80GSFC23CA072↗

Bae Systems Space & Mission Systems Inc. received this contract from Nasa Goddard Space Flight Center, National Aeronautics and Space Administration: $236.00M obligated so far for space r&d svcs space flight, research & supporting activities; r&d facilities & maj equip. It runs to 2050-10-31.

Key facts · data as of Oct 25, 2026

Recipient
Bae Systems Space & Mission Systems Inc.
Awarding agency
National Aeronautics and Space Administration
Contracting office
Nasa Goddard Space Flight Center (80GSFC)
Obligated to date
$236.00M
Potential value
$549.86M
Ends
2050-10-31

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.

Cite this page: SpendQuery, Award 80GSFC23CA072, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_80GSFC23CA072_8000_-NONE-_-NONE-

GEOXO SOUNDER INSTRUMENT

Definitive Contract · National Aeronautics and Space Administration · to Bae Systems Space & Mission Systems Inc. (UEI C8ZLJ61YJ528) · data as of 2026-10-25

Obligated to date$236.00M39 actions
Current value$386.84Mwith options exercised
Potential value$549.86Mif every option is used
Period2023-09-12 → 2050-10-31current end date
Passed on$26.56Mto 19 subcontractors

What it is

Product or service
Space R&D Svcs Space Flight, Research & Supporting Activities; R&D Facilities & Maj Equip (PSC AR15)
Industry
Engineering Services (NAICS 541330)
Funded by
Department of Commerce
Contracting office
Nasa Goddard Space Flight Center (80GSFC)
Competition
Full and open competition · 2 offers received
Pricing
Cost plus award fee
How it was bought
Standalone contract
Solicitation
80GSFC22R0055
Where the work is
Boulder, CO · district CO-02

Obligations by fiscal year

FY2023$50.00M
FY2024$10.00M
FY2025$39.20M
FY2026$136.80M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

22 subawards totaling $26.56M (11.3% of what was obligated), as Bae Systems Space & Mission Systems Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Teledyne Scientific & Imaging, LLC$21.65M1CA2024-04-102024-04-10
Lattice Materials LLC$1.66M1MT2026-04-102026-04-10
Northrop Grumman Corporation$1.13M1CA2026-01-222026-01-22
Crescent City Insights, LLC$425.0K1LA2026-03-262026-03-26
Airborn Interconnect, LLC$268.1K2TX2026-05-052026-05-21
Tevet, LLC$253.0K3TN2026-05-182026-08-26
Frontgrade Colorado Springs LLC$194.5K1CO2026-09-032026-09-03
Oncore Manufacturing LLC$192.0K1CO2025-12-092025-12-09
International Rectifier Hirel Products, Inc.$118.5K1MA2026-09-162026-09-16
Yokogawa Electric Corporation$89.5K1GA2026-04-072026-04-07
Q-Tech Corp$83.5K1CA2026-08-022026-08-02
Spirit America Labs Corp$83.2K1AZ2026-08-232026-08-23
G. C. Micro Corporation$76.4K1CA2026-09-182026-09-18
Meinberg USA Inc$73.2K1CA2026-07-302026-07-30
Emcor Enclosures LLC$64.7K1MN2026-07-242026-07-24
Electro Plate Circuitry, Inc.$53.6K1TX2026-02-182026-02-18
Fabricated Components Corporation$50.4K1CA2026-02-192026-02-19
Analog Devices, Inc.$47.1K1MA2026-09-042026-09-04
Equipto Electronics Corp$44.6K1IL2026-04-012026-04-01
The largest single subawards
DateToAmountFor
2024-04-10Teledyne Scientific & Imaging, LLC$21.65MMACHINED MATERIALS
2026-04-10Lattice Materials LLC$1.66MOPTICAL EQUIPMENT
2026-01-22Northrop Grumman Systems Corporation$1.13MOPTICAL PARTS
2026-03-26Crescent City Insights, LLC$425.0KENGINEERING SERVICES
2026-09-03Frontgrade Colorado Springs LLC$194.5KEEE PARTS
2025-12-09Oncore Manufacturing LLC$192.0KPCA
2026-05-21Airborn Interconnect, LLC$182.1KEEE PARTS
2026-09-16International Rectifier Hirel Products, Inc.$118.5KEEE PARTS
2026-05-28Tevet LLC$94.6KMODULE,PXI,NI FLEXRIO FPGA,KINTEX-7 325T,NI PXIE-7971R
2026-04-07Yokogawa Corporation of America$89.5KPOWER ANALYZER,MAINFRAME 7-SLOT,HIGHEST PRECISION,WT5000;POWER ANALYZER,MODULE,HIGH ACCURACY,30A,WT5000;POWER ANALYZER,ADAPTER,HIGH CURRENT,SAFETY TERMINAL,WT5000;ENCLOSURE,RACK MOUNTING KIT,FOR EIA SINGLE HOUSING…
2026-05-05Airborn Interconnect, LLC$86.1KEEE PARTS
2026-05-18Tevet LLC$84.6KMODULE,I/O,RECONFIGURABLE,PXI EXPRESS,KINTEX ULTRASCALE K...
2026-08-02Q-Tech Corp$83.5KEEE PARTS
2026-08-23Spirit America Corp$83.2KMATERIAL
2026-09-18G. C. Micro Corporation$76.4KCPU PARTS
2026-08-26Tevet LLC$73.8KMATERIAL
2026-07-30Meinberg USA Inc$73.2K/MATERIAL
2026-07-24Emcor Enclosures LLC$64.7KSHEET METAL MATERIAL
2026-02-18Electro Plate Circuitry, Inc.$53.6KPRINTED WIRING BOARD, INTERFACE, STANDARD PRODUCT;PRINTED WIRING BOARD, DIGITAL, FPE, EDU;PRINTED WIRING BOARD, BIAS, FPE, EDU;PRINTED WIRING BOARD, BACKPLANE, FPE, EDU
2026-02-19Fabricated Components Corporation$50.4KPRINTED WIRING BOARD, INTERFACE, STANDARD PRODUCT;PRINTED WIRING BOARD, DIGITAL, FPE, EDU;PRINTED WIRING BOARD, BIAS, FPE, EDU;PRINTED WIRING BOARD, BACKPLANE, FPE, EDU
2026-09-04Analog Devices, Inc.$47.1KEEE PARTS
2026-04-01Equipto Electronics Corp$44.6KASSEMBLY RACK

