| 00E07031↗ | Environmental Protection Agency | CITY OF TOLEDO | COOPERATIVE AGREEMENT | 2026-07-21 | 2026-07-21 | 1 | DESCRIPTION:THE CITY OF TOLEDO WILL CREATE INSTREAM HABITAT IN THE OTTAWA RIVER NEARSHORE RIVER WITHIN THE MAUMEE AREA OF CONCERN. WHEN IMPLEMENTED, THE RESTORATION WILL ADDRESS THREE BENEFICIAL USE IMPAIRMENTS: LOSS OF FISH AND WILDLIFE HABITAT, DEGRADATION OF FISH AND WILDLIFE POPULATIONS, AND DEGRADATION OF BENTHOS.ACTIVITIES: ACTIVITIES INCLUDE DEVELOPING A QUALITY ASSURANCE PROJECT PLAN, PREPARING A SOLICITATION PACKAGE TO PROCURE A CONTRACTOR, AND INSTALLING OF SHOALS, TOE WOOD AND VEGETATED AND NON-VEGETATED SHOALS TO REDUCE EROSION, IMPROVE WATER QUALITY, AND ENHANCE FISH AND WILDLIFE HABITATS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES: PROJECT DELIVERABLES INCLUDE ENGINEERING PLANS, SOLICITATION PACKAGE TO SUPPORT HABITAT IMPLEMENTATION AND ACQUISITION OF ALL NECESSARY PERMITS. THIS PROJECT WILL ENHANCE 2.5 ACRES OF NEARSHORE RIVER HABITAT THROUGH THE INSTALLATION OF SHOALS AND TOE WOOD, CREATE WETLAND HABITAT BY INSTALLING VEGETATED SHOALS, AND PROTECT 1,200 LINEAR FEET OF SHORELINE. THE INTENDED BENEFICIARIES INCLUDE PROJECT STAKEHOLDERS INCLUDING NEIGHBORING STUDENTS AND TEACHERS, AREA RESIDENTS, AND RECREATIONAL RIVER USERS IN TOLEDO, OHIO. | $2.60M |
| 693JJ32640415↗ | Department of Transportation | CITY OF TOLEDO | PROJECT GRANT (B) | 2026-03-05 | 2026-03-05 | 1 | THE SWAN CREEK GREENWAY PLANNING PROJECT WILL SUPPORT PLANNING, DESIGN, AND COMMUNITY ENGAGEMENT ACTIVITIES FOR A MULTI-USE TRAIL ALONG SWAN CREEK IN TOLEDO, OHIO TO RECONNECT THE DISADVANTAGED JUNCTION NEIGHBORHOOD TO DOWNTOWN TOLEDO. THE CONSTRUCTION OF INTERSTATE 75 IN THE 1960S DISPLACED JUNCTION RESIDENTS AND CUT OFF THE NEIGHBORHOOD FROM DOWNTOWN. THIS PROJECT'S PLANNING, DESIGN, AND COMMUNITY ENGAGEMENT ACTIVITIES WILL ADVANCE THE DEVELOPMENT OF THE PROPOSED GREENWAY, WHICH HAS BEEN IDENTIFIED AS A PRIORITY IN NEIGHBORHOOD PLANNING EFFORTS, WILL IMPROVE MOBILITY AND CONNECTIVITY TO JOBS AND ECONOMIC OPPORTUNITY, ADDRESS ENVIRONMENTAL BURDENS, AND IMPROVE QUALITY OF LIFE FOR JUNCTION RESIDENTS. | $1.11M |
| 00E03443↗ | Environmental Protection Agency | CITY OF TOLEDO | COOPERATIVE AGREEMENT | 2026-09-26 | 2026-09-26 | 1 | DESCRIPTION:BROWNFIELDS ARE REAL PROPERTY, THE EXPANSION, DEVELOPMENT OR REUSE OF WHICH MAY BE COMPLICATED BY THE PRESENCE OR POTENTIAL PRESENCE OF A HAZARDOUS SUBSTANCE, POLLUTANT, OR CONTAMINANT. THIS AGREEMENT WILL PROVIDE FUNDING FOR CITY OF TOLEDO TO CONDUCT ELIGIBLE ASSESSMENT-RELATED ACTIVITIES AS AUTHORIZED BY CERCLA 104(K)(2) IN CITY OF TOLEDO, OHIO.
ACTIVITIES:
SPECIFICALLY, THIS AGREEMENT WILL PROVIDE FUNDING TO THE RECIPIENT TO INVENTORY, CHARACTERIZE, ASSESS, AND CONDUCT CLEANUP PLANNING AND COMMUNITY INVOLVEMENT RELATED ACTIVITIES. ADDITIONALLY, THE RECIPIENT WILL COMPETITIVELY PROCURE (AS NEEDED) AND DIRECT A QUALIFIED ENVIRONMENTAL PROFESSIONAL TO CONDUCT ENVIRONMENTAL SITE ACTIVITIES. ALSO, THE RECIPIENT WILL REPORT ON INTERIM PROGRESS AND FINAL ACCOMPLISHMENTS BY COMPLETING AND SUBMITTING RELEVANT PORTIONS OF THE PROPERTY PROFILE FORM USING EPA'S ASSESSMENT, CLEANUP AND REDEVELOPMENT EXCHANGE SYSTEM (ACRES).
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:FURTHER, THE RECIPIENT ANTICIPATES CONDUCTING 20 PHASE I AND 12 PHASE II ENVIRONMENTAL SITE ASSESSMENTS, HOLDING 4 COMMUNITY MEETINGS, DEVELOPING 5 SITE-SPECIFIC CLEANUP PLANS/ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES, DEVELOPING 2 PLANNING DOCUMENTS TO INITIATE BROWNFIELDS REVITALIZATION, AND SUBMITTING 16 QUARTERLY REPORTS. WORK CONDUCTED UNDER THIS AGREEMENT WILL BENEFIT THE RESIDENTS, BUSINESS OWNERS, AND STAKEHOLDERS IN CITY OF TOLEDO, OHIO. | $500.0K |
| 00E03228↗ | Environmental Protection Agency | CITY OF TOLEDO | COOPERATIVE AGREEMENT (B) | 2026-03-12 | 2026-03-12 | 1 | DESCRIPTION:BROWNFIELDS ARE REAL PROPERTY, THE EXPANSION, DEVELOPMENT OR REUSE OF WHICH MAY BE COMPLICATED BY THE PRESENCE OR POTENTIAL PRESENCE OF A HAZARDOUS SUBSTANCE, POLLUTANT, OR CONTAMINANT. THIS AGREEMENT WILL PROVIDE FUNDING UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58) FOR THE CITY OF TOLEDO TO CONDUCT ELIGIBLE ASSESSMENT-RELATED ACTIVITIES AS AUTHORIZED BY CERLCA 104(K)(2).
PRIMARY ACTIVITIES INCLUDING ASSESSING BROWNFIELDS PROPERTIES ALLOWING SITES TO BE READY FOR ANTICIPATED REUSE. SPECIFICALLY, THE RECIPIENT WILL ASSESS, PLAN REUSE OF BROWNFIELDS PROPERTIES, AND CONDUCT PLANNING AND COMMUNITY INVOLVEMENT ACTIVITIES TO ENCOURAGE REVITALIZATION AND REUSE OF BROWNFIELDS SITES. THE AWARD WILL BE BIL FUNDED. PROJECT PERIOD IS 3 YEARS.
THE CITY HAS TARGETED THE GREATER DOWNTOWN AND THE DETROIT RAIL CORRIDOR AS FOCUS AREAS FOR ENVIRONMENTAL ASSESSMENT WORK WHICH WOULD LEAD TO LATER CLEANUP AND REDEVELOPMENT. ALL THE PROJECT LOCATIONS ARE LOCATED IN THE CITY OF TOLEDO, OHIO.ACTIVITIES:SPECIFICALLY, THIS AGREEMENT WILL PROVIDE FUNDING TO THE RECIPIENT TO INVENTORY, CHARACTERIZE, ASSESS, AND CONDUCT CLEANUP PLANNING AND COMMUNITY INVOLVEMENT RELATED ACTIVITIES. ADDITIONALLY, THE RECIPIENT WILL COMPETITIVELY PROCURE (AS NEEDED) AND DIRECT A QUALIFIED ENVIRONMENTAL PROFESSIONAL TO CONDUCT ENVIRONMENTAL SITE ACTIVITIES, AND WILL REPORT ON INTERIM PROGRESS AND FINAL ACCOMPLISHMENTS BY COMPLETING AND SUBMITTING RELEVANT PORTIONS OF THE PROPERTY PROFILE FORM USING EPA'S ASSESSMENT, CLEANUP AND REDEVELOPMENT EXCHANGE SYSTEM (ACRES).SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES: FURTHER, THE RECIPIENT ANTICIPATES CONDUCTING PHASE I AND PHASE 2 ENVIRONMENTAL SITE ASSESSMENTS, HOLDING COMMUNITY MEETINGS, DEVELOPING SITE-SPECIFIC CLEANUP PLANS/ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES, DEVELOPING PLANNING DOCUMENTS TO INITIATE BROWNFIELDS REVITALIZATION, AND SUBMITTING QUARTERLY REPORTS IN ACRES. WORK CONDUCTED UNDER THIS AGREEMENT WILL BENEFIT THE RESIDENTS, BUSINESS OWNERS, AND BROWNFIELD IN AND NEAR THE PROJECT AREA OF THE CITY OF TOLEDO, OHIO. | $0 |
| 00E03706↗ | Environmental Protection Agency | CITY OF TOLEDO | COOPERATIVE AGREEMENT (B) | 2026-05-04 | 2026-05-04 | 1 | DESCRIPTION:CITY OF TOLEDO WILL INCREASE PUBLIC ACCESS TO A RECENTLY NATURALLY-RESTORED WATERFRONT AREA COMPRISED OF 59 ACRES LOCATED ON THE LOWER MAUMEE RIVER NEAR THE MOUTH OF LAKE ERIE IN THE MAUMEE RIVER AOC. THE ACTIVITIES INCLUDE CONSTRUCTION OF PUBLIC ACCESS FEATURES, UPDATING AN OPERATIONS AND MAINTENANCE PLAN, CONDUCTING PUBLIC ENGAGEMENT AND CONTRACT OVERSIGHT AND ADMINISTRATION. THE ANTICIPATED DELIVERABLES INCLUDE A FULLY ACCESSIBLE 1-MILE LOOP TRAIL, A PAVED ENTRANCE DRIVE, A SMALL PARKING LOT, AN ELECTRIC ENTRANCE GATE, AN ACCESSIBLE KAYAK DOCK/LAUNCH, AND AN INFORMATIONAL KIOSK AND INTERPRETIVE SIGNAGE. THE EXPECTED OUTCOMES INCLUDE INCREASED PUBLIC ACCESS TO THE SITE, WHICH WILL FACILITATE PUBLIC EDUCATION AND ENGAGEMENT AND AID MONITORING EFFORTS TO DETERMINE THE EFFECTIVENESS OF THE HABITAT RESTORATION EFFORTS INITIATED IN AND FACILITATED BY THE FIRST PHASE OF THE PENN 7 PROJECT. POTENTIAL LONG-TERM OUTCOMES INCLUDE ENHANCED GREEN SPACE ACCESSIBILITY FOR#8239;NEIGHBORHOOD RESIDENTS; EXPANDED ENVIRONMENTAL LEARNING FOR#8239;COMMUNITY YOUTH; AND INCREASED ECONOMIC AND SOCIAL VALUE FOR#8239;THE SURROUNDING AREA. THE INTENDED BENEFICIARIES INCLUDE CITY OF TOLEDO RESIDENTS. NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT. ACTIVITIES: THE ACTIVITIES INCLUDE CONSTRUCTION OF PUBLIC ACCESS FEATURES, UPDATING AN OPERATIONS AND MAINTENANCE PLAN, CONDUCTING PUBLIC ENGAGEMENT AND CONTRACT OVERSIGHT AND ADMINISTRATION.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES: THE ANTICIPATED DELIVERABLES INCLUDE A FULLY ACCESSIBLE 1-MILE LOOP TRAIL, A PAVED ENTRANCE DRIVE, A SMALL PARKING LOT, AN ELECTRIC ENTRANCE GATE, AN ACCESSIBLE KAYAK DOCK/LAUNCH, AND AN INFORMATIONAL KIOSK AND INTERPRETIVE SIGNAGE. POTENTIAL LONG-TERM OUTCOMES INCLUDE ENHANCED GREEN SPACE ACCESSIBILITY FOR#8239;NEIGHBORHOOD RESIDENTS; EXPANDED ENVIRONMENTAL LEARNING FOR#8239;COMMUNITY YOUTH; AND INCREASED ECONOMIC AND SOCIAL VALUE FOR#8239;THE SURROUNDING AREA. THE INTENDED BENEFICIARIES INCLUDE CITY OF TOLEDO RESIDENTS NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT. | $0 |
| 00E03806↗ | Environmental Protection Agency | CITY OF TOLEDO | COOPERATIVE AGREEMENT (B) | 2026-02-24 | 2026-02-24 | 1 | DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO THE CITY OF TOLEDO. SPECIFICALLY THE CITY OF TOLEDO WILL CREATE INSTREAM HABITAT IN THE NEARSHORE AREA OF THE OTTAWA RIVER ALONG HARRY KESSLER PARK IN THE MAUMEE AREA OF CONCERN (AOC).ACTIVITIES:THE ACTIVITIES INCLUDE PREPARATION OF QUALITY ASSURANCE PROJECT PLAN, PROJECT ENGINEERING DESIGNS, PERMIT APPLICATION, SITE CONDITIONS AND ANALYSIS, CULTURAL RESOURCE INVESTIGATIONS AND OUTREACH.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:ANTICIPATED DELIVERABLES INCLUDE QUALITY ASSURANCE PROJECT PLAN, SITE CHARACTERIZATION, HYDROLOGIC AND HYDRAULIC MODELING, AND A FINAL DESIGN. THE EXPECTED OUTCOME INCLUDES RESTORED RIVER HABITAT CONDITIONS IN THE LOWER OTTAWA RIVER LED BY A LOCAL IMPLEMENTER. THIS RESTORATION WILL ADDRESS FISH POPULATIONS, BENTHIC POPULATIONS, AND FISH HABITAT BENEFICIAL USE IMPAIRMENTS IN THE LACUSTUARY PORTION OF THE OTTAWA RIVER. INTENDED BENEFICIARIES INCLUDE STUDENTS AND TEACHERS AT OTTAWA RIVER ELEMENTARY SCHOOL, ALL THOSE WHO LIVE, RECREATE, OR WORK IN THE MAUMEE RIVER AREA OF CONCERN. | $0 |
| 00E03979↗ | Environmental Protection Agency | CITY OF TOLEDO | COOPERATIVE AGREEMENT | 2026-08-06 | 2026-08-06 | 1 | DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF TOLEDO TO IMPLEMENT ITS PROJECT TO RESTORE THE OPERATIONAL PERFORMANCE OF THE BELT FILTER PRESSES (BFP) THROUGH A COMPREHENSIVE REBUILD AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.
ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: WASTEWATER TREATMENT PLANT IMPROVEMENTS.
SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE REPLACING ALL WORN COMPONENTS OF THE BFP SYSTEM, ALONG WITH ASSOCIATED UPGRADES TO RELATED EQUIPMENT, INCLUDING WASH WATER PUMPS, ELECTRICAL SYSTEMS, AND CONTROL COMPONENTS.
THE EXPECTED OUTCOMES INCLUDE REDUCED UNPLANNED DOWNTIME AND ENHANCED DEWATERING EFFICIENCY.
THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN THE CITY OF TOLEDO. | $0 |
| OHLHD0453-20↗ | Department of Housing and Urban Development | CITY OF TOLEDO | PROJECT GRANT (B) | 2026-01-20 | 2026-01-20 | 1 | LEAD-BASED PAINT HAZARD CONTROL IN PRIVATELY-OWNED HOUSING | -$297.9K |