Southwest Research Institute received this contract from Nasa Goddard Space Flight Center, National Aeronautics and Space Administration: $10.56M obligated so far for flight instruments. It runs to 2034-01-31.
Key facts · data as of Oct 23, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 23, 2026.
Cite this page: SpendQuery, Award 80GSFC25CA025, data as of Oct 23, 2026, https://spendquery.com/award?id=CONT_AWD_80GSFC25CA025_8000_-NONE-_-NONE-
Southwest Research Institute: all federal awards · National Aeronautics and Space Administration: spending · Nasa Goddard Space Flight Center: what it buys
DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
6 subawards totaling $720.6K (6.8% of what was obligated), as Southwest Research Institute reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| University System of New Hampshire | $270.5K | 1 | NH | 2025-02-13 | 2025-02-13 |
| Microchip Technology Inc | $171.0K | 1 | AZ | 2025-04-30 | 2025-04-30 |
| Osterreichische Akademie Der Wissenschaften | $124.2K | 1 | 2025-09-15 | 2025-09-15 | |
| Avnet, Inc. | $83.7K | 2 | FL | 2025-05-29 | 2025-07-15 |
| Presidio Components, Inc. | $71.2K | 1 | CA | 2025-07-08 | 2025-07-08 |
| Date | To | Amount | For |
|---|---|---|---|
| 2025-02-13 | University System of New Hampshire | $270.5K | SUBCONTRACTOR WILL PROVIDE SUPPORT TO SOL PROGRAM BY ASSISTING WITH BUILDING AND TESTING MAGNETOMETER INSTRUMENTS. |
| 2025-04-30 | Microchip Technology Inc | $171.0K | MICROCIRCUIT FIELD PROGRAMMABLE GATE ARRAY LOW POWER |
| 2025-09-15 | Osterreichische Akademie Der Wissenschaften | $124.2K | SUBCONTRACTOR WILL CONTRIBUTE TO THE SOL PROGRAM BY SUPPORTING THE DEVELOPMENT, CALIBRATION, AND TESTING OF THE FLUXGATE MAGNETOMETERS. |
| 2025-07-08 | Presidio Components, Inc. | $71.2K | CAPACITORS, CERAMIC CHIPS IN DIFFERENT VOLTS. |
| 2025-07-15 | Avnet, Inc. | $51.9K | MICROPAC INDUSTRIES MICROCIRCUITS TO INCLUDE PRECAP SOURCE IN SPECTION, 51, |
| 2025-05-29 | Avnet, Inc. | $31.8K | TRANSISTORS, RADIATION: HARDENED POWER MOSFET P CHANNEL AND MOSFET N CHANNEL |
12 actions since 2025-01-22. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-22 | P00011 | Change order | $0 | DESIGN, ANALYZE, DEVELOP, AND FABRICATE TWO FLIGHT MAGNETOMETER INSTRUMENTS FOR THE LAGRANGE 1 (L1) SERIES MISSION. |
| 2026-07-14 | P00010 | Funding only | $2.82M | DESIGN, ANALYZE, DEVELOP, AND FABRICATE TWO FLIGHT MAGNETOMETER INSTRUMENTS FOR THE LAGRANGE 1 (L1) SERIES MISSION. |
| 2026-06-22 | P00009 | Change order | $0 | DESIGN, ANALYZE, DEVELOP, AND FABRICATE TWO FLIGHT MAGNETOMETER INSTRUMENTS FOR THE LAGRANGE 1 (L1) SERIES MISSION. |
| 2026-04-02 | P00008 | Funding only | $1.25M | MODIFICATION 8: FUNDING ONLY ACTION. |
| 2026-03-06 | P00007 | Administrative change | $0 | MODIFICATION 7: INCORPORATE THE REVISED SPEC DOCUMENT AT NO ADDITIONAL COST. |
| 2025-09-22 | P00006 | Funding only | $2.00M | DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. |
| 2025-06-24 | P00005 | Funding only | $500.0K | DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. |
| 2025-04-11 | P00004 | Administrative change | $0 | DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. |
| 2025-03-03 | P00003 | Funding only | $2.00M | DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. |
| 2025-02-25 | P00002 | Administrative change | $0 | DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. |
| 2025-01-29 | P00001 | Administrative change | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14035--DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. |
| 2025-01-22 | 0 | $2.00M | DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-23). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