| P063P250300↗ | Department of Education | RENSSELAER POLYTECHNIC INSTITUTE | DIRECT PAYMENT FOR SPECIFIED USE, AS A SUBSIDY OR OTHER NON-REIMBURSABLE DIRECT FINANCIAL AID (C) | 2025-10-03 | 2026-09-28 | 21 | GRANT PROGRAM | $6.65M |
| P063P260300↗ | Department of Education | RENSSELAER POLYTECHNIC INSTITUTE | DIRECT PAYMENT FOR SPECIFIED USE | 2026-06-19 | 2026-09-25 | 4 | GRANT PROGRAM | $3.15M |
| N3560A26FB171↗ | Department of Defense | RENSSELAER POLYTECHNIC INSTITUTE | DELIVERY ORDER | 2026-03-18 | 2026-03-18 | 1 | RATIFICATION OF GOVERNMENT-AT-FALUT RETROACTIVE TUITION FOR SPRING 2026 NROTC MIDSHIPMEN TUITION AND ALLOWABLE FEES. | $1.58M |
| N3560A26FB045↗ | Department of Defense | RENSSELAER POLYTECHNIC INSTITUTE | DELIVERY ORDER | 2025-12-16 | 2025-12-16 | 1 | RATIFICATION OF GOVERNMENT-AT-FALUT RETROACTIVE TUITION FOR FALL SEMESTER 2025 NROTC MIDSHIPMEN TUITION AND ALLOWABLE FEES. | $1.51M |
| DESC0026879↗ | Department of Energy | RENSSELAER POLYTECHNIC INSTITUTE | PROJECT GRANT (B) | 2026-09-15 | 2026-09-15 | 1 | PHOTONUCLEAR PRODUCTION OF CO-57: PROOF-OF-CONCEPT | $1.19M |
| DENE0009655↗ | Department of Energy | RENSSELAER POLYTECHNIC INSTITUTE | GRANT | 2026-09-29 | 2026-09-29 | 1 | FUNDING OPPORTUNITY ANNOUNCEMENT (FOA) NUMBER: DE-FOA-0003410.
AS PART OF THE WHOLE-OF-GOVERNMENT APPROACH TO ADVANCE EQUITY AND ENCOURAGE WORKER ORGANIZING AND COLLECTIVE BARGAINING,5,6,7 AND IN ALIGNMENT WITH BIL SECTIONS AS OUTLINED IN THE CONSOLIDATED APPROPRIATIONS ACT OF 2024. THIS FOA AND ANY RELATED ACTIVITIES WILL SEEK TO ENCOURAGE MEANINGFUL ENGAGEMENT AND PARTICIPATION OF WORKFORCE ORGANIZATIONS, INCLUDING LABOR UNIONS, AS WELL AS UNDERSERVED GROUPS AND DISADVANTAGED COMMUNITIES, INCLUDING FEDERALLY RECOGNIZED INDIAN TRIBES. CONSISTENT WITH EXECUTIVE ORDER (EO) 14008,8 THIS FOA IS DESIGNED TO HELP MEET THE GOAL THAT 40% OF THE OVERALL BENEFITS OF CERTAIN FEDERAL INVESTMENTS FLOW TO DISADVANTAGED COMMUNITIES, AS DEFINED PURSUANT TO THE EXECUTIVE ORDER9, AND TO DRIVE CREATION OF ACCESSIBLE, GOOD-PAYING JOBS WITH THE FREE AND FAIR CHANCE FOR WORKERS TO JOIN A UNION.
TO MEET THE NEEDS OF AN EXPANDING NUCLEAR REACTOR FLEET, THE NUCLEAR ENERGY WORKFORCE IS ESTIMATED TO REQUIRE 375,000 ADDITIONAL TRAINED WORKERS TO RESEARCH, DESIGN, BUILD, MAINTAIN, AND OPERATE NEW REACTORS, WHILE MAINTAINING THE CURRENT NUCLEAR REACTOR FLEET. MORE INFORMATION ON THESE NEEDS CAN BE FOUND AT: HTTPS://LIFTOFF.ENERGY.GOV/WP-CONTENT/UPLOADS/2023/05/20230320-LIFTOFF-ADVANCED-NUCLEAR-VPUB-0329-UPDATE.PDF.
