| 34000640432026↗ | Department of Transportation | UNIVERSITY OF OKLAHOMA | PROJECT GRANT (B) | 2026-04-06 | 2026-04-06 | 1 | PURPOSE: EXTEND/EXPAND RUNWAY; RECONSTRUCT TAXIWAY LIGHTING; STRENGTHEN RUNWAY; RESEAL/RESURFACE RUNWAY; RESEAL/RESURFACE TAXIWAY; CONSTRUCT TAXIWAY; EXTEND/EXPAND TAXIWAY; RECONSTRUCT RUNWAY VISUAL GUIDANCE SYSTEM; REALIGN TAXIWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS NEW 333 FOOT TAXIWAY C2 TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS PROJECT EXTENDS RUNWAY 3/21 AN ADDITIONAL 1,000 FEET IN LENGTH TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS PROJECT EXTENDS RUNWAY 36 AN ADDITIONAL 1,791 FEET IN LENGTH IN LENGTH TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS PROJECT EXTENDS TAXIWAY C BY AN ADDITIONAL 1,791 FEET IN LENGTH TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS PROJECT EXTENDS EXISTING TAXIWAY A BY AN ADDITIONAL 900 FEET IN LENGTH TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS PROJECT REALIGNS EXISTING PAVED TAXIWAY B BY 45 DEGREES TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS PROJECT RECONSTRUCTS EXISTING TAXIWAYS A, B, C, D, & E LIGHTING THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS THE PRECISION APPROACH PATH INDICATOR SYSTEM FOR RUNWAY 18/36, BOTH RUNWAY THRESHOLDS, THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS THE PRECISION APPROACH PATH INDICATOR SYSTEM FOR RUNWAY 3/21, BOTH RUNWAY THRESHOLDS, THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RESEALS 1,833 FEET OF EXISTING TAXIWAY A PAVEMENT AT A NONPRIMARY AIRPORT TO EXTEND ITS USEFUL LIFE. THIS PROJECT RESEALS 2,287 FEET OF EXISTING RUNWAY 3/21 PAVEMENT AT A NONPRIMARY AIRPORT TO EXTEND ITS USEFUL LIFE. THIS PROJECT STRENGTHENS EXISTING RUNWAY 18/36 TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH NORMAN, OKLAHOMA. | $26.81M |
| P063P252053↗ | Department of Education | UNIVERSITY OF OKLAHOMA | DIRECT PAYMENT FOR SPECIFIED USE, AS A SUBSIDY OR OTHER NON-REIMBURSABLE DIRECT FINANCIAL AID (C) | 2025-10-01 | 2026-09-17 | 370 | GRANT PROGRAM | $24.36M |
| P063P262053↗ | Department of Education | UNIVERSITY OF OKLAHOMA | DIRECT PAYMENT FOR SPECIFIED USE, AS A SUBSIDY OR OTHER NON-REIMBURSABLE DIRECT FINANCIAL AID (C) | 2026-06-12 | 2026-09-30 | 66 | GRANT PROGRAM | $22.04M |
| N000142612375↗ | Department of Defense | UNIVERSITY OF OKLAHOMA | PROJECT GRANT (B) | 2026-07-07 | 2026-07-07 | 1 | DISTRIBUTED RF CONCEPTS FOR FUTURE ELECTROMAGNETIC SPECTRUM OPERATIONS | $20.57M |
