W9123823C0014↗
Granite Construction Company received this contract from W075 Endist Sacramento, Department of the Army: $199.93M obligated so far for construction of other non-building facilities. It runs to 2026-12-02.
Key facts · data as of Oct 25, 2026
- Recipient
- Granite Construction Company
- Awarding agency
- Department of the Army (Department of Defense)
- Contracting office
- W075 Endist Sacramento (W91238)
- Obligated to date
- $199.93M
- Potential value
- $239.13M
- Ends
- 2026-12-02
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.
Cite this page: SpendQuery, Award W9123823C0014, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_W9123823C0014_9700_-NONE-_-NONE-
Granite Construction Company: all federal awards · Department of Defense: spending · W075 Endist Sacramento: what it buys · The follow-on: recompete brief
THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.
Up for re-bid: ends 2026-12-02. Recompete brief → · USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, California ↗
What it is
- Product or service
- Construction of Other Non-Building Facilities (PSC Y1PZ)
- Industry
- Other Heavy and Civil Engineering Construction (NAICS 237990)
- Contracting office
- W075 Endist Sacramento (W91238)
- Competition
- Full and open competition · 3 offers received
- Pricing
- Firm fixed price
- How it was bought
- Standalone contract
- Solicitation
- W9123823B0005
- Where the work is
- Yolo, CA · district CA-07
- Funding law
- Other emergency or disaster supplementals
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
45 actions since 2023-05-03. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-23 | A00032 | Supplemental agreement (work within scope) | $4.00M | ARCF SACRAMENTO BYPASS WEIR WIDENING CLINS 001, 1042 AND 1044 R00050 - CD055-2 REPLACE N ABUTMENT - NTE INCREASE |
| 2026-07-16 | P00012 | Supplemental agreement (work within scope) | $659.0K | ARCF SAC BYPASS WEIR WIDENING CLINS 1041 AND1044 R00049/CD040-2 DEMOLISH EXISTING AB2 ABUTMENT |
| 2026-07-01 | A00031 | Supplemental agreement (work within scope) | $85.5K | ARCF SAC BYPASS WEIR WIDENING CLIN 0034/ MOD U00038, R00048/CD060 (VEQ- SOIL TYPE 2)(100% NONFED) (P2 NO. 456852) |
| 2026-06-12 | P00011 | Supplemental agreement (work within scope) | $7.00M | ARCF SAC BYPASS WEIR WIDENING CLIN 1047/ MOD R00047/CD054-1 (PT 1 WEIR STRUCTURAL BACKFILL)(100% NONFED) (P2 NO. 456852) |
| 2026-05-27 | PZ0010 | Change order definitized | $187.2K | ARCF SAC BYPASS WEIR WIDENING DEFINITIZE CHANGE ORDER CD 49 - ADDITIONAL INSTRUMENTATION |
| 2026-04-27 | A00030 | Supplemental agreement (work within scope) | $58.6K | ARCF SAC BYPASS WEIR WIDENING RAZOR WIRE AND AGG SURFACING |
| 2026-04-23 | A00029 | Supplemental agreement (work within scope) | $15.6K | ARCF SAC BYPASS WEIR WIDENING REA FOR DIFFERING SITE CONDITIONS ENCOUNTERED DURING EXCAVATION OF A FIBER OPTIC TRENCH |
| 2026-04-17 | P00009 | Supplemental agreement (work within scope) | $3.50M | UNDEFINITIZED CONTRACT ACTION TO CONSTRUCT NORTH ABUTMENT PER THE REVISED DRAWINGS AND SPECIFICATIONS PROVIDED. |
| 2026-03-12 | A00028 | Supplemental agreement (work within scope) | $150.9K | IN-PROGRESS QUANTITY INCREASE OF 26,263.29 CUBIC YARD FOR SOIL TYPE 1 IN-PROGRESS QUANTITY INCREASE OF 1,379.29 CUBIC YARD FOR SOIL TYPE 4 |