TO ADDRESS THIS CHALLENGE, ALL APPLICATIONS TO THIS FOA MUST:
• ESTABLISH A CONSORTIUM WITH INSTITUTIONS OF HIGHER EDUCATION (IHES), FOR-PROFIT ENTITIES, NONPROFIT ENTITIES, STATE AND LOCAL GOVERNMENTAL ENTITIES, INDIAN TRIBES, DOE/ NATIONAL NUCLEAR SECURITY ADMINISTRATION (NNSA) FFRDCS, LABOR ORGANIZATIONS/UNIONS, AND UTILITIES.
• IDENTIFY GAPS IN TRAINING, RECRUITING, AND RETAINING SKILLED WORKERS IN THE CURRENT NUCLEAR WORKFORCE.
• DEVELOP OR ENHANCE ONE OR MORE INDUSTRY RECOGNIZED NUCLEAR REACTOR SAFETY CREDENTIAL(S) THAT CAN BE USED TO ESTABLISH A NATIONAL STANDARD FOR WORKERS TO WORK ACROSS REACTOR TYPES.
• IDENTIFY PATHWAYS FOR SUSTAINABILITY OF DEVELOPED TRAINING PROGRAMS AND CERTIFICATES PAST THE PROJECT PERIOD OF PERFORMANCE BY ESTABLISHING MULTI-STAKEHOLDER AND INDUSTRY-WIDE PARTNERSHIPS, PROPOSING IMPLEMENTATION PLANS FOLLOWING THE PROGRAM, AND TRAINING MODULE DEVELOPMENT. | $1.18M |
| 60NANB26D108↗ | Department of Commerce | RENSSELAER POLYTECHNIC INSTITUTE | PROJECT GRANT (B) | 2026-08-20 | 2026-08-20 | 1 | PURPOSETHE PURPOSE OF THIS PROJECT IS TO ACQUIRE "QUANTUM INNOVATIONS IN COMPUTING KNOWLEDGE" (QUICK), AN EQUIPMENT-ONLY MILLIKELVIN QUANTUM-HARDWARE PLATFORM TO BUILD RENSSELAER POLYTECHNIC INSTITUTE'S (RPI) IN-HOUSE CAPABILITY TO DESIGN, FABRICATE, COOL, MEASURE, AND IMPROVE SUPERCONDUCTING-QUBIT PROTOTYPES AND HYBRID QUANTUM DEVICES. THE PLATFORM ADDRESSES A CURRENT INFRASTRUCTURE GAP, AS DECISIVE MEASUREMENTS FOR SUPERCONDUCTING QUBITS AND HYBRID QUANTUM SYSTEMS REQUIRE ROUTINE ACCESS TO MILLIKELVIN TEMPERATURES. THE PLATFORM WILL SERVE AS A COMPLETE QUANTUM-HARDWARE MEASUREMENT INSTRUMENT WHOSE CRYOGENIC AND ELECTRONIC LAYERS OPERATE AS A COHERENT SYSTEM.ACTIVITIES TO BE PERFORMED: THE RECIPIENT WILL PROCURE AND COORDINATE THE TECHNICAL SETUP OF A BLUEFORS DILUTION REFRIGERATOR SYSTEM EQUIPPED WITH GAS HANDLING, CRYOGENIC WIRING (RF, MICROWAVE, AND DC), LOW-NOISE AMPLIFICATION, A 3D VECTOR MAGNET, AND READOUT ELECTRONICS. RPI PERSONNEL WILL PREPARE STANDARD OPERATING PROCEDURES FOR CRYOGEN-FREE DILUTION REFRIGERATOR USE, SAFETY, SAMPLE TRACKING, AND DATA LOGGING. FOLLOWING INSTALLATION AND ACCEPTANCE TESTING BY THE VENDOR, RPI WILL INTEGRATE ROOM-TEMPERATURE ELECTRONICS AND INSTALL MICROWAVE CALIBRATION STANDARDS TO BENCHMARK BASELINE QUANTUM-DEVICE WORKFLOWS. ULTIMATELY, THE SYSTEM WILL SUPPORT INITIALLY ENABLED RESEARCH PROJECTS SPANNING CORRELATED-LOSS STUDIES, EPITAXIAL TRANSMON QUBITS, AND HIGH-GAP SUPERCONDUCTING QUBIT MATERIALS TO SUPPRESS