| R24AP00284↗ | Department of the Interior | AMERICAN RIVERS INC | GRANT | 2026-09-25 | 2026-09-25 | 1 | 1. AWARD PURPOSE:RESTORATION OF 196 ACRES OF FLOODPLAIN ALONG THE MAINSTEM SACRAMENTO RIVER THROUGH THE NORTH RIVER GARDEN FARMS FLOODPLAIN RESTORATION PROJECT WILL PROVIDE JUVENILE REARING HABITAT FOR FALL, LATE-FALL, WINTER AND SPRING-RUN CENTRAL VALLEY CHINOOK SALMON, AND STEELHEAD. THIS WILL BE ACHIEVED BY INCREASING THE EXTENT OF SEASONALLY INUNDATED REARING HABITAT, INCREASING FOOD PRODUCTION AND CONTRIBUTION TO THE RIVER, AND BY PROVIDING HIGH FLOW REFUGIA FOR OUT-MIGRATING JUVENILE SALMON. THE RESTORED FLOODPLAINS WILL OFFER A WIDE RANGE OF PERIODS WHEN REARING HABITAT IS AVAILABLE, SUPPORTING INCREASED PHENOTYPIC DIVERSITY IN THE SALMON RUNS, WHICH IMPROVES RESILIENCE TO STRESSORS SUCH AS CLIMATE CHANGE.2. ACTIVITIES TO BE PERFORMED:RESTORE HISTORICAL FLOODPLAIN SITES TO INCREASE THE EXTENT, DIVERSITY, AND ACCESS TO HIGH QUALITY REARING HABITAT FOR FRESHWATER LIFE STAGES OF ANADROMOUS SALMONIDS ALONG THE SACRAMENTO RIVER MAINSTEM.3. PROJECTED DELIVERABLES OR OUTCOMES: THROUGH THIS PROJECT, AMERICAN RIVERS WILL SHEPHERD DEVELOPMENT OF FOUR TO SIX ALTERNATIVE RESTORATION DESIGNS, VARYING ACCORDING TO LOCATION OF RIVER WATER INLETS AND OUTLETS ON THE TWO FLOODPLAIN SITES, TOPOGRAPHIC MANIPULATIONS, AND SOLUTIONS TO NAVIGATE EXISTING INFRASTRUCTURE. WE WILL DEVELOP NEPA CEQA DOCUMENTATION, INCLUDING PUBLIC OUTREACH, GATHER DATA, AND SUBMIT STATE AND FEDERAL PERMITS REQUIRED FOR RESTORATION. FUNDS WILL BE USED TO TAKE THESE PLANS FROM CONCEPTUAL TO 100% DESIGNS WITH SPECIFICATIONS AND FULLY IMPLEMENT EACH OF THE TWO FLOODPLAIN RESTORATIONS.4. INTENDED BENEFICIARIES:THE PROLONGED DROUGHT CURRENTLY AFFECTING CALIFORNIA HAS HAD A DRAMATIC IMPACT ON THE PEOPLE AND ECOSYSTEMS OF THE CENTRAL VALLEY. THE ALTERED HYDROLOGY AND WATER SCARCITY CHARACTERIZING THIS DROUGHT HAVE HAD A PARTICULARLY ACUTE EFFECT ON THE HEALTH AND VIABILITY OF ANADROMOUS SALMONID POPULATIONS LIKE CHINOOK SALMON. WHILE IMPROVED MANAGEMENT OF LIMITED WATER RESOURCES IS A KEY PART OF PROTECTING ANADROMOUS FISHES, RESTORATION OF FLOODPLAIN HABITAT HAS THE POTENTIAL TO PROVIDE IMMEDIATE BENEFITS TO THESE SPECIES WITH AVAILABLE WATER SUPPLIES.5. SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | $2.00M |