| NA26OARX432C0071↗ | Department of Commerce | UNIVERSITY OF OKLAHOMA | COOPERATIVE AGREEMENT (B) | 2026-07-02 | 2026-09-25 | 18 | THIS PROJECT SUPPORTS THE NATIONAL WEATHER SERVICE (NWS) IN ITS MISSION TO PROVIDE TIMELY AND ACCURATE FORECASTS AND WATCHES FOR SEVERE THUNDERSTORMS AND ASSOCIATED HAZARDS OVER THE CONTIGUOUS UNITED STATES AS WELL AS FORECAST THE ENVIRONMENTS CONDUCIVE FOR EXTREME FIRE BEHAVIOR. THE GOAL OF THE PROPOSED WORK IS TO DEVELOP LEADING-EDGE FORECAST TECHNOLOGIES FOR OPERATIONAL USE BY NWS FORECASTERS. WORK WILL INVOLVE FOUNDATIONAL RESEARCH TO ADVANCE THE DYNAMIC UNDERSTANDING OF MESOSCALE PHENOMENA AND SUBSEQUENTLY ENHANCE THE TECHNIQUES AND TECHNOLOGIES FOR THE FORECASTING OF THE SEVERE HAZARDS OF THESE PHENOMENA IN CONSIDERATION OF TIME-SCALE FROM NOWCASTING THROUGH SEASONAL. AS THE GOAL OF THIS PROJECT IS TO IMPLEMENT OPERATIONALLY ADVANCED FORECAST PRODUCTS, THE IMPLEMENTATION OF APPROPRIATE VERIFICATION METHODOLOGIES WILL BE EMPHASIZED AS WELL AS THE CAREFUL ANALYSIS OF PRODUCT PERFORMANCE DURING ORCHESTRATED TESTING PERIODS INCLUDING NOAAS HAZARDOUS WEATHER TESTBED (HWT), THE GOAL OF WHICH IS TO BRING TOGETHER RESEARCHERS AND OPERATIONAL FORECASTERS TO ASSESS AND DEVELOP CUTTING-EDGE SEVERE WEATHER GUIDANCE AND FORECASTING TECHNIQUES IN REAL-TIME AND DELAYED REAL-TIME SETTINGS. | $19.38M |
| DEFE0032608↗ | Department of Energy | UNIVERSITY OF OKLAHOMA | COOPERATIVE AGREEMENT (B) | 2026-09-24 | 2026-09-24 | 1 | THE OKLAHOMA CARBON HUB (OK HUB) WILL SUPERCHARGE A SUBSTANTIAL COMMERCIAL-SEQUESTRATION OPERATION BY INJECTING AT LEAST 54 MILLION TONNES OF CO2 (54 MTCO2) OVER 20 YEARS AT THREE SEPARATE LOCATIONS IN OSAGE RESERVATION AND KAY COUNTY, OKLAHOMA. DETAILED ANALYSES ARE CURRENTLY UNDERWAY ON A RECENTLY DRILLED WELL TO COLLECT CORE AND HIGH-RESOLUTION LOG DATA IN THE CONFINING ZONES AND INJECTION INTERVAL. THE PROPOSED PROJECT WOULD FUND THE DRILLING OF 4 ADDITIONAL WELLS TO COLLECT AND ANALYZE DATA FROM CORES HIGH-RESOLUTION LOGS, 21 MILES OF 2D SEISMIC LINES, AND 24 MI2 OF 3D SEISMIC ACROSS THE TWO SITES ALREADY MENTIONED AND A THIRD SITE (SITE 3 OF THIS STUDY) LOCATED APPROXIMATELY 5 MILES NORTHWEST OF SITE 2 IN KAY COUNTY. | $13.05M |
| H79SM090640↗ | Department of Health and Human Services | UNIVERSITY OF OKLAHOMA | PROJECT GRANT (B) | 2026-04-02 | 2026-06-30 | 2 | SUICIDE PREVENTION RESOURCE CENTER - THE SUICIDE PREVENTION RESOURCE CENTER (SPRC) AT THE UNIVERSITY OF OKLAHOMA (OU) WILL SERVE AS THE NATION'S ONLY FEDERALLY-FUNDED CENTER OF EXCELLENCE DEDICATED TO SUICIDE PREVENTION. WE WILL SERVE STATE, TERRITORIAL, TRIBAL, AND LOCAL