QUASIPARTICLE LOSS. EXPECTED OUTCOMES: THE PROJECT WILL DELIVER A FULLY INSTALLED, COMMISSIONED, AND OPERATIONAL MILLIKELVIN QUANTUM-HARDWARE SYSTEM ALONGSIDE VERIFIED BASELINE RESONATOR AND QUBIT MEASUREMENT TEMPLATES. TECHNICAL MILESTONES INCLUDE A GUARANTEED CRYOSTAT BASE TEMPERATURE BELOW 10 MK, THREE-DIMENSIONAL VECTOR FIELD PATH CONTROL, AND FUNCTIONAL MICROWAVE-INTERFACE SIGNAL ROUTING. THE COMPLETED INFRASTRUCTURE WILL GENERATE DOCUMENTED ACCEPTANCE METRICS, AUTOMATED MEASUREMENT WORKFLOWS, OPERATING LOGS, AND PEER-REVIEWED SCIENTIFIC PUBLICATIONS. ADDITIONALLY, THE PLATFORM WILL ESTABLISH A HANDS-ON TRAINING ASSET FOR STUDENTS TO LEARN CHIP PACKAGING, CRYOGENIC INSTALLATION, AND LOW-TEMPERATURE MEASUREMENTS.INTENDED BENEFICIARIES: THE PRIMARY BENEFICIARIES ARE STUDENTS, RESEARCHERS, AND FACULTY PRINCIPAL INVESTIGATORS AT RENSSELAER POLYTECHNIC INSTITUTE WHO GAIN DIRECT, ON-CAMPUS ACCESS TO AN INTEGRATED EXPERIMENTAL QUANTUM HARDWARE WORKFLOW. STUDENTS ENROLLED IN RPI'S EXISTING QUANTUM-COMPUTING ECOSYSTEM AND RELATED COURSES WILL BENEFIT FROM A PLATFORM THAT CONNECTS CLOUD-ACCESSIBLE QUANTUM ALGORITHMS TO HANDS-ON DEVICE PHYSICS AND MATERIALS ENGINEERING. THE FACILITY WILL ALSO BENEFIT THE UNIVERSITY'S MATERIAL SCIENTISTS AND PHYSICISTS BY ENABLING IMMEDIATE EVALUATION OF CUSTOM-GROWN HIGH-GAP AND EPITAXIAL MATERIALS STRUCTURES.SUBRECIPIENT ACTIVITIES: THE RECIPIENT DOES NOT INTEND TO SUBAWARD FUNDS. | $1.03M |
| 60NANB26D107↗ | Department of Commerce | RENSSELAER POLYTECHNIC INSTITUTE | PROJECT GRANT (B) | 2026-08-19 | 2026-08-19 | 1 | PURPOSETHIS PROPOSAL IS REQUESTING FUNDS FOR EQUIPMENT TO CREATE THE BIOMANUFACTURING CORE FACILITY (BCF) IN THE CENTER FOR BIOTECHNOLOGY AND INTERDISCIPLINARY STUDIES (CBIS) AT RENSSELAER POLYTECHNIC INSTITUTE (RPI). THE EQUIPMENT REQUESTED INCLUDES A 100L FERMENTER, A CHILLER, A TANGENTIAL FLOW FILTRATION SYSTEM, A LYOPHILIZER, A RAMAN SPECTROSCOPY SYSTEM, A FLOW CYTOMETER ANALYZER, AND A LONG-READ SEQUENCER.ACTIVITIES TO BE PERFORMEDTHE PROJECT ACTIVITIES BEGIN WITH THE PROCUREMENT OF A SUITE OF INDUSTRIAL-GRADE EQUIPMENT, INCLUDING A 100L FERMENTER, RAMAN SPECTROSCOPY SYSTEM, AND A LONG-READ SEQUENCER, WHICH ARE ORDERED FROM MANUFACTURERS FOLLOWING STANDARD RPI TERMS AND CONDITIONS. ONCE THE EQUIPMENT IS DELIVERED TO THE CENTER FOR BIOTECHNOLOGY AND INTERDISCIPLINARY STUDIES (CBIS), PHD-LEVEL FACILITY DIRECTORS MANAGE THE TECHNICAL INSTALLATION AND CALIBRATION OF THESE DIVERSE TECHNOLOGIES. THE INSTALLATION OF THE 100L FERMENTER SPECIFICALLY REQUIRES THE COORDINATION OF PLUMBING AND ELECTRICAL POWER, A PROCESS SUPPORTED BY INSTITUTIONAL FUNDS AND OVERSEEN BY AN EXPERT TEAM TO ENSURE COMPLIANCE WITH SAFETY REQUIREMENTS AND PERFORMANCE SPECIFICATIONS. FOLLOWING INSTALLATION, THE TEAM CONDUCTS A SERIES OF FERMENTER TEST RUNS AND PERFORMANCE EVALUATIONS TO VALIDATE THE SYSTEM FOR INDUSTRIAL-SCALE USE. SIMULTANEOUSLY, THE FACILITY IS OPERATIONALIZED AS A "LIVING CLASSROOM" WHERE STUDENTS AND PROFESSIONALS RECEIVE HANDS-ON TRAINING ON THESE INDUSTRY-STANDARD PLATFORMS AND WORKFLOWS. FINALLY, THE FACILITY DIRECTORS UTILIZE ILABSOLUTIONS SOFTWARE TO MANAGE RESERVATIONS AND BILLING, ENSURING THAT ACCESS TO THE NEW INSTRUMENTATION REMAINS FULLY EQUITABLE FOR RPI RESEARCHERS, EXTERNAL ACADEMIC PARTNERS, AND INDUSTRIAL USERS.EXPECTED OUTCOMESTHE EXPECTED OUTCOMES OF THE PROJECT INVOLVE THE RADICAL IMPROVEMENT OF HUMAN HEALTH BY ACCELERATING THE DEVELOPMENT OF NEXT-GENERATION THERAPEUTICS, SUCH AS RNA-BASED MEDICINES AND PERSONALIZED CELL THERAPIES. BY PROVIDING THE INFRASTRUCTURE TO TRANSITION FROM BENCHTOP DISCOVERY TO 100L VALIDATION, THE FACILITY REDUCES THE RISK OF BATCH FAILURE AND BRINGS LIFE-SAVING TREATMENTS TO PATIENTS FASTER. THE PROJECT ALSO AIMS TO DELIVER SIGNIFICANT ENVIRONMENTAL AND AGRICULTURAL IMPACTS BY SERVING AS A TESTING GROUND FOR INNOVATIONS IN CLEAN WATER, INCLUDING THE DEVELOPMENT OF BIO-REMEDIATION TOOLS TO REMOVE "FOREVER CHEMICALS" (PFAS). FURTHERMORE, THE FACILITY WILL VALIDATE BIOLOGICAL FERTILIZERS AND PEST-RESISTANT CROP TRAITS AT A 100L SCALE TO REDUCE GLOBAL RELIANCE ON SYNTHETIC CHEMICALS. AS A CORNERSTONE FOR STEM TALENT DEVELOPMENT, THE FACILITY WILL ESTABLISH A SUSTAINABLE PIPELINE OF DIVERSE NEW YORK PROFESSIONALS EQUIPPED FOR HIGH-WAGE BIOTECH ROLES. ULTIMATELY, THESE EFFORTS WILL TRANSFORM THE NEW YORK CAPITAL REGION INTO A PRIMARY HUB FOR INDUSTRIAL-SCALE SOLUTIONS, FOSTERING A VIBRANT, INCLUSIVE ECONOMY THAT ENSURES A HEALTHIER AND SAFER WORLD.INTENDED BENEFICIARIESTHE PRIMARY BENEFICIARIES ARE ACADEMIC RESEARCHERS AND STARTUPS IN THE NY CAPITAL REGION WHO CURRENTLY LACK THE PILOT-SCALE EQUIPMENT REQUIRED FOR INDUSTRIAL VALIDATION. STUDENTS AND PROFESSIONALS WILL BENEFIT FROM SPECIALIZED TRAINING AND A SUSTAINABLE PIPELINE OF TALENT. ADDITIONALLY, THE REGIONAL ECONOMY AND GLOBAL COMMUNITY WILL BENEFIT FROM INNOVATIONS IN CLEAN WATER, ABUNDANT FOOD SYSTEMS, AND LIFE-SAVING TREATMENTS.SUBRECIPIENT ACTIVITIESTHE RECIPIENT DOES NOT INTEND TO SUBAWARD FUNDS. | $1.00M |