| 2026-03-06 | P00008 | Supplemental agreement (work within scope) | $1.58M | CD 41 / MOD REFERENCE R00040 REA BASED ON CHANGED VEHICLE BRIDGE PILE TIP ELEVATIONS FOR 51 PILES FROM AB1 THROUGH AB2 |
| 2026-02-24 | A00027 | Supplemental agreement (work within scope) | -$223 | CD 45-2 / R00037 THIS MODIFICATION DEFINITIZES PREVIOUSLY EXECUTED MODIFICATION REFERENCE R00031 - PROVIDE ALL NECESSARY ITEMS REQUIRED TO INSTALL/MONITOR TWO ZERO-ANNULUS DIRECT PUSH PIEZOMETERS AT SPECIFIC LOCATIONS. |
| 2026-02-06 | P00007 | Supplemental agreement (work within scope) | $4.00M | R00039 CD 40-1 AB 2 DEMOLISH EXISTING AB ABUTMENT 1. CONTRACTOR TO DEMOLISH ABUTMENT 2 TO THE EXTENTS, GRADES, AND LIMITS AS DESCRIBED IN REVISED DRAWING CD-105 AND PROCURE 173 ADDITIONAL PILES FABRICATED OF ASTM A252, GRADE 3, 60 KSI STEEL. |
| 2026-02-05 | A00026 | Supplemental agreement (work within scope) | $121.3K | CONTRACT NO. W9123823C0014 ARCF SACRAMENTO BYPASS WEIR WIDENING. R00038 CD050 - UTILITY CONFLICT IN FP (RFI 229). TOTAL CONTRACT PRICE INCREASED BY $121,319.75. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| 2026-01-29 | A00025 | Supplemental agreement (work within scope) | $9.2K | CD 48 - GIRDER STORAGE COSTS REA STORAGE COSTS INCURRED FOR AN ADDITIONAL SEVEN MONTHS OF STORAGE FOR GIRDERS SUPPORTING SPANS C4 AND C5 |
| 2025-11-25 | A00024 | Supplemental agreement (work within scope) | $299.2K | CD 44 - CHANGES TO BULKHEAD GUARDRAIL CONFIGURATION CD 47 - GOV'T DIRECTED WORK TO INVESTIGATE, ADDRESS, AND/OR MONITOR THE SETTLEMENT OF THE NORTHERN WEIR ABUTMENT |
| 2025-11-17 | A00023 | Supplemental agreement (work within scope) | $53.7K | REA FOR ADDITIONAL COSTS TO OBTAIN NEW PERMIT COVERAGE AND TO MAINTAIN COMPLIANCE WITH THE PERMIT REQUIREMENTS FOR THE REMAINING DURATION OF THE CONTRACT. STATE WATER BOARD REQUIRES PERMIT COVERAGE UNDER THE 2022 CONSTRUCTION GENERAL PERMIT. |
| 2025-11-13 | A00022 | Supplemental agreement (work within scope) | $150.0K | WINTERIZING EFFORTS TO PREVENT EROSION OVER THE WINTER'S RAINY SEASON WHILE THE GOVERNMENT INVESTIGATES CONCERNS REGARDING THE WEIR STILLING BASIN AND ASSOCIATED SLAB SUBGRADE. |
| 2025-11-05 | P00006 | Change order | $600.0K | ADDITIONAL INSTRUMENTATION AND SUBSURFACE INVESTIGATIONS ARE NECESSARY TO PROVIDE ADDITIONAL GEOTECHNICAL INFORMATION ABOUT CURRENT SUBSURFACE CONDITIONS IN ORDER TO HAVE SUFFICIENT INFORMATION FOR A REDESIGN OF THE NORTH ABUTMENT. |
| 2025-09-03 | A00021 | Change order | $51.0K | CD 45-1 INSTALL 2 PUSH-IN PIEZOMETERS DATA FROM THE INSTALLATION OF THESE PUSH-IN PIEZOMETERS WILL SUPPORT AND INFLUENCE A COURSE OF ACTION DIRECTLY RELATED TO THE RESOLUTION OF THE NORTH ABUTMENT WINGWALL SETTLEMENT/REPLACEMENT CHANGE CD 40-1. |
| 2025-09-03 | A00020 | Supplemental agreement (work within scope) | $51.5K | DELETE FIBER OPTIC VAULT PER GOVERNMENT RESPONSE TO RFI 190 |
| 2025-08-19 | A00019 | Supplemental agreement (work within scope) | $243.6K | CD 34 - DESIGN CHANGES TO SOUTH ABUTMENT APPROACH |
| 2025-08-12 | A00018 | Supplemental agreement (work within scope) | $9.8K | CHANGE: CD038 TITLE: VEQ - CLIN 35 INTERIM QTY IN PROGRESS QUANTITIES FOR CLIN 35 CHANGE: CD043 TITLE: NOC 12 - PG&E SPLICE BOX REA REA FOR REDESIGN AND RE-FABRICATION REQUIRED TO COMPLY WITH DIRECTED CHANGES PER THE GOV'T RESPONSE TO RFI 179. |
| 2025-07-28 | A00017 | Supplemental agreement (work within scope) | $379.5K | VARIATION IN ESTIMATED QUANTITIES - CLIN 33 SOIL TYPE 1 |