| NA26NMFX469G0044↗ | Department of Commerce | AMERICAN RIVERS INC | PROJECT GRANT (B) | 2026-08-11 | 2026-08-11 | 1 | EXPANDING TECHNICAL ASSISTANCE FOR PERMITTING SALMON RECOVERY AND COASTAL RESILIENCE PROJECTS. THIS PROJECT WILL HELP WASHINGTON'S DISADVANTAGED AND SOCIALLY VULNERABLE COMMUNITIES CAPITALIZE ON HISTORIC COASTAL RESILIENCY INVESTMENT OPPORTUNITIES AT THE FEDERAL AND STATE LEVEL, WHILE REDUCING THE ADMINISTRATIVE AND REGULATORY BURDEN FOR FEDERAL AGENCIES AND LOCAL PARTNERS ALIKE. SPECIFICALLY, THE PROJECT WILL HELP TO REMOVE BARRIERS IN UNDERSTANDING FEMAS MAPPING AND PERMITTING SYSTEM TO INCREASE THE PACE OF CLIMATE RESILIENCE PROJECTS AND BOLSTER STATE TECHNICAL CAPACITY TO PROCESS MAPPING AND PERMITTING PROCEDURES TO ADVANCE COASTAL RESTORATION STATEWIDE. ADDITIONALLY, THIS PROJECT AIMS TO ACCELERATE THE PACE OF REQUIRED REGULATORY PROCEDURES FOR URGENT PROJECTS ADDRESSING SALMON RECOVERY AND UPHOLDING TRIBAL TREATY RIGHTS. | $1.65M |
| F23AC01938↗ | Department of the Interior | AMERICAN RIVERS INC | COOPERATIVE AGREEMENT | 2026-09-04 | 2026-09-04 | 1 | AMERICAN RIVERS IS PARTNERING WITH THE U.S. FISH AND WILDLIFE SERVICE AND THE STATE OF WEST VIRGINIA TO REMOVE THE HARTLAND DAM ON THE WEST FORK RIVER AND WELLS LOCK DAM #3 ON THE LITTLE KANAWHA. REMOVAL OF BOTH DAMS IS IMPORTANT FOR RECOVERY OF TWO FEDERALLY-LISTED ENDANGERED FRESHWATER MUSSELS--CLUBSHELL (PLEUROBEMA CLAVA) AND SNUFFBOX (EPIOBLASMA TRIGUETRA), AS WELL AS 56 RECORDED SPECIES OF GREATEST NEED OF CONSERVATION (SGNCS) ACCORDING TO THE WEST VIRGINIA NATURAL HERITAGE PROGRAM. REMOVAL OF THE DAMS WILL RECONNECT IMPORTANT HABITAT FOR THESE MUSSELS AND THEIR AQUATIC HOST FISH. IT WILL ALSO ADDRESS RECREATIONAL SAFETY HAZARDS THE DAMS POSE AND ELIMINATE THE NEED FOR OPERATION AND MAINTENANCE COSTS. THE FUNDING REQUESTED IN THIS PROPOSAL IS TO SUPPORT THE DEVELOPMENT OF FINAL ENGINEERING DESIGNS, OBTAINMENT OF ALL NECESSARY STATE AND FEDERAL PERMITS, AND STAKEHOLDER ENGAGEMENT ASSOCIATED WITH THE WELLS LOCK DAM PROJECT ON THE LITTLE KANAWHA RIVER. | $175.0K |
| 26PA11050600006↗ | Department of Agriculture | AMERICAN RIVERS INC | OTHER REIMBURSABLE, CONTINGENT, INTANGIBLE, OR INDIRECT FINANCIAL ASSISTANCE | 2026-05-27 | 2026-05-27 | 1 | THE PROJECT INCLUDES TWO COMPONENTS TOWARD ADVANCING WATERSHED RESTORATION ACTIVITIES OF EAGLE LAKE RAINBOW TROUT POPULATIONS AND FOREST RESTORATION IN THE PINE CREEK WATERSHED: 1) IMPLEMENTING ADAPTIVE MANAGEMENT AT 140-ACRE CONFLUENCE MEADOW, AND 2) SECURING CALIFORNIA ENVIRONMENTAL QUALITY ACT PERMITS TO REMOVE A SUITE OF RELIC RAILROAD GRADES AND ROADS IN THE PINE CREEK VALLEY (10 ACRES). | $108.9K |
