VA2023-05-102023-11-30
Carbon Carbon Advanced Technologies, Inc.$329.9K4TX2023-01-172025-02-12
Safran Sa$242.7K3CT2023-01-182024-05-06
Bae Systems Information & Electronic Systems Integration Inc.$181.5K1VA2025-05-222025-05-22
Red Canyon Software, Inc.$77.6K7CO2022-11-162025-01-13
Linear Labs LLC$56.6K1DC2025-04-212025-04-21
Four LLC$35.0K1VA2022-12-152022-12-15
The largest single subawards
DateToAmountFor
2023-01-18Pioneer Aerospace Corp$352.4KPARACHUTE MATERIAL PARACHUTE MATERIAL
2023-01-17Carbon Carbon Advanced Technologies, Inc.$325.1KCARBON CARBON HEAT SHIELD CARBON CARBON
2023-11-30Bae Systems Information & Electronic Systems Integration Inc.$307.8KCLIN 003- SBC FLIGHT DELIVERY
2023-06-29Bae Systems Information & Electronic Systems Integration Inc.$220.8K3U RAD750 V3 198MHZ FLIGHT SBC W/O POR. CLIN 003- SBC FLIGHT DELIVERY
2025-05-22Bae Systems Information & Electronic Systems Integration Inc.$181.5K3U RAD750 V2/V3 BLACK BOX AMBIENT ENGINEERING UNIT (EU) 3U RAD750
2023-08-31Bae Systems Information & Electronic Systems Integration Inc.$88.9K3U RAD750 V3 198MHZ EDU 8516779-1_RAD750 V2/3 BLKBOX_DAVINCI AMBIENT ENGINEERING UNIT (EU) 3U RAD750
2023-05-10Bae Systems Information & Electronic Systems Integration Inc.$59.3K3U RAD750 V3 198MHZ EDU 8516779-1_RAD750 V2/3 BLKBOX_DAVINCI
2025-04-21Linear Labs LLC$56.6KDESIGNER LINEAR LABS - DAVINCI
2022-12-15Four LLC$35.0K##D09LELL## DOORS FLOATING QTY 3
2023-02-10Red Canyon Software, Inc.$34.4K##224065044400##MECHANICAL SUPPORT
2023-10-16Red Canyon Software, Inc.$32.8K224065050500 PARACHUTE ENGINEERING SUPPO
2022-11-16Red Canyon Software, Inc.$32.7K224065050500 PARACHUTE ENGINEERING SUPPO
2023-06-20Carbon Carbon Advanced Technologies, Inc.$18.8KCARBON CARBON HEAT SHIELD CARBON CARBON
2023-08-10Red Canyon Software, Inc.$14.8K224065050500 PARACHUTE ENGINEERING SUPPO
2023-10-04Bae Systems Information & Electronic Systems Integration Inc.$14.7KCLIN 003- SBC FLIGHT DELIVERY
2024-01-04Pioneer Aerospace Corp$12.7KPARACHUTE MATERIAL PARACHUTE MATERIAL
2023-10-31Red Canyon Software, Inc.$8.6K##224065044400##MECHANICAL SUPPORT
2025-02-12Carbon Carbon Advanced Technologies, Inc.$7.5KHEAT TREATMENT HEAT TREAT 4 ACC4 DOUBLE-
2025-01-13Red Canyon Software, Inc.-$2.6K224065050500 PARACHUTE ENGINEERING SUPPO
2023-04-03Carbon Carbon Advanced Technologies, Inc.-$21.5KCARBON CARBON HEAT SHIELD CARBON CARBON
2024-11-19Red Canyon Software, Inc.-$43.0K##224065044400##MECHANICAL SUPPORT
2024-05-06Pioneer Aerospace Corp-$122.5KPARACHUTE MATERIAL PARACHUTE MATERIAL

Every action

28 actions since 2022-10-04. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-07-13P00040Change order$910.2KDAVINCI SPACECRAFT PRE-PHASE B FFP EFFORT.
2026-06-17P00039Administrative change$0EOS 14275 & 14398
2026-06-12P00038Change order$846.3KTHIS PROCUREMENT PROVIDES FOR THE RESOURCES NECESSARY TO SATISFY THE DAVINCI SPACECRAFT EARLY PHASE B REQUIREMENT.
2026-03-16P00037Funding only$2.20MDAVINCI SPACECRAFT PRE-PHASE B FORMULATION.
2026-02-13P00036Funding only$2.19MDAVINCI SPACECRAFT PRE-PHASE B
2026-01-15P00035Change order$6.65MPHASE A/B-SORR/PRE-PHASE B OF NASA'S COMPETITIVELY SELECTED DAVINCI MISSION.
2025-09-29P00034Change order$3.00MDAVINCI FY26 SPACECRAFT PRE-PHASE B EFFORT.
2025-03-28P00033Administrative change$0REMOVAL OF CLAUSES IAW PCD 25-01
2025-03-14P00032Administrative change$0DAVINCI PRE-PHASE B
2025-03-04P00031Administrative change$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S COMPETITIVELY SELECTED DAVINCI+ MISSION.
2025-01-02P00030Funding only$3.46MDAVINCI PRE-PHASE B
2024-11-07P00029Change order$3.50MDAVINCI FY25 SPACECRAFT
2024-10-31P00028Administrative change$0DAVINCI SC
2024-09-25P00027Change order$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2024-09-23P00026Change order$197.9KTHIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2024-02-14P00025Change order$1.41MTHIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2024-01-30P00024Administrative change$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2024-01-22P00023Subcontracting plan added$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2023-10-06P00022Funding only$2.73MTHIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2023-09-27P00021Change order$200.0KTHIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2023-09-08P00020Change order$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2023-07-27P00019Administrative change$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2023-05-24P00018Administrative change$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2023-03-30P00017Change order$153.3KTHIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2022-11-08P00016Administrative change$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2022-11-01P00015Administrative change$0THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2022-10-20P00014Funding only$4.05MTHIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.
2022-10-04P00013Change order$550.0KTHIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND PHASE B SCIENCE OPTIMIZATION AND RISK REDUCTION (B-SORR) DAVINCI REQUIREMENT.

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