N045--Boiler 3 Oxygen Analyzer and Steam Flow Meter

Veterans Affairs, Department of · Veterans Affairs, Department of · 247-NETWORK CONTRACT OFFICE 7 (36C247) · Solicitation 36C24727Q0050 · NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) set-aside · offers due 2026-10-26 · Open on SAM.gov ↗

Posted
2026-10-22
Place of work
Georgia
Product or service code
N045 · Installation of Equipment- Plumbing, Heating, and Waste Disposal Equipment
Awarded to

Putting the brief together: the incumbent, who else wins this work, the contracting office and past prices…

From the notice

Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only. Burner 3 boiler/burner controls where applicable and local display. Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only? Oxygen analyzer must send signals/information to combustion controls to control trim. What is the material of construction for the stack? Is it single or double wall? Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S. Current operating pressure and temperature of the system for boiler #3? Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit. What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)? 4-20 mA analog. Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)? Steam flow meter is wired into local CB Hawk analog terminal block. Please provide nameplates for the existing oxygen analyzer and steam flow meter. Oxygen analyzer nameplate: Steam flow meter nameplate:

More open Plumbing, Heating, and Air-Conditioning Contractors contract opportunities

Who wins Plumbing, Heating, and Air-Conditioning Contractors contracts

All 47 open notices in NAICS 238220 · Plumbing, Heating, and Air-Conditioning Contractors: who buys it and who wins it · Contracts in this industry coming up for re-bid · The contracting office · Veterans Affairs, Department of: spending and contractors · How big Plumbing, Heating, and Air-Conditioning Contractors contracts usually are · Contract sizes in Georgia · Federal spending in Georgia · Federal contracts in Georgia