Every action

39 actions since 2023-09-12. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-07-17P00038Funding only$46.88MGEOXO SOUNDER INSTRUMENT
2026-06-22P00037Change order$0GEOXO SOUNDER INSTRUMENT
2026-05-20P00036Funding only$52.00MGEOXO SOUNDER INSTRUMENT
2026-04-20P00035Administrative change$3.50MGEOXO SOUNDER INSTRUMENT: MOD P00034 TYPOGRAPHICAL CORRECTION AND OBLIGATING ADDITIONAL FUNDING.
2026-03-25P00034Administrative change$0GEOXO SOUNDER INSTRUMENT: AWARD FEE PERIOD 4.
2026-01-28P00033Funding only$30.00MGEOXO SOUNDER INSTRUMENT: FUNDING ONLY ACTION.
2025-12-23P00032Funding only$4.42MGEOXO SOUNDER INSTRUMENT: FUNDING ONLY ACTION.
2025-09-22P00031Funding only$4.20MGEOXO SOUNDER INSTRUMENT: FUNDING ONLY ACTION.
2025-08-21P00030Administrative change$0GEOXO SOUNDER INSTRUMENT: INCORPORATE CCR X00370 AND X00373 AT NO COST.
2025-08-19P00029Administrative change$0GEOXO SOUNDER INSTRUMENT: INCORPORATE CCR X00370 AND X00373 AT NO COST.
2025-06-23P00028Change order$0GEOXO SOUNDER INSTRUMENT
2025-06-05P00027Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2025-06-04P00026Funding only$25.00MGEOXO SOUNDER INSTRUMENT
2025-05-21P00025Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT.
2025-05-20P00024Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2025-05-06P00023Supplemental agreement (work within scope)$0REMOVAL OF CLAUSES IAW EO 14173 AND 14168
2025-04-10P00022Administrative change$0REMOVAL OF CLAUSES IAW EO 14173 AND 14168
2025-04-03P00021Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2025-03-18P00020Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2025-02-26P00019Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2025-02-18P00018Administrative change$0GEOXO SOUNDER INSTRUMENT
2025-02-12P00017Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2025-01-23P00016Administrative change$0REMOVAL OF CLAUSES/DRDS IAW EO 14035--GEOXO SOUNDER INSTRUMENT
2025-01-14P00015Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2024-12-17P00014Funding only$10.00MGEOXO SOUNDER INSTRUMENT
2024-12-16P00013Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2024-09-13P00012Vendor ID or name changed$0GEOXO SOUNDER INSTRUMENT
2024-08-16P00011Administrative change$0GEOXO SOUNDER INSTRUMENT
2024-08-08P00010Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2024-07-19P00009Supplemental agreement (work within scope)$10.00MGEOXO SOUNDER INSTRUMENT
2024-06-28P00008Administrative change$0GEOXO SOUNDER INSTRUMENT
2024-05-09P00007Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2024-04-01P00006Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2024-03-26P00005Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2024-02-23P00004Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2023-12-22P00003Administrative change$0GEOXO SOUNDER INSTRUMENT
2023-09-25P00002Administrative change$0GEOXO SOUNDER INSTRUMENT
2023-09-21P00001Supplemental agreement (work within scope)$0GEOXO SOUNDER INSTRUMENT
2023-09-120$50.00MGEOXO SOUNDER INSTRUMENT

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