ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
Up for re-bid: ends 2027-03-31. Recompete brief → · LISA Engineering Test Unit (ETU) Telescope ↗
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
14 subawards totaling $475.8K (1.4% of what was obligated), as Lockheed Martin Corp reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Designamerica Inc | $430.4K | 3 | MD | 2024-04-16 | 2025-07-17 |
| Red Canyon Software, Inc. | $207.6K | 4 | CO | 2023-02-09 | 2024-01-16 |
| All Points Logistics, LLC | $150.6K | 1 | FL | 2023-01-09 | 2023-01-09 |
| Hewlett Packard Enterprise Company | $35.5K | 1 | VA | 2024-05-20 | 2024-05-20 |
| Moog Inc | -$10.6K | 1 | CA | 2022-11-07 | 2022-11-07 |
| Isys, Incorporated | -$32.4K | 2 | CO | 2022-12-21 | 2024-10-16 |
| Ulterliner, Inc. | -$119.9K | 1 | FL | 2024-06-26 | 2024-06-26 |
| Advanced Scientific Concepts, LLC | -$185.6K | 1 | CA | 2022-12-12 | 2022-12-12 |
| Date | To | Amount | For |
|---|---|---|---|
| 2024-01-16 | Red Canyon Software, Inc. | $486.6K | MISSION OPS SUPPORT OSIRIS-APEX MISSION |
| 2024-04-16 | Designamerica Inc | $246.9K | FEDS/ASIST SW MAINTENANCE |
| 2025-07-17 | Designamerica Inc | $191.4K | ##8 DELL ASIST WS'S##8 WS'S WITH 2-22" M ##DELL SERVER##1 DELL SERVER W/ 2TB DISK ##DISPLAY SUBSYSTEMS##8 DISPLAY SUBSYSTE ##FEDS RACKMOUNT PC##FEDS RACKMOUNT PC W ##FEDS SOFTWARE LICENSE##1 FEDS SOFTWARE ##FEDS… |
| 2023-01-09 | All Points Logistics, LLC | $150.6K | 81000000 SUBCONTRACT FOR O-REX GDS |
| 2022-12-21 | Isys, Incorporated | $43.7K | N/A OSIRIS-REX TELECOM SUPPORT |
| 2023-08-15 | Red Canyon Software, Inc. | $41.0K | OSIRIS-REX SYSTEMS SUPPORT |
| 2024-05-20 | Hewlett Packard Enterprise Company | $35.5K | ##5136893802-01##NFS SERVER FOR APEX STL |
| 2023-11-21 | Red Canyon Software, Inc. | $9.6K | OSIRIS-REX SYSTEMS SUPPORT |
| 2025-04-29 | Designamerica Inc | -$7.9K | DA SOFTWARE MAINTENANCE FOR O-REX DA SOF |
| 2022-11-07 | Moog Inc | -$10.6K | ENGINEERING LABOR SUPPORT |
| 2024-10-16 | Isys, Incorporated | -$76.1K | N/A OSIRIS-REX TELECOM SUPPORT |
| 2024-06-26 | All Points Logistics, LLC | -$119.9K | 81000000 SUBCONTRACT FOR O-REX GDS |
| 2022-12-12 | Advanced Scientific Concepts, LLC | -$185.6K | ALTERNATE LASER ENCLOSURE DESIGN NRE INCORPORATE REV E NFP3-SOW-11-0001 PER SOW NFP3-SOW-11-001 |
| 2023-02-09 | Red Canyon Software, Inc. | -$329.5K | OSIRIS-REX SYSTEMS SUPPORT |
44 actions since 2022-11-19. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-30 | 149 | Supplemental agreement (work within scope) | $0 | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2026-09-29 | 150 | Funding only | $222.0K | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2026-06-25 | 148 | Funding only | $2.00M | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2026-06-16 | 147 | Administrative change | $0 | ADD 52.222-90 IAW EO 14398. THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2026-05-18 | 146 | Administrative change | $0 | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2026-04-29 | 145 | Administrative change | $4.00M | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2026-04-22 | 144 | Change order definitized | $0 | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2026-02-12 | 143 | Funding only | $1.50M | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-09-30 | 142 | Funding only | $500.0K | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-09-25 | 141 | Funding only | $579.0K | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-08-07 | 140 | Funding only | $2.00M | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-07-14 | 139 | Funding only | $1.00M | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-07-03 | 138 | Supplemental agreement (work within scope) | $0 | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-05-14 | 137 | Administrative change | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14148. THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS |
| 2025-03-19 | 136 | Administrative change | $300.0K | REMOVAL OF CLAUSES/DRDS IAW PCD 25-01, -02, EO 14148. CONTRACTOR SHALL PROVIDE RESOURCES TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY REGOLITH & APOPHIS EXPLORER (OSIRIS-REX,-APEX) MISSION FOR THE SAMPLE RETURN OF ASTEROIDS |
| 2025-03-19 | 135 | Administrative change | $0 | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY REGOLITH AND APOPHIS EXPLORER (OSIRIS-REX,-APEX) MISSION FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-03-05 | 134 | Funding only | $1.50M | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY REGOLITH AND APOPHIS EXPLORER (OSIRIS-REX,-APEX) MISSION FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-01-27 | 133 | Administrative change | $0 | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY REGOLITH AND APOPHIS EXPLORER (OSIRIS-REX,-APEX) MISSION FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-01-24 | 132 | Administrative change | $0 | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY REGOLITH AND APOPHIS EXPLORER (OSIRIS-REX,-APEX) MISSION FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-01-23 | 131 | Administrative change | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14148. THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY REGOLITH AND APOPHIS EXPLORER (OSIRIS-REX,-APEX) MISSION FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2025-01-02 | 130 | Funding only | $480.3K | THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY REGOLITH AND APOPHIS EXPLORER (OSIRIS-REX,-APEX) MISSION FOR THE SAMPLE RETURN OF ASTEROIDS. |
| 2024-12-30 | 129 | Change order | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-12-10 | 128 | Funding only | $700.0K | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-10-01 | 127 | Funding only | -$120.0K | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-08-30 | 126 | Funding only | $1.00M | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-07-19 | 125 | Supplemental agreement (work within scope) | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-06-28 | 124 | Funding only | -$800.0K | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-06-05 | 123 | Funding only | $3.50M | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-04-18 | 122 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-04-04 | 121 | Funding only | $777.0K | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-02-21 | 120 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-02-07 | 119 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-02-07 | 118 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2024-01-11 | 117 | Funding only | $2.00M | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2023-11-29 | 116 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2023-11-02 | 115 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2023-09-22 | 114 | Funding only | $500.0K | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2023-09-20 | 113 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2023-09-20 | 112 | Additional work (new agreement) | $1.63M | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2023-03-08 | 111 | Funding only | $10.00M | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2023-02-14 | 110 | Funding only | $400.0K | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2023-01-05 | 109 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2022-12-09 | 108 | Administrative change | $0 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
| 2022-11-19 | 107 | Funding only | $1.50M | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