| 02F99701↗ | Environmental Protection Agency | COASTAL BEND BAYS & ESTUARIES PROGRAM, INC. | PROJECT GRANT (B) | 2026-01-27 | 2026-01-27 | 1 | DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58) TO THE COASTAL BEND BAYS AND ESTUARIES PROGRAM (CBBEP). THE RECIPIENT WILL SUPPORT IMPLEMENTATION OF THE COMPREHENSIVE CONSERVATION AND MANAGEMENT PLAN (CCMP) AND STRATEGIC PLAN TO IMPROVE WATER QUALITY, PROTECT THE NATURAL HABITAT AND LIVING RESOURCES, AND SUPPORT SUSTAINABLE HUMAN USES. THE PROJECTS PROPOSED FOR FUNDING VIA THE BIPARTISAN INFRASTRUCTURE LAW (BIL) WILL LEVERAGE EXISTING EFFORTS.ACTIVITIES:IIJA SUBRECIPIENT PROJECTS:
1. AIRPORT KAYAK LAUNCH SITE IMPROVEMENTS, ARANSAS COUNTY - THE PRIMARY OBJECTIVE OF THE PROJECT IS TO CONSTRUCT A NEW BOARDWALK AND MAKE ROADWAY IMPROVEMENTS TO FACILITATE ACCESS TO THE KAYAK LAUNCH SITE, COASTAL BIRDING AND ACCESS FISHING OPPORTUNITIES.
2. MASTER PLAN FOR NEW WETLAND PARK, CITY OF PORT ARANSAS - THE PRIMARY OBJECTIVE OF THE PROPOSED PROJECT IS TO CONTRACT FOR ENGINEERING SERVICES TO DEVELOP A MASTER PLAN FOR A 6-ACRE TRACT OF LAND IN THE CITY OF PORT ARANSAS. THE MASTER PLAN SHOULD EXPLORE ADDING PUBLIC ACCESS, ENHANCING AND CREATING HABITAT, REDUCING STORMWATER QUANTITY AND IMPROVING STORMWATER QUALITY.
3. NUECES DELTA PRESERVE INFRASTRUCTURE ENHANCEMENTS, PHASE II - THE PROJECT OBJECTIVE IS TO ENSURE ACCESSIBILITY FOR ALL INDIVIDUALS TO THE EDUCATIONAL PROGRAMS OFFERED AT CBBEP'S NUECES DELTA PRESERVE BY PROVIDING AMERICANS WITH DISABILITIES ACT (ADA)-COMPLIANT TRAILS, BOARDWALKS, PIER, AND WILDLIFE OBSERVATION PLATFORMS.
4. ARANSAS WOODS WILDLIFE VIEWING FEATURES, PHASE I - THE PRIMARY OBJECTIVE OF THE PROPOSED PROJECT IS TO INSTALL UP TO FIVE (5) STRATEGICALLY-LOCATED WILDLIFE VIEWING BLINDS THAT WILL ALLOW FOR SAFE VIEWING, PHOTOGRAPHY, AND NATURE STUDY.
5. ARANSAS FIRST PROGRAMMATIC SIGNAGE - THE PRIMARY OBJECTIVE OF THE PROPOSED PROJECT IS TO DEVELOP UNIFIED PROGRAMMATIC SIGNAGE FOR ARANSAS FIRST PROPERTIES TO IMPROVE THE VISITOR EXPERIENCE AND INTERPRETIVE STRENGTH AND INSTALL SIGNS AT THREE (3) ARANSAS FIRST SITES.
6. PROTECTION OF THE GULF INTRACOASTAL WATERWAY (GIWW) SHORELINE AT THE ARANSAS NATIONAL WILDLIFE REFUGE (ANWR), PHASE II - THE PROJECT WILL PROTECT DEGRADED SHORELINE AND IMPROVE RESILIENCY TO FUTURE SEA LEVEL RISE WITHIN THE ARANSAS NATIONAL WILDLIFE REFUGE THROUGH THE INSTALLATION OF APPROXIMATELY 2.2 MILES OF NEARSHORE ROCK BREAKWATERS. THE SPECIFIC PROJECT OBJECTIVE INCLUDES COMPLETION OF FINAL ENGINEERING AND DESIGN AND BID DOCUMENT DEVELOPMENT FOR PRIORITY AREAS ALONG THE GULF COASTAL INTRACOASTAL WATERWAY.