SUICIDE PREVENTION SYSTEM LEADERS, HEALTH AND BEHAVIORAL HEALTH PROVIDERS AND HEALTH SYSTEMS, SAMHSA GRANTEES, AND RELATED ORGANIZATIONS AND SETTINGS LIKE EDUCATION, FOSTER CARE, AND FAITH COMMUNITIES. SPRC WILL SUPPORT CREDENTIALED OR LICENSED PROFESSIONALS, EMERGING PROFESSIONALS IN HIGHER EDUCATION AND PRACTICUM SETTINGS, PEERS AND COMMUNITY COALITION MEMBERS, AND INDIVIDUALS AND FAMILIES WITH SUICIDE-CENTERED LIVED EXPERIENCE. THE TTA SERVICES DELIVERED BY SPRC ACROSS PROFESSIONS, GEOGRAPHIC LOCATIONS, AND ORGANIZATIONS AND SETTINGS WILL ULTIMATELY IMPACT GROUPS AT HIGHER RISK FOR SUICIDE, PEOPLE WITH SUICIDE-CENTERED LIVED EXPERIENCE, AND COMMUNITIES AFFECTED BY SUICIDE LOSS. SPRC TTA STRATEGIES WILL BE INFORMED BY AN ANALYSIS OF BARRIERS TO IMPLEMENTING EVIDENCE-BASED STRATEGIES AND BEST PRACTICES. WE WILL USE THIS ANALYSIS TO DESIGN HIGH-IMPACT, MULTI-LEVEL, CAPACITY-BUILDING, AND OUTCOMES-FOCUSED TTA TO FILL THOSE GAPS. SPRC PROJECT GOALS INCLUDE (1) INCREASE THE CAPACITY OF STATE, TRIBAL, TERRITORIAL, AND COMMUNITY SYSTEMS, LEADERS, AND ORGANIZATIONS TO SUPPORT THE IMPLEMENTATION OF EFFECTIVE SUICIDE PREVENTION STRATEGIES; (2) STRENGTHEN AND SUSTAIN HIGH-IMPACT NATIONAL, STATE, AND LOCAL PARTNERSHIPS ACROSS PUBLIC AND PRIVATE SECTORS TO BUILD ALIGNMENT AND CONSENSUS AND ADVANCE THE FIELD OF SUICIDE PREVENTION; (3) IMPROVE CAPACITY OF STATES, TRIBES, HEALTH CARE SYSTEMS, AND PROVIDERS TO EFFECTIVELY SCREEN, ASSESS, INTERVENE, TREAT, AND FOLLOW UP WITH THOSE AT RISK OF SUICIDE AND USE THE ZERO SUICIDE MODEL; AND (4) INCREASE AVAILABILITY OF SUPPORT FOR THOSE AT HIGHEST SUICIDE RISK, SURVIVORS, AND FAMILIES TO IMPROVE CRISIS RESPONSE, HELP LOVED ONES GET CARE, AND INCREASE ACCESS TO COMMUNITY SUPPORTS. SPRC OBJECTIVES WILL INCLUDE: DEVELOPING AND MAINTAINING A BEST PRACTICES REGISTRY OF EVIDENCE-BASED AND BEST PRACTICES FOR SUICIDE RISK IDENTIFICATION, PREVENTION, AND INTERVENTION AMONG INDIVIDUALS AND COMMUNITIES AT HIGH RISK FOR SUICIDE; DEVELOPING AND DISSEMINATING STATE-WIDE AND TRIBAL EARLY PREVENTION AND INTERVENTION STRATEGIES FOR ALL AGES, PARTICULARLY FOR THOSE AT HIGH RISK FOR SUICIDE; DEVELOPING TTA PRODUCTS SUCH AS TRAININGS (E.G. SELF-PACED ONLINE LEARNING MODULES, TRAIN-THE-TRAINER ACTIVITIES) AND RESOURCES (E.G. IMPLEMENTATION GUIDES, FACT SHEETS, INFOGRAPHICS) TO ADDRESS BOTH UPSTREAM SUICIDE PREVENTION AND SUICIDE PREVENTION FOR GROUPS AT HIGH RISK FOR SUICIDE. OBJECTIVES ALSO INCLUDE RESPONDING TO REQUESTS FOR TTA ON SUICIDE PREVENTION, THE DEVELOPMENT AND IMPLEMENTATION OF COMPREHENSIVE