| F26AC00662↗ | Department of the Interior | AMERICAN RIVERS INC | COOPERATIVE AGREEMENT | 2026-09-03 | 2026-09-03 | 1 | AMERICAN RIVERS SEEKS SUPPORT FROM THE NATIONAL FISH PASSAGE PROGRAM FOR THE DESIGN OF THE E. BRANCH CALLICOONCREEK FISH PASSAGE RESTORATION PROJECT (PROJECT). THE PROJECT WILL REMOVE THE SPILLWAY OF THE LAKE JEFFERSON DAM ONTHE EAST BRANCH OF CALLICOON CREEK IN JEFFERSONVILLE, NEW YORK AND RESTORE THE FORMER RESERVOIR. LAKE JEFFERSON DAMIS A HUNDRED-YEAR-OLD HIGH HAZARD POTENTIAL MICRO HYDROPOWER DAM THAT LACKS FISH PASSAGE AND IS IN POOR PHYSICALCONDITION. THE SPILLWAY SPANS THE FULL CHANNEL WIDTH AND REMOVAL WILL RESTORE FISH PASSAGE, MITIGATE INFRASTRUCTUREFAILURE RISKS, AND ENHANCE WATERSHED RESILIENCE. FOR BREVITY IN THIS PROPOSAL, THE LAKE JEFFERSON DAM REMOVAL REFERS TOREMOVAL OF ITS SPILLWAY. THIS PROJECT DIRECTLY SUPPORTS THE FISH AND WILDLIFE SERVICES PRIORITY OF RESTORING FISH PASSAGEAND PROTECTING WILDLIFE.FUNDING WILL SUPPORT THE DESIGN OF THE PROJECT INCLUDING PRELIMINARY DATA COLLECTION, TOPOGRAPHIC AND BATHYMETRICMAPPING, HYDROLOGY AND HYDRAULICS MODELING, WETLAND ASSESSMENT AND DELINEATION, SEDIMENT EVALUATION, SPECIESANALYSIS, ENGINEERING DESIGN, AND PREPARATION OF PERMIT APPLICATIONS FOR REMOVAL. DELIVERABLES WILL INCLUDE 30%, 60%,AND 100% DESIGN PLANS, PERMIT APPLICATIONS, AND SUPPORTING TECHNICAL REPORTS. EXPECTED OUTCOMES INCLUDE ACOMPLETE, SHOVEL-READY DAM REMOVAL DESIGN THAT WILL SUPPORT FISH PASSAGE IN THE EAST BRANCH OF CALLICOON CREEK ANDIMPROVE PUBLIC SAFETY.THE INTENDED BENEFICIARIES INCLUDE AQUATIC SPECIES, THE LOCAL COMMUNITY OF JEFFERSONVILLE, AND THE BROADER DELAWARERIVER WATERSHED. LAKE JEFFERSON DAMS REMOVAL WILL ENHANCE WATER QUALITY, SEDIMENT DISTRIBUTION, AND FLOODPLAINHEALTH WHILE IMPROVING CONDITIONS FOR RECREATIONAL FISHING. THE 33 MILES OF UPSTREAM HABITAT ARE PRISTINE, WITH ONLY TWODAMS UPSTREAM BLOCKING SEPARATE BRANCHES OF THE CREEK. RESTORATION WILL STRENGTHEN THE LOCAL FISHING ECONOMY ANDOUTDOOR RECREATION.THE VILLAGE OF JEFFERSONVILLE, LOCATED DOWNSTREAM, FACES SIGNIFICANT ECONOMIC AND SAFETY RISKS SHOULD THE DAM FAIL. THEDETERIORATING STRUCTURE PROVIDES NO FLOOD CONTROL OR ECONOMIC BENEFIT, AND ITS REMOVAL WILL PROTECT THE HISTORIC DOWNTOWNFROM POTENTIAL FAILURE AND EXTREME WEATHER EVENTS.FUNDING FROM FISH AND WILDLIFE SERVICE IS A CRITICAL ADDITION TO ENSURING THE DESIGN AND PERMITTING CAN BE COMPLETED. | $58.0K |