| 2025-07-24 | P00005 | Administrative change | $0 | SAC WEIR CONST - NON - FEDERAL FUNDING |
| 2025-07-08 | A00016 | Supplemental agreement (work within scope) | $196.6K | ADJUSTMENT TO FINAL ESTIMATED QUANTITIES TO CLIN 79 AND AN REA FOR WORK ON EXISTING STILLING BASIN |
| 2025-05-20 | A00015 | Supplemental agreement (work within scope) | $175.0K | PHASE 2 TOPO SURVEY REA REA FOR MULTIPLE PRE-CONSTRUCTION SURVEY VISITS RFI 158 - LIFT GATE ALIGNMENT CONFLICT IN SELECT DRAWINGS LEBLS ACCESS RD REPAIR REA REA FOR THE REPAIR AND MAINTENANCE OF THE LEBLS CONNECTION ROAD FOR DWR EMERGENCY ACCESS. |
| 2025-05-01 | A00014 | Supplemental agreement (work within scope) | $162.6K | CD 33 - REA FOR GATE STEM/GUIDE DESIGN REVISIONS CD 35 - REA FOR GROUNDBREAKING CEREMONY STANDDOWN |
| 2025-04-15 | A00013 | Supplemental agreement (work within scope) | $243.6K | CD 17 - REA FOR 86 DAYS OF PILE DRIVING EQUIPMENT STANDBY COSTS. CD 25 - REA FOR THE REMOVAL AND DISPOSAL COSTS OF UNKNOWN SUB-SURFACE CONCRETE OBSTRUCTIONS. |
| 2025-04-01 | A00012 | Supplemental agreement (work within scope) | $262.6K | REA FOR DIFFERING SITE CONDITIONS BASED ON EARTHWORK AND AGGREGATE BASE DISCREPANCIES OF THE CENTRAL EMBANKMENT RAMP. |
| 2025-03-28 | A00011 | Supplemental agreement (work within scope) | $33.2K | MODIFICATION FOR THE FISH LADDER TOP OF WALL THICKNESS ENGINEERING CHANGE AND SWAINSON'S HAWK BIOLOGICAL MONITORING REA |
| 2025-02-26 | A00010 | Supplemental agreement (work within scope) | $40.5K | A10 | R17 - VEHICLE BRIDGE PILE HORIZONTAL TOLERANCE CHANGE |
| 2025-02-18 | A00009 | Supplemental agreement (work within scope) | $370.1K | SAC WEIR CONST - NON - FEDERAL FUNDING A09/R14 - REA FOR RAILROAD EMBANKMENT & OLD RIVER RD EXCAVATION |
| 2025-01-21 | A00008 | Supplemental agreement (work within scope) | $213.3K | CD 08 - DOWEL BAR MATERIAL SPECIFICATIONS CD 14 - N. ABUTMENT WING WALL REDESIGN |
| 2024-12-20 | A00007 | Supplemental agreement (work within scope) | $292.0K | CD013 REA FOR VEH BRIDGE PIER REBAR CHANGES |
| 2024-12-18 | P00004 | Supplemental agreement (work within scope) | $583.0K | SAC WEIR CONST - NON - FEDERAL FUNDING FISH PASSAGE PILE TIP ELEVATION CHANGE CD0010 |
| 2024-11-21 | A00006 | Supplemental agreement (work within scope) | $53.3K | MOD R9/A6 BAFFLE CHANGES CREDIT, REA FOR UNKNOWN UTILITIES, REA FOR WEIR ABUTMENT FOUNDATION PREP |
| 2024-10-24 | A00005 | Supplemental agreement (work within scope) | $0 | SAC WEIR CONST - NON - FEDERAL FUNDING |
| 2024-09-16 | P00003 | Supplemental agreement (work within scope) | $800.0K | SAC WEIR CONST - NON - FEDERAL FUNDING CD012-1 PILE DRIVING SPEC REVISION R00007/P00003 |
| 2024-05-30 | A00004 | Supplemental agreement (work within scope) | $49.1K | SAC WEIR CONST - NON - FEDERAL FUNDING |
| 2024-05-14 | A00003 | Supplemental agreement (work within scope) | $202.6K | SAC WEIR CONST - NON - FEDERAL FUNDING |
| 2024-05-01 | A00002 | Supplemental agreement (work within scope) | $43.3K | SAC WEIR CONST - NON - FEDERAL FUNDING R00004/CD004 CLIMATE CONTROLLED STORAGE |
| 2024-04-04 | A00001 | Supplemental agreement (work within scope) | $59.2K | SAC WEIR CONST - NON - FEDERAL FUNDING |
| 2023-08-09 | P00002 | Administrative change | $0 | SAC WEIR CONST - NON - FEDERAL FUNDING |
| 2023-06-08 | P00001 | Administrative change | $0 | SAC WEIR CONST - NON - FEDERAL FUNDING |
| 2023-05-03 | 0 | $172.95M | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. |