COMMUNITY SUICIDE PREVENTION, UPSTREAM SUICIDE PREVENTION, EARLY INTERVENTION STRATEGIES, AND COMMUNITY-BASED SUICIDE PREVENTION CAPACITY BUILDING. SPRC WILL DEVELOP TRAININGS AND RESOURCES ON THE INTERSECTION OF HEALTH CARE AND SUICIDE, INCLUDING THE SEVEN-ELEMENT ZERO SUICIDE MODEL, TO PROMOTE AND IMPLEMENT EFFECTIVE CLINICAL AND PROFESSIONAL PRACTICES FOR ASSESSING AND TREATING THOSE IDENTIFIED AS BEING AT RISK FOR SUICIDAL BEHAVIOR. THE TRAININGS AND RESOURCES WILL BE PUBLICLY AVAILABLE ON THE SPRC WEBSITE AND WILL INCLUDE CONTINUING EDUCATION UNITS (CEUS) FOR VARIOUS HEALTHCARE PROFESSIONALS AND CONTINUING MEDICAL EDUCATION (CME) CREDIT FOR PHYSICIANS. AND SPRC WILL DEVELOP AND MAINTAIN A PRIVATE-PUBLIC PARTNERSHIP (ACTION ALLIANCE) TO ADVANCE THE WORK OF SUICIDE PREVENTION ACROSS ALL STATES AND TERRITORIES. SPRC WILL REACH OVER 17,000 NEWSLETTER SUBSCRIBERS EACH YEAR, PROVIDE RESOURCES AND TOOLS TO OVER 70,000 INDIVIDUALS ANNUALLY, AND PROVIDE WEB-BASED AND IN-PERSON TRAINING AND TECHNICAL ASSISTANCE TO OVER 15,000 PEOPLE ANNUALLY FOR A TOTAL REACH OVER 5 YEARS OF AT LEAST 497,500 INDIVIDUALS SERVED. IN ADDITION, WE WILL RECEIVE OVER | $10.21M |
| 693JK42650001↗ | Department of Transportation | UNIVERSITY OF OKLAHOMA | COOPERATIVE AGREEMENT (B) | 2026-02-23 | 2026-02-23 | 1 | THE RAV FOR FREIGHT MOVEMENT PROJECT AWARDS $10,000,000 TO THE UNIVERSITY OF OKLAHOMA AND A CONSORTIUM CONSISTING OF UNIVERSITY OF CALIFORNIA, BERKELEY, THE UNIVERSITY OF NEW MEXICO, AND GLD PARTNERS. TO CONDUCT RESEARCH, DEMONSTRATION AND FULL DEPLOYMENT OF RURAL AUTONOMOUS VEHICLES (RAV) FOR THE MOVEMENT OF GOODS. THE PROJECT WILL CONDUCT RESEARCH AND WORK WITH RURAL COMMUNITIES TO ADDRESS THE ADDITIONAL CHALLENGES, INCLUDING WEATHER VARIABLES AND DIFFERING TYPES OF ROADWAYS, OF BRINGING THE BENEFITS OF AUTONOMOUS VEHICLES, INCLUDING FREIGHT AND DELIVERY VEHICLES, TO RURAL AMERICANS. THE PURPOSE OF THIS COOPERATIVE AGREEMENT IS FOR UNIVERSITY OF OKLAHOMA THROUGH ITS AUTONOMOUS CARGO CARRIERS FOR ENHANCED LOGISTICS IN RURAL AND TRIBAL AREAS (ACCEL-RT) PROGRAM, TO ASSIST USDOT/OST-R IN THIS ENDEAVOR. THE INTENDED BENEFICIARIES WILL BE THE CITIZENS OF THE UNITED STATES, IN PARTICULAR RURAL AND TRIBAL COMMUNITIES. AWARD PURPOSE: THE RAV FREIGHT MOVEMENT PROJECT HAS A TOTAL OF TWO PHASES COVERING INITIAL TECHNOLOGY RESEARCH, DEMONSTRATION PROJECTS AND FULL DEPLOYMENT OF RAV IN RURAL AND TRIBAL COMMUNITIES. IN PHASE 1: DEMONSTRATION, THE ACCEL-RT PROGRAM FOCUSES ON ESTABLISHING FOUNDATIONAL PLANS, CONDUCTING EARLY AND FULL-SCALE DEMONSTRATIONS, AND ENGAGING KEY STAKEHOLDERS. THIS PHASE BEGINS WITH THE CREATION OF A COMPREHENSIVE PROGRAM MANAGEMENT PLAN (PMP) TO GUIDE RESEARCH, DEMONSTRATION, AND DEPLOYMENT ACTIVITIES, DETAILING GOVERNANCE STRUCTURES, PARTNER ROLES, AND OPERATIONAL PROCESSES. REGULAR UPDATES TO THIS PMP, ALONGSIDE QUARTERLY AND BI-ANNUAL REPORTS, ENSURE ALIGNMENT WITH DOT FEEDBACK AND PROJECT PROGRESS. THE PHASE INCLUDES FORMING AN ADVISORY COMMITTEE COMPOSED OF REPRESENTATIVES FROM ACADEMIA, INDUSTRY, GOVERNMENT, AND RURAL/TRIBAL COMMUNITIES, ALONGSIDE EXPANDING THE ACCEL-RT CONSORTIUM TO ENCOMPASS FREIGHT, LOGISTICS, AND AV STAKEHOLDERS. A TRAINING PROGRAM ON RURAL AUTONOMOUS VEHICLES (RAV) WILL BE DEVELOPED AND REFINED, WITH ONGOING REPORTING ON PARTICIPATION AND CURRICULUM PROGRESS. DEMONSTRATIONS ARE STAGED IN TWO STEPS INCLUDING EARLY LAUNCH PROJECTS USING MATURE TECHNOLOGIES TO ASSESS READINESS AND ACCEPTANCE, FOLLOWED BY LARGER-SCALE DEMONSTRATIONS ADDRESSING TRANSPORTATION CHALLENGES IN TARGETED RURAL AND TRIBAL COMMUNITIES. TASKS INCLUDE CREATING SYSTEMS ENGINEERING PLANS FOR EACH PROJECT, CAPTURING RESULTS THROUGH DEMONSTRATION REPORTS, FOSTERING COMMUNITY ENGAGEMENT, AND DEVELOPING A RAV ROADMAP REPORT TO GUIDE FUTURE INFRASTRUCTURE PLANNING.
PHASE 2: DEPLOYMENT BUILDS ON PHASE 1 FINDINGS TO IMPLEMENT SELECTED USE CASES IN REAL-WORLD COMMUNITY SETTINGS, FOCUSING HEAVILY ON REFINEMENT, EXECUTION, AND MEASUREMENT OF DEPLOYMENT SUCCESS. THE PMP AND TRAINING PROGRAM ARE UPDATED AS NEEDED, WITH CONTINUOUS REPORTING THROUGH QUARTERLY AND BI-ANNUAL REVIEWS. CONSORTIUM UPDATES DOCUMENT EVOLVING MEMBERSHIP AND ENGAGEMENT, WHILE DEPLOYMENT PLANS SPECIFY LOCATIONS, TIMELINES, AND OPERATIONAL DETAILS FOR THREE TARGETED RAV PROJECTS. SYSTEMS ENGINEERING PLANS ENSURE EFFICIENT, COST-EFFECTIVE IMPLEMENTATION WITH CLEAR KPIS FOR TECHNOLOGY AND COMMUNITY IMPACT ASSESSMENT. DEPLOYMENT RESULTS ARE COMPILED IN DETAILED REPORTS, COMPLEMENTED BY COMMUNITY ENGAGEMENT OUTPUTS THAT CAPTURE STAKEHOLDER INPUT AND PARTICIPATORY RESEARCH FROM THE DEPLOYMENT SITES. THIS PHASE CULMINATES IN DRAFTING AND FINALIZING A COMPREHENSIVE TECHNICAL REPORT SUMMARIZING ALL DEMONSTRATIONS, DEPLOYMENTS, AND ROADMAP ACHIEVEMENTS, INTEGRATING FINDINGS FROM BOTH PHASES AND PRESENTING THEM TO THE GOVERNMENT PM FOR REVIEW. THROUGH THESE ACTIVITIES, PHASE 2 TRANSITIONS ACCEL-RT FROM DEMONSTRATION TO SUSTAINABLE REAL-WORLD INTEGRATION OF RAV TECHNOLOGY IN RURAL AND TRIBAL LOGISTICS NETWORKS.SUBRECIPIENTS WILL BE CONSORTIUM MEMBERS OR INDUSTRY PARTNERS AS NEEDED. | $10.00M |