| F22AP01632↗ | Department of the Interior | AMERICAN RIVERS INC | PROJECT GRANT (B) | 2026-01-13 | 2026-01-13 | 1 | BEAVERDAM CREEK DAM REMOVAL
THROUGH THE ADMINISTRATION OF THIS AWARD, THE U.S. FISH AND WILDLIFE SERVICE WILL FOSTER A COLLABORATIVE EFFORT WITH AMERICAN RIVERS TO REMOVE AN AQUATIC ORGANISM PASSAGE BARRIER LOCATED ON BEAVERDAM CREEK IN WAKE COUNTY, NORTH CAROLINA. UPON RECEIVING THE AWARD, AMERICAN RIVERS SHALL EMPLOY THE USE OF A CONTRACTOR TO REMOVE THE BARRIER AND ADMINISTER REMEDIATION EFFORTS TO THE CREEK POST-REMOVAL. THE PRIMARY ACTIVITIES FOR THE PROJECT ARE THE REMOVAL OF THE DAM AND STREAM BANK STABILIZATION TO REMEDIATE FOR INITIAL REMOVAL EFFORTS. EXPECTED DELIVERABLES INCLUDE THE SAFE REMOVAL OF THE DAM, STREAM BANK STABILIZATION POST-REMOVAL, AND HABITAT RESTORATION OF THE WORK SITE. THE EXPECTED BENEFICIARIES FOR THIS PROJECT ARE THE LOCAL FAUNA IN THE STREAM ECOSYSTEM (INCLUDING THE NATIVE BROOK TROUT) AND CITIZENS SURROUNDING THE CREEK THAT USE IT AS A SOURCE OF RECREATION. THE SURROUNDING WATERSHED WILL ALSO BENEFIT THROUGH THE EXPANSION OF HISTORICALLY RESTRICTED RIVER MILES. OTHER NATIVE AQUATIC ORGANISMS WILL ALSO HAVE AN EXPANDED RANGE THROUGHOUT THE WATERSHED THROUGH THE REMOVAL OF THIS BARRIER. | $0 |
| F24AC01484↗ | Department of the Interior | AMERICAN RIVERS INC | COOPERATIVE AGREEMENT | 2026-05-28 | 2026-05-28 | 1 | FUNDING OPPORTUNITY NUMBER: F24AS00300CFDA (S): 15.608 FISH AND WILDLIFE MANAGEMENT ASSISTANCEAPPLICANT NAME: AMERICAN RIVERSDESCRIPTIVE TITLE OF APPLICANT S PROJECT: SHULL S MILL DAM REMOVALPROJECT ABSTRACT:AMERICAN RIVERS IN PARTNERSHIP WITH MOUNTAINTRUE SEEK TO ADD OVER 35 MILES OF CONNECTIVITY TO THE WATAUGA RIVER NEAR BOONE, NORTH CAROLINA, THROUGH THE REMOVAL OF AN UNSAFE AND UNUSED DAM, THE SHULLS MILL DAM. BENEFITS OF THIS REMOVAL INCLUDE IMPROVED PUBLIC SAFETY AND AQUATIC HABITAT PARTICULARLY FOR TROUT AND EASTERN HELLBENDERS. THE SHULLS MILL DAM IS CONCRETE ARCH DAM BUILT IN 1924 FOR HYDROELECTRIC POWER FOR THE BLOWING ROCK POWER AND LIGHT COMPANY. FLOODING IN 1940 DEMOLISHED THE APPURTENANT HYDROELECTRIC FACILITIES, AND SINCE, IT REMAINS UNUSED AS AN ATTRACTIVE NUISANCE FOR THE LOCAL COMMUNITY AND HARMS AQUATIC PASSAGE. DAM REMOVAL IS A PROVED SOLUTION TO RECONNECT STREAMS TO BENEFIT BOTH PEOPLE AND NATURE. | $0 |
| F25AP01149↗ | Department of the Interior | AMERICAN RIVERS INC | GRANT | 2026-03-17 | 2026-03-17 | 1 | PROJECT ABSTRACT BATTLE CREEK IS A TRIBUTARY OF THE SACRAMENTO RIVER LOCATED IN SHASTA AND TEHAMA COUNTIES, CALIFORNIA, DRAINING THE WESTERN FLANKS OF MOUNT LASSEN. THE CREEK IS FED BY ABUNDANT COLD-WATER SPRINGS, WHICH CREATE YEAR-ROUND LOW TEMPERATURES AND DROUGHT-RESISTANT CONDITIONS THAT ARE ESSENTIAL FOR THE PRESERVATION, PROTECTION, AND RECOVERY OF SALMON AND TROUT. IN 1999, NUMEROUS STAKEHOLDERS ENTERED INTO AN AGREEMENT TO RESTORE ANADROMOUS FISH PASSAGE IN THE CREEK, AND THESE EFFORTS ARE ONGOING. ADDITIONALLY, PACIFIC GAS AND ELECTRIC COMPANY HAS INITIATED THE PROCESS OF LICENSE SURRENDER AND DECOMMISSIONING FOR THE BATTLE CREEK HYDROELECTRIC PROJECT. THIS DECOMMISSIONING IS EXPECTED TO LEAD TO SIGNIFICANT INFRASTRUCTURE REMOVALS THAT IMPACT THE WATER SUPPLY FOR THE COLEMAN NATIONAL FISH HATCHERY (CNFH).CNFH IS ONE OF THE LARGEST FISH PRODUCTION HATCHERIES IN THE COUNTRY, PLAYING A CRUCIAL ROLE IN SUPPORTING AN ECONOMICALLY SIGNIFICANT SPORT FISHERY AND WINTER RUN CHINOOK RECOVERY EFFORTS. HOWEVER, CHANGES IN THE STREAM CHANNEL, SEDIMENT DEPOSITION, AND A MALFUNCTIONING VALVE HAVE ADVERSELY AFFECTED OPERATIONS AT CNFH WATER INTAKE #2. GIVEN THESE CHALLENGES AND THE UNCERTAINTY SURROUNDING THE WATER SUPPLY FOR CNFH, THOROUGH INVESTIGATION AND PLANNING ARE REQUIRED TO ENSURE LASTING WATER SOURCES FOR CONTINUED HATCHERY OPERATIONS. THE PRIMARY GOAL OF THIS PROJECT IS DATA COLLECTION, HYDRAULIC AND SEDIMENT TRANSPORT MODELING, A COMPREHENSIVE GEOMORPHIC ASSESSMENT, AND RELATED ANALYSES IN VARIOUS FLOW SCENARIOS TO IDENTIFY OPTIONS AND MAKE RECOMMENDATIONS FOR THE UPGRADE AND OR REPLACEMENT OF CNFH INTAKE #2. TO ACHIEVE THIS, WE WILL THOROUGHLY MAP BOTH THE UPSTREAM AND DOWNSTREAM AREAS OF THE CURRENT INTAKE #2, COLLECT AND EVALUATE RELEVANT HISTORICAL DATA AND TRENDS, AND MODEL HYDRAULICS AND SEDIMENT TRANSPORT TO ASSESS LIKELY FUTURE SEDIMENT DYNAMICS IN THE RELEVANT REACH OF BATTLE CREEK. THIS WORK WILL FACILITATE OUR ESTABLISHING BASELINE DATA AND INFORMING FUTURE DESIGN FOR THE EFFICIENT DEVELOPMENT OF INTAKE #2 UPGRADE PLANS, INCLUDING: (1) SPECIFICATIONS AND ESTIMATED COSTS (PG E) THAT ENSURE ADEQUATE WATER DIVERSIONS FOR CNFH OPERATIONS, AND (2) THE ADDITION OF FISH SCREENS THAT COMPLY WITH RELEVANT NATIONAL MARINE FISHERIES SERVICE (NMFS) AND CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE (CDFW) CRITERIA. THIS WORK ALSO PROVIDES IMPORTANT INFORMATION TO SUPPORT FUTURE ENVIRONMENTAL COMPLIANCE REVIEW REQUIREMENTS WHEN UPGRADES TO INTAKE #2 ARE ADVANCED TO IMPLEMENTATION. | $0 |