7. PROTECTION AND RESTORATION OF MATAGORDA ISLAND WEST MARSH, ANWR, PHASE III - THE OVERALL PROJECT GOAL IS RESTORE THE INFRASTRUCTURE NEEDED TO FACILITATE WATER MANAGEMENT BY UNITED STATES FISH AND WILDLIFE SERVICE (USFWS) ON APPROXIMATELY 6,000 ACRES OF ESTUARINE WETLANDS IN THE WEST MARSH AREA. THE PROJECT OBJECTIVE IS TO REPAIR AND REPLACE LEVEES AND WATER CONTROL STRUCTURES ON THE MATAGORDA ISLAND FINAL LOCATION AND UPGRADE CULVERTS AT TWO LOCATIONS WHERE THE BREACH WAS PREVIOUSLY REPAIRED.
8. NEWCOMB BEND MARSH RESTORATION, PHASE II - THE OVERALL PROJECT GOAL IS TO CONTINUE EFFORTS TO CONSERVE AND RESTORE THE SHORELINE, EMERGENT MARSH, AND ASSOCIATED NEARSHORE AND UPLAND HABITAT, AND WILDLIFE DEPENDENT UPON THIS HABITAT AT NEWCOMB MARSH IN COPANO BAY. THE SPECIFIC PROJECT OBJECTIVE IS TO COMPLETE THE SEDIMENT SOURCE ASSESSMENT, PRELIMINARY DESIGN, STAKEHOLDER ENGAGEMENT, AND REGULATORY PERMITTING FOR RESTORATION OF THE NEWCOMB BEND MARSH AREA.
9. FLOODING RISK ASSESSMENT FOR NESTS OF IMPERILED SHOREBIRDS IN SOUTH TEXAS - THE PRIMARY OBJECTIVE OF THE PROJECT IS TO: (1) ASSESS THE RISK OF FLOODING TO NESTING SITES FOR SNOWY PLOVER AND WILSON'S PLOVER IDENTIFIED BY CBBEP MONITORING AND (2) IDENTIFY SUITABLE NESTING AREAS OUTSIDE THE CBBEP MONITORING SITES THAT HAVE LOW RISK OF NEST FLOODING AND RECOMMEND AREAS WHERE MANAGEMENT AND CONSERVATION BENEFITS WOULD BE HIGHEST.
PROJECT MANAGEMENT: THE FY 2026 IIJA AN | $909.8K |
| 98685824↗ | Environmental Protection Agency | COASTAL BEND BAYS & ESTUARIES PROGRAM, INC. | GRANT | 2026-08-11 | 2026-08-11 | 1 | DESCRIPTION:SECTION 320 OF THE CLEAN WATER ACT (CWA) AUTHORIZES THE ADMINISTRATOR OF THE ENVIRONMENTAL PROTECTION AGENCY (EPA) TO CONVENE MANAGEMENT CONFERENCES TO DEVELOP COMPREHENSIVE CONSERVATION AND MANAGEMENT PLANS FOR ESTUARIES OF NATIONAL SIGNIFICANCE THAT ARE THREATENED BY POLLUTION, DEVELOPMENT, OR OVERUSE. THE AGREEMENT PROVIDES FUNDING TO THE COASTAL BEND BAYS AND ESTUARIES PROGRAM FOR NATIONAL ESTUARY PROGRAM (NEP) TO SUPPORT IMPLEMENTATION OF THE NEP COMPREHENSIVE CONSERVATION AND MANAGEMENT PLAN (CCMP) AND EPA PILLAR 1: CLEAN AIR, LAND, AND WATER FOR EVERY AMERICAN.ACTIVITIES:THE PROJECTS INCLUDED WILL SUPPORT ACTIVITIES THAT ADDRESS THE KEY CHALLENGES FACING THE ESTUARY INCLUDING ASSESSING TRENDS IN WATER QUALITY, HABITATS, NATURAL RESOURCES AND USES; COORDINATING IMPLEMENTATION OF THE CCMP BY THE NEP, ALONG WITH THE STATE, FEDERAL, LOCAL AGENCIES, STAKEHOLDERS, NON GOVERNMENT ORGANIZATIONS (NGOS), CITIZENS, PARTNERS, AND OTHERS; AND MONITORING THE EFFECTIVENESS OF ACTIVITIES CONDUCTED UNDER THE MANAGEMENT CONFERENCE APPROVED CCMP AND ANNUAL WORKPLAN.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:1. PROJECT #2701 COASTAL BIRD MANAGEMENT; THE DELIVERABLE FOR THIS PROJECT WILL BE A SUMMARY REPORT DOCUMENTING THE IMPLEMENTATION OF THE RESOURCE MANAGEMENT AND PUBLIC EDUCATION ACTIVITIES.
2. PROJECT #2702 DELTA DISCOVERY; THE CBBEP ENVIRONMENTAL EDUCATORS WILL PRODUCE A SUMMARY REPORT DOCUMENTING ALL ACTIVITIES ASSOCIATED WITH THE IMPLEMENTATION OF THIS PROJECT.
3. PROJECT #2703 COASTAL BEND BAYS PLAN UPDATE; DELIVERABLES FOR THIS PROJECT INCLUDE UP TO THREE STAKEHOLDER MEETINGS, DRAFT BAYS PLAN, FINAL BAYS PLAN, AND FINALIZED BAYS PLAN IN ONLINE FORMAT. ADDITIONAL DELIVERABLES INCLUDE SEMI-ANNUAL PROGRESS REPORTS, DRAFT FINAL REPORT, AND FINAL REPORT FROM THE CONTRACTOR.
4. PROJECT #2604 MONITORING AND ADAPTATIVE MANAGEMENT OF DREDGE
MATERIAL PLACEMENT IN NUECES BAY; DELIVERABLES FOR THIS PROJECT WILL INCLUDE COLLECTION OF TOPOGRAPHIC DATA, VEGETATION COMPOSITION AND COVERAGE DATA, AND UNMANNED AERIAL SYSTEM (UAS) PHOTOGRAMMETRY. DELIVERABLES ALSO INCLUDE A QAPP, SEMI-ANNUAL PROGRESS REPORTS, ADAPTIVE MANAGEMENT PLAN, DRAFT FINAL REPORT, AND FINAL REPORT.
5. PROJECT #2609 LAND CONSERVATION AND STEWARDSHIP; DELIVERABLES FOR THIS PROJECT WILL INCLUDE THE ONGOING MAINTENANCE AND MANAGEMENT OF PROPERTIES OWNED BY CBBEP, MECHANICAL BRUSH REMOVAL TO ENHANCE AT LEAST 100 ACRES, AERIAL HERBICIDE APPLICATION TO TREAT 200 ACRES OF INVASIVE BRUSH, AND ONGOING FACILITY MAINTENANCE AND IMPROVEMENTS. ADDITIONAL DELIVERABLES INCLUDE SEMI-ANNUAL PROGRESS REPORTS, DRAFT FINAL REPORT, AND FINAL REPORT
BENEFICIARIES INCLUDE THOSE LISTED IN A.23.B (STATE, FEDERAL, LOCAL AGENCIES, STAKEHOLDERS, NON GOVERNMENT ORGANIZATIONS (NGOS), CITIZENS, PARTNERS, AND OTHERS). | $850.0K |
| F26AC02003↗ | Department of the Interior | COASTAL BEND BAYS & ESTUARIES PROGRAM, INC. | COOPERATIVE AGREEMENT | 2026-08-17 | 2026-09-01 | 3 | THE COASTAL BEND BAYS ESTUARIES PROGRAM CBBEP IS SEEKING FUNDING AND TECHNICAL ASSISTANCE TO EXPAND ITS NATIVE PLANT NURSERY OPERATIONS AT THE NUECES DELTA PRESERVE TO INCREASE THE AVAILABILITY OF LOCALLY ADAPTED NATIVE PLANTS FOR COASTAL HABITAT RESTORATION PROJECTS THROUGHOUT THE TEXAS COASTAL BEND. THIS EXPANSION REFLECTS THE U.S. FISH AND WILDLIFE SERVICES SERVICE COMMITMENT TO PROVIDING SUPERIOR SERVICE TO THE PUBLIC BY ENSURING THAT RESTORATION PARTNERS HAVE RELIABLE ACCESS TO THE HIGH QUALITY PLANT MATERIAL NEEDED TO SUPPORT HEALTHY COASTAL ECOSYSTEMS. NATIVE VEGETATION PLAYS A CRITICAL ROLE IN RESTORING AND ENHANCING ROOKERY ISLANDS COASTAL MARSHES AND OTHER HABITATS THAT SUPPORT WILDLIFE PARTICULARLY COLONIAL NESTING WATERBIRDS. WHILE THE EXISTING NURSERY HAS SUCCESSFULLY SUPPLIED MORE THAN 6000 PLANTS FOR RESTORATION PROJECTS OVER THE PAST DECADE CURRENT FACILITIES HAVE REACHED CAPACITY AND ARE UNABLE TO MEET THE GROWING REGIONAL DEMAND FOR NATIVE PLANT MATERIALS. CBBEP AND THE SERVICE WILL WORK TOGETHER TO EXPAND THE GROW OUT CAPABILITIES THROUGH THE PLANNING DESIGN AND CONSTRUCTION OF AN ENHANCED NURSERY FACILITY POTENTIALLY INCLUDING A GREENHOUSE THAT WILL PROVIDE GREATER PROTECTION FROM EXTREME WEATHER INSECTS AND DISEASE WHILE IMPROVING PLANT SURVIVAL AND PRODUCTION EFFICIENCY. FUNDING WILL SUPPORT CONSULTATION WITH NURSERY PROFESSIONALS TO DEVELOP A COMPREHENSIVE FACILITY PLAN ADDRESSING LAYOUT IRRIGATION WATER SUPPLY PROPAGATION AREAS STORAGE LIGHTING AND OPERATIONAL NEEDS. FOLLOWING COMPLETION OF THE PLANNING PHASE CBBEP WILL CONTRACT WITH QUALIFIED PROFESSIONALS TO CONSTRUCT THE EXPANDED FACILITY AND ESTABLISH INFRASTRUCTURE NEEDED TO SUPPORT INCREASED PLANT PRODUCTION AND SPECIES DIVERSITY. THE OVERALL GOAL IS TO INCREASE THE QUANTITY AND DIVERSITY OF NATIVE PLANTS AVAILABLE FOR HABITAT RESTORATION PROJECTS ACROSS THE COASTAL BEND. HISTORICALLY THE NURSERY HAS FOCUSED ON PRODUCING SPECIES SUCH AS MESQUITE AND GRANJENO THAT PROVIDE CRITICAL NESTING STRUCTURE ON COASTAL ROOKERY ISLANDS. EXPANDED FACILITIES WILL ALLOW CBBEP TO INCREASE PRODUCTION OF THESE SPECIES WHILE BROADENING PLANT AVAILABILITY FOR ADDITIONAL RESTORATION EFFORTS INCLUDING COASTAL MARSH ENHANCEMENT AND OTHER HABITAT IMPROVEMENT PROJECTS. THE PROJECT WILL DIRECTLY BENEFIT COLONIAL NESTING WATERBIRDS THAT DEPEND ON VEGETATED ROOKERY ISLANDS INCLUDING PELICANS SPOONBILLS IBIS HERONS AND THE REDDISH EGRET AND SPECIES OF GREATEST CONSERVATION NEED. INCREASED PLANT AVAILABILITY WILL ALSO SUPPORT RESTORATION OF COASTAL MARSH HABITATS THAT PROVIDE CRITICAL ECOSYSTEM SERVICES INCLUDING WATER QUALITY IMPROVEMENT SHORELINE STABILIZATION STORM PROTECTION AND WILDLIFE HABITAT. PROJECT DELIVERABLES INCLUDE FACILITY PLANNING DOCUMENTS CONSTRUCTION OF AN EXPANDED GROW OUT FACILITY ANNUAL AND FINAL REPORTS AND ESTABLISHMENT OF A NURSERY CAPABLE OF SUPPORTING A BROADER RANGE OF RESTORATION INITIATIVES. UPON COMPLETION CBBEP WILL HAVE SIGNIFICANTLY ENHANCED CAPACITY TO PRODUCE NATIVE PLANTS FOR USE BY CBBEP AND ITS PARTNERS CREATING A SUSTAINABLE REGIONAL RESOURCE THAT SUPPORTS LONG TERM HABITAT RESTORATION WILDLIFE CONSERVATION AND ECOSYSTEM RESILIENCE THROUGHOUT THE TEXAS COASTAL BEND. | $48.0K |
| F26AC01952↗ | Department of the Interior | COASTAL BEND BAYS & ESTUARIES PROGRAM, INC. | COOPERATIVE AGREEMENT | 2026-08-19 | 2026-08-19 | 1 | THE COASTAL BEND BAYS AND ESTUARIES PROGRAM IS SEEKING FUNDING AND TECHNICAL ASSISTANCE TO ADVANCE TWO COMPLEMENTARY HABITAT RESTORATION INITIATIVES THAT WILL RESTORE CRITICAL HABITATS AND SUPPORT FISH AND WILDLIFE POPULATIONS THROUGHOUT THE TEXAS COASTAL BEND. THE PROJECT INCLUDES RESTORATION PLANNING AND DESIGN FOR PANTHER POINT IN THE SAN ANTONIO BAY SYSTEM AND CONSTRUCTION OF COMMUNITY SUPPORTED LIVING SHORELINES AT MULTIPLE LOCATIONS WITHIN THE REGION. BY COMBINING STRATEGIC PLANNING FOR A LARGE SCALE ECOSYSTEM RESTORATION EFFORT WITH ON THE GROUND IMPLEMENTATION OF NATURE BASED SHORELINE PROTECTION PROJECTS THIS INITIATIVE WILL DELIVER LASTING CONSERVATION BENEFITS FOR THE TEXAS COASTAL BEND AND THE COMMUNITIES THAT DEPEND UPON ITS NATURAL RESOURCES. IN ADDITION THIS PROJECT SERVES AS AN EXAMPLE OF THE SERVICES PROACTIVE APPLICATION OF THE ENDANGERED SPECIES ACT USING ITS AUTHORITIES EARLY IN PLANNING TO SUPPORT CONSERVATION OF SPECIES OF CONCERN AND INCORPORATE HABITAT ENHANCING MEASURES DIRECTLY INTO PROJECT DESIGN. THE PANTHER POINT SUBPROJECT WILL CARRY OUT ENGINEERING ANALYSES ALTERNATIVES EVALUATIONS 30 PERCENT DESIGN DEVELOPMENT AND PERMITTING TO ADVANCE THIS HIGH PRIORITY RESTORATION PROJECT. THE SECOND SUBPROJECT WILL IMPLEMENT LIVING SHORELINE PROJECTS AT MULTIPLE SITES EXPERIENCING SHORELINE EROSION AND MARSH LOSS. CBBEP WILL WORK WITH THE FISH AND WILDLIFE SERVICE AND SINK YOUR SHUCKS PROGRAM TO COMPLETE AN APPROXIMATELY 800 FOOT LIVING SHORELINE AT HANS AND PAT SUTER WILDLIFE REFUGE USING RECYCLED OYSTER SHELL AND SIMILAR MATERIALS TO REDUCE WAVE ENERGY AND STABILIZE THE SHORELINE. ADDITIONAL LIVING SHORELINE PROJECTS WILL BE IDENTIFIED AND CONSTRUCTED ELSEWHERE IN THE COASTAL BEND. THESE PROJECTS WILL RELY HEAVILY ON VOLUNTEER PARTICIPATION CREATING OPPORTUNITIES FOR HANDS ON CONSERVATION WHILE FOSTERING PUBLIC AWARENESS STEWARDSHIP AND COMMUNITY ENGAGEMENT IN COASTAL RESTORATION EFFORTS. TOGETHER THESE PROJECTS WILL RESTORE AND PROTECT HABITATS THAT SUPPORT NUMEROUS SPECIES OF CONSERVATION CONCERN INCLUDING THE ENDANGERED WHOOPING CRANE THREATENED PIPING PLOVER AMERICAN OYSTERCATCHER TERNS SKIMMERS AND A VARIETY OF RECREATIONALLY IMPORTANT FISH SPECIES SUCH AS RED DRUM BLACK DRUM AND SPOTTED SEATROUT. RESTORATION OF REEF MARSH SEAGRASS AND OYSTER HABITATS WILL IMPROVE ECOSYSTEM FUNCTION ENHANCE BIODIVERSITY INCREASE RESILIENCE TO STORMS AND STRENGTHEN ECOTOURISM OPPORTUNITIES ASSOCIATED WITH BIRDING FISHING AND WILDLIFE VIEWING. UPON COMPLETION PANTHER POINT WILL BE POSITIONED FOR FINAL ENGINEERING AND IMPLEMENTATION WHILE THE LIVING SHORELINE PROJECTS WILL PROVIDE IMMEDIATE HABITAT AND SHORELINE STABILIZATION BENEFITS. | $47.0K |
| F26AC01902↗ | Department of the Interior | COASTAL BEND BAYS & ESTUARIES PROGRAM, INC. | COOPERATIVE AGREEMENT | 2026-08-25 | 2026-08-25 | 1 | THE PROPOSED PROJECT IS A MULTI BENEFIT INITIATIVE THAT WILL RESTORE CRITICAL COLONIAL WATERBIRD HABITAT IN NUECES BAY THROUGH THE BENEFICIAL USE OF MATERIAL FROM THE DREDGING OF AN ACCESS CHANNEL FOR A NEARBY BOAT RAMP. THE PROJECT FOCUSES ON IMPROVING NAVIGATION BETWEEN THE CHRIS ANDREWS BOAT RAMP IN PORTLAND AND NUECES BAY WHERE EXISTING ROUTES ARE SHALLOW NARROW AND DIFFICULT TO NAVIGATE CREATING SAFETY CONCERNS FOR RECREATIONAL BOATERS. AT THE SAME TIME THE PROJECT WILL ADVANCE PLANS TO BENEFICIALLY USE DREDGED MATERIAL TO RESTORE CAUSEWAY BIRD ISLