City of Toledo (UEI TNJFH3L6JEC3) received $2.08M in federal obligations in FY2026 so far (Defense contracts arrive about 90 days late) in grants and other assistance, the most from Environmental Protection Agency ($3.10M). Its largest award, 00E07031, was $2.60M from Environmental Protection Agency.

Key facts · data as of Nov 21, 2026

Federal obligations, FY2026 so far
$2.08M
Largest customer
Environmental Protection Agency ($3.10M)

Source: USAspending.gov prime awards (obligations: money committed, not outlays), data as of Nov 21, 2026.

Cite this page: SpendQuery, City of Toledo federal contracts and awards, data as of Nov 21, 2026, https://spendquery.com/company?key=TNJFH3L6JEC3

UEI TNJFH3L6JEC3 · registered in OH

Why these numbers?
  • Sources: USAspending.gov awards and subawards, SAM.gov registrations, state checkbooks; data as of 2026-11-21.
  • A company's totals add up every registration rolled up under it (subsidiaries and locations); corrected parents and ownership changes are listed under its registrations.
  • Subcontracts are what prime contractors report; they are not added to the company's prime awards.
  • Amounts are obligations (money committed) by federal fiscal year (October to September), not outlays (money paid).

How we check the numbers · All sources

Year:
FY2026 obligations
$2.08M
▼ 91.9% vs FY2025
all awards, every registration rolled up
Largest customer
$3.10MEnvironmental Protection Agency
149% of its FY2026 money

Its whole relationship with the federal government

Brief

In FY2026, City of Toledo received $2.08M in federal awards, down 92% from FY2025. 149% of it came from the Environmental Protection Agency. The most money goes to work done in Ohio. Its largest reported subcontractor is City of Toledo ($308.00K). State and local checkbooks show another $1.85M from 2 governments.

Written from the numbers on this page, not by AI.

What it does

Reading its website…

Federal money by year

Federal · obligations

all years

Obligations by fiscal year across all loaded years: from $48.51M (2023) to $2.08M (2026).

Obligations by fiscal year
Fiscal yearObligations
2023$48.51M
2024$12.47M
2025$25.73M
2026$2.08M
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • No year given: covers FY2023–FY2026.
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: TNJFH3L6JEC3 → CITY OF TOLEDO
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Who pays it, FY2026

Federal · obligations

FY2026

$2.08Mall federal money · largest: Environmental Protection Agency $3.10M (149%)

Top 3 by obligations in FY2026. Leading: Environmental Protection Agency ($3.10M); Department of Transportation ($1.11M); Department of Housing and Urban Development (-$2.13M).

Obligations by agency, FY2026 · click a bar to drill in
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: TNJFH3L6JEC3 → CITY OF TOLEDO
  1. Source USAspending.gov prime awards · about the data

Open as a question →

What kind of money, FY2026

Federal · obligations

FY2026

$2.08Mall federal money · largest: grants $2.08M (100%)

Top 1 by obligations in FY2026. Leading: grants ($2.08M).

Award typeObligations
grants$2.08M
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Loan amounts are the government's estimated subsidy cost (what the loan is expected to cost it), not the amount lent; ask for loan face value for the amount lent.
  • Award types follow USAspending: grants include cooperative agreements; direct payments include benefits such as Social Security and Medicare; other = insurance and other assistance.
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: TNJFH3L6JEC3 → CITY OF TOLEDO
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Where the work is, FY2026

Federal · obligations

FY2026

Top 1 by obligations in FY2026. Leading: Ohio ($2.08M).

StateObligations
Ohio$2.08M
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Location is where the work is performed, not where the recipient is based.
  • Medicare payments are published as aggregate records placed where Medicare's claims contractors are (mostly Minnesota, Indiana, Pennsylvania, Kentucky, North Dakota, Connecticut, Florida and South Carolina), not where patients live, so those states show far more HHS money than their population suggests (ask for Medicare payments by patients' home state for where beneficiaries live).
  • '(outside the US)' is work performed abroad; '(not reported)' has no location in the source.
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: TNJFH3L6JEC3 → CITY OF TOLEDO
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Largest awards, FY2026

Federal · obligations

FY2026

Found 8 award(s) in FY2026. The largest is 00E07031 (CITY OF TOLEDO, Environmental Protection Agency) with $2.60M.

Award idAgencyRecipientAward typeFirst actionLast actionActionsDescriptionObligations
00E07031↗Environmental Protection AgencyCITY OF TOLEDOCOOPERATIVE AGREEMENT2026-07-212026-07-211DESCRIPTION:THE CITY OF TOLEDO WILL CREATE INSTREAM HABITAT IN THE OTTAWA RIVER NEARSHORE RIVER WITHIN THE MAUMEE AREA OF CONCERN. WHEN IMPLEMENTED, THE RESTORATION WILL ADDRESS THREE BENEFICIAL USE IMPAIRMENTS: LOSS OF FISH AND WILDLIFE HABITAT, DEGRADATION OF FISH AND WILDLIFE POPULATIONS, AND DEGRADATION OF BENTHOS.ACTIVITIES: ACTIVITIES INCLUDE DEVELOPING A QUALITY ASSURANCE PROJECT PLAN, PREPARING A SOLICITATION PACKAGE TO PROCURE A CONTRACTOR, AND INSTALLING OF SHOALS, TOE WOOD AND VEGETATED AND NON-VEGETATED SHOALS TO REDUCE EROSION, IMPROVE WATER QUALITY, AND ENHANCE FISH AND WILDLIFE HABITATS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES: PROJECT DELIVERABLES INCLUDE ENGINEERING PLANS, SOLICITATION PACKAGE TO SUPPORT HABITAT IMPLEMENTATION AND ACQUISITION OF ALL NECESSARY PERMITS. THIS PROJECT WILL ENHANCE 2.5 ACRES OF NEARSHORE RIVER HABITAT THROUGH THE INSTALLATION OF SHOALS AND TOE WOOD, CREATE WETLAND HABITAT BY INSTALLING VEGETATED SHOALS, AND PROTECT 1,200 LINEAR FEET OF SHORELINE. THE INTENDED BENEFICIARIES INCLUDE PROJECT STAKEHOLDERS INCLUDING NEIGHBORING STUDENTS AND TEACHERS, AREA RESIDENTS, AND RECREATIONAL RIVER USERS IN TOLEDO, OHIO.$2.60M
693JJ32640415↗Department of TransportationCITY OF TOLEDOPROJECT GRANT (B)2026-03-052026-03-051THE SWAN CREEK GREENWAY PLANNING PROJECT WILL SUPPORT PLANNING, DESIGN, AND COMMUNITY ENGAGEMENT ACTIVITIES FOR A MULTI-USE TRAIL ALONG SWAN CREEK IN TOLEDO, OHIO TO RECONNECT THE DISADVANTAGED JUNCTION NEIGHBORHOOD TO DOWNTOWN TOLEDO. THE CONSTRUCTION OF INTERSTATE 75 IN THE 1960S DISPLACED JUNCTION RESIDENTS AND CUT OFF THE NEIGHBORHOOD FROM DOWNTOWN. THIS PROJECT'S PLANNING, DESIGN, AND COMMUNITY ENGAGEMENT ACTIVITIES WILL ADVANCE THE DEVELOPMENT OF THE PROPOSED GREENWAY, WHICH HAS BEEN IDENTIFIED AS A PRIORITY IN NEIGHBORHOOD PLANNING EFFORTS, WILL IMPROVE MOBILITY AND CONNECTIVITY TO JOBS AND ECONOMIC OPPORTUNITY, ADDRESS ENVIRONMENTAL BURDENS, AND IMPROVE QUALITY OF LIFE FOR JUNCTION RESIDENTS.$1.11M
00E03443↗Environmental Protection AgencyCITY OF TOLEDOCOOPERATIVE AGREEMENT2026-09-262026-09-261DESCRIPTION:BROWNFIELDS ARE REAL PROPERTY, THE EXPANSION, DEVELOPMENT OR REUSE OF WHICH MAY BE COMPLICATED BY THE PRESENCE OR POTENTIAL PRESENCE OF A HAZARDOUS SUBSTANCE, POLLUTANT, OR CONTAMINANT. THIS AGREEMENT WILL PROVIDE FUNDING FOR CITY OF TOLEDO TO CONDUCT ELIGIBLE ASSESSMENT-RELATED ACTIVITIES AS AUTHORIZED BY CERCLA 104(K)(2) IN CITY OF TOLEDO, OHIO. ACTIVITIES: SPECIFICALLY, THIS AGREEMENT WILL PROVIDE FUNDING TO THE RECIPIENT TO INVENTORY, CHARACTERIZE, ASSESS, AND CONDUCT CLEANUP PLANNING AND COMMUNITY INVOLVEMENT RELATED ACTIVITIES. ADDITIONALLY, THE RECIPIENT WILL COMPETITIVELY PROCURE (AS NEEDED) AND DIRECT A QUALIFIED ENVIRONMENTAL PROFESSIONAL TO CONDUCT ENVIRONMENTAL SITE ACTIVITIES. ALSO, THE RECIPIENT WILL REPORT ON INTERIM PROGRESS AND FINAL ACCOMPLISHMENTS BY COMPLETING AND SUBMITTING RELEVANT PORTIONS OF THE PROPERTY PROFILE FORM USING EPA'S ASSESSMENT, CLEANUP AND REDEVELOPMENT EXCHANGE SYSTEM (ACRES). SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:FURTHER, THE RECIPIENT ANTICIPATES CONDUCTING 20 PHASE I AND 12 PHASE II ENVIRONMENTAL SITE ASSESSMENTS, HOLDING 4 COMMUNITY MEETINGS, DEVELOPING 5 SITE-SPECIFIC CLEANUP PLANS/ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES, DEVELOPING 2 PLANNING DOCUMENTS TO INITIATE BROWNFIELDS REVITALIZATION, AND SUBMITTING 16 QUARTERLY REPORTS. WORK CONDUCTED UNDER THIS AGREEMENT WILL BENEFIT THE RESIDENTS, BUSINESS OWNERS, AND STAKEHOLDERS IN CITY OF TOLEDO, OHIO.$500.0K
00E03228↗Environmental Protection AgencyCITY OF TOLEDOCOOPERATIVE AGREEMENT (B)2026-03-122026-03-121DESCRIPTION:BROWNFIELDS ARE REAL PROPERTY, THE EXPANSION, DEVELOPMENT OR REUSE OF WHICH MAY BE COMPLICATED BY THE PRESENCE OR POTENTIAL PRESENCE OF A HAZARDOUS SUBSTANCE, POLLUTANT, OR CONTAMINANT. THIS AGREEMENT WILL PROVIDE FUNDING UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58) FOR THE CITY OF TOLEDO TO CONDUCT ELIGIBLE ASSESSMENT-RELATED ACTIVITIES AS AUTHORIZED BY CERLCA 104(K)(2). PRIMARY ACTIVITIES INCLUDING ASSESSING BROWNFIELDS PROPERTIES ALLOWING SITES TO BE READY FOR ANTICIPATED REUSE. SPECIFICALLY, THE RECIPIENT WILL ASSESS, PLAN REUSE OF BROWNFIELDS PROPERTIES, AND CONDUCT PLANNING AND COMMUNITY INVOLVEMENT ACTIVITIES TO ENCOURAGE REVITALIZATION AND REUSE OF BROWNFIELDS SITES. THE AWARD WILL BE BIL FUNDED. PROJECT PERIOD IS 3 YEARS. THE CITY HAS TARGETED THE GREATER DOWNTOWN AND THE DETROIT RAIL CORRIDOR AS FOCUS AREAS FOR ENVIRONMENTAL ASSESSMENT WORK WHICH WOULD LEAD TO LATER CLEANUP AND REDEVELOPMENT. ALL THE PROJECT LOCATIONS ARE LOCATED IN THE CITY OF TOLEDO, OHIO.ACTIVITIES:SPECIFICALLY, THIS AGREEMENT WILL PROVIDE FUNDING TO THE RECIPIENT TO INVENTORY, CHARACTERIZE, ASSESS, AND CONDUCT CLEANUP PLANNING AND COMMUNITY INVOLVEMENT RELATED ACTIVITIES. ADDITIONALLY, THE RECIPIENT WILL COMPETITIVELY PROCURE (AS NEEDED) AND DIRECT A QUALIFIED ENVIRONMENTAL PROFESSIONAL TO CONDUCT ENVIRONMENTAL SITE ACTIVITIES, AND WILL REPORT ON INTERIM PROGRESS AND FINAL ACCOMPLISHMENTS BY COMPLETING AND SUBMITTING RELEVANT PORTIONS OF THE PROPERTY PROFILE FORM USING EPA'S ASSESSMENT, CLEANUP AND REDEVELOPMENT EXCHANGE SYSTEM (ACRES).SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES: FURTHER, THE RECIPIENT ANTICIPATES CONDUCTING PHASE I AND PHASE 2 ENVIRONMENTAL SITE ASSESSMENTS, HOLDING COMMUNITY MEETINGS, DEVELOPING SITE-SPECIFIC CLEANUP PLANS/ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES, DEVELOPING PLANNING DOCUMENTS TO INITIATE BROWNFIELDS REVITALIZATION, AND SUBMITTING QUARTERLY REPORTS IN ACRES. WORK CONDUCTED UNDER THIS AGREEMENT WILL BENEFIT THE RESIDENTS, BUSINESS OWNERS, AND BROWNFIELD IN AND NEAR THE PROJECT AREA OF THE CITY OF TOLEDO, OHIO.$0
00E03706↗Environmental Protection AgencyCITY OF TOLEDOCOOPERATIVE AGREEMENT (B)2026-05-042026-05-041DESCRIPTION:CITY OF TOLEDO WILL INCREASE PUBLIC ACCESS TO A RECENTLY NATURALLY-RESTORED WATERFRONT AREA COMPRISED OF 59 ACRES LOCATED ON THE LOWER MAUMEE RIVER NEAR THE MOUTH OF LAKE ERIE IN THE MAUMEE RIVER AOC. THE ACTIVITIES INCLUDE CONSTRUCTION OF PUBLIC ACCESS FEATURES, UPDATING AN OPERATIONS AND MAINTENANCE PLAN, CONDUCTING PUBLIC ENGAGEMENT AND CONTRACT OVERSIGHT AND ADMINISTRATION. THE ANTICIPATED DELIVERABLES INCLUDE A FULLY ACCESSIBLE 1-MILE LOOP TRAIL, A PAVED ENTRANCE DRIVE, A SMALL PARKING LOT, AN ELECTRIC ENTRANCE GATE, AN ACCESSIBLE KAYAK DOCK/LAUNCH, AND AN INFORMATIONAL KIOSK AND INTERPRETIVE SIGNAGE. THE EXPECTED OUTCOMES INCLUDE INCREASED PUBLIC ACCESS TO THE SITE, WHICH WILL FACILITATE PUBLIC EDUCATION AND ENGAGEMENT AND AID MONITORING EFFORTS TO DETERMINE THE EFFECTIVENESS OF THE HABITAT RESTORATION EFFORTS INITIATED IN AND FACILITATED BY THE FIRST PHASE OF THE PENN 7 PROJECT. POTENTIAL LONG-TERM OUTCOMES INCLUDE ENHANCED GREEN SPACE ACCESSIBILITY FOR#8239;NEIGHBORHOOD RESIDENTS; EXPANDED ENVIRONMENTAL LEARNING FOR#8239;COMMUNITY YOUTH; AND INCREASED ECONOMIC AND SOCIAL VALUE FOR#8239;THE SURROUNDING AREA. THE INTENDED BENEFICIARIES INCLUDE CITY OF TOLEDO RESIDENTS. NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT. ACTIVITIES: THE ACTIVITIES INCLUDE CONSTRUCTION OF PUBLIC ACCESS FEATURES, UPDATING AN OPERATIONS AND MAINTENANCE PLAN, CONDUCTING PUBLIC ENGAGEMENT AND CONTRACT OVERSIGHT AND ADMINISTRATION.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES: THE ANTICIPATED DELIVERABLES INCLUDE A FULLY ACCESSIBLE 1-MILE LOOP TRAIL, A PAVED ENTRANCE DRIVE, A SMALL PARKING LOT, AN ELECTRIC ENTRANCE GATE, AN ACCESSIBLE KAYAK DOCK/LAUNCH, AND AN INFORMATIONAL KIOSK AND INTERPRETIVE SIGNAGE. POTENTIAL LONG-TERM OUTCOMES INCLUDE ENHANCED GREEN SPACE ACCESSIBILITY FOR#8239;NEIGHBORHOOD RESIDENTS; EXPANDED ENVIRONMENTAL LEARNING FOR#8239;COMMUNITY YOUTH; AND INCREASED ECONOMIC AND SOCIAL VALUE FOR#8239;THE SURROUNDING AREA. THE INTENDED BENEFICIARIES INCLUDE CITY OF TOLEDO RESIDENTS NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.$0
00E03806↗Environmental Protection AgencyCITY OF TOLEDOCOOPERATIVE AGREEMENT (B)2026-02-242026-02-241DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO THE CITY OF TOLEDO. SPECIFICALLY THE CITY OF TOLEDO WILL CREATE INSTREAM HABITAT IN THE NEARSHORE AREA OF THE OTTAWA RIVER ALONG HARRY KESSLER PARK IN THE MAUMEE AREA OF CONCERN (AOC).ACTIVITIES:THE ACTIVITIES INCLUDE PREPARATION OF QUALITY ASSURANCE PROJECT PLAN, PROJECT ENGINEERING DESIGNS, PERMIT APPLICATION, SITE CONDITIONS AND ANALYSIS, CULTURAL RESOURCE INVESTIGATIONS AND OUTREACH.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:ANTICIPATED DELIVERABLES INCLUDE QUALITY ASSURANCE PROJECT PLAN, SITE CHARACTERIZATION, HYDROLOGIC AND HYDRAULIC MODELING, AND A FINAL DESIGN. THE EXPECTED OUTCOME INCLUDES RESTORED RIVER HABITAT CONDITIONS IN THE LOWER OTTAWA RIVER LED BY A LOCAL IMPLEMENTER. THIS RESTORATION WILL ADDRESS FISH POPULATIONS, BENTHIC POPULATIONS, AND FISH HABITAT BENEFICIAL USE IMPAIRMENTS IN THE LACUSTUARY PORTION OF THE OTTAWA RIVER. INTENDED BENEFICIARIES INCLUDE STUDENTS AND TEACHERS AT OTTAWA RIVER ELEMENTARY SCHOOL, ALL THOSE WHO LIVE, RECREATE, OR WORK IN THE MAUMEE RIVER AREA OF CONCERN.$0
00E03979↗Environmental Protection AgencyCITY OF TOLEDOCOOPERATIVE AGREEMENT2026-08-062026-08-061DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF TOLEDO TO IMPLEMENT ITS PROJECT TO RESTORE THE OPERATIONAL PERFORMANCE OF THE BELT FILTER PRESSES (BFP) THROUGH A COMPREHENSIVE REBUILD AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: WASTEWATER TREATMENT PLANT IMPROVEMENTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE REPLACING ALL WORN COMPONENTS OF THE BFP SYSTEM, ALONG WITH ASSOCIATED UPGRADES TO RELATED EQUIPMENT, INCLUDING WASH WATER PUMPS, ELECTRICAL SYSTEMS, AND CONTROL COMPONENTS. THE EXPECTED OUTCOMES INCLUDE REDUCED UNPLANNED DOWNTIME AND ENHANCED DEWATERING EFFICIENCY. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN THE CITY OF TOLEDO.$0
OHLHD0453-20↗Department of Housing and Urban DevelopmentCITY OF TOLEDOPROJECT GRANT (B)2026-01-202026-01-201LEAD-BASED PAINT HAZARD CONTROL IN PRIVATELY-OWNED HOUSING-$297.9K
Why this number?
  • Amounts are obligations (money committed), not outlays (money paid).
  • Company roll-ups match names and parent companies; some subsidiaries may be missed.
  • Matched: TNJFH3L6JEC3 → CITY OF TOLEDO
  • Amounts are the award's obligations within the selected years, not its lifetime value.
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Its subcontractors and subgrantees, FY2026

Federal · subawards

FY2026

$308.0KCITY OF TOLEDO

Top 1 by subaward amount in FY2026. Leading: CITY OF TOLEDO ($308.00K).

SubrecipientSubawards
CITY OF TOLEDO$308.0K
Why this number?
  • Subawards: subcontracts and subgrants prime recipients reported (SAM.gov / FSRS via USAspending), by the subaward's action date. They're part of the primes' obligations, never extra money; reporting is required only above $30,000 and is often late or incomplete. Company = the prime; subrecipient = who got the subaward (its parent company when reported). State is where the work is done when reported, else where the subrecipient is based. FY2025 is loaded.
  • Matched: TNJFH3L6JEC3 → CITY OF TOLEDO
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Primes reporting it as a subcontractor, FY2026

Federal · subawards

FY2026

$12.26MSTATE OF OHIO · #1 of 3 by subawards

Top 3 by subaward amount in FY2026. Leading: STATE OF OHIO ($12.26M); THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT ($706.13K); CITY OF TOLEDO ($308.00K).

Subaward amount by company, FY2026 · click a bar to drill in
Why this number?
  • Subawards: subcontracts and subgrants prime recipients reported (SAM.gov / FSRS via USAspending), by the subaward's action date. They're part of the primes' obligations, never extra money; reporting is required only above $30,000 and is often late or incomplete. Company = the prime; subrecipient = who got the subaward (its parent company when reported). State is where the work is done when reported, else where the subrecipient is based. FY2025 is loaded.
  • Matched: CITY OF TOLEDO → CITY OF TOLEDO (1 name)
  1. Source USAspending.gov prime awards · about the data

Open as a question →

Beyond federal awards

Also paid $1.85M by 2 state and local governments (FY2023–FY2025).

Paid byYearsPaid most byAmount
Oregon
as City of Toledo (a name other companies share: check)
FY2023–2025Business Oregon$1.85MBy year →
California
as City of Toledo (a name other companies share: check)
FY2024Teacher Credentialing Comm$10By year →

From each government's own checkbook, matched to this company by name (the payee as the state wrote it). State payments include federal grant money the state passes on, so never add them to the federal totals.

SAM.gov registration

  • UEI N669DP1XJCH6 · CAGE code 5F8T1
  • All awards (contracts and assistance) · TOLEDO, OH
  • Registered since 2009-04-24; expires 2027-08-24
  • In business since 1837-01-07
  • Primary NAICS 221320 · registered for 1 industries

Red flags

  • Single audit 2023: material weakness (City of Toledo)
  • Single audit 2022: material weakness (City of Toledo)

SAM.gov exclusions and the Federal Audit Clearinghouse (audits partly loaded).

From public government records, which may contain errors. Check the official source before relying on a number. Not financial, legal or investment advice. Terms · About the data

Download CSV of the summary: money by year, top agencies, industries, states and largest awards

Ask the AI chat about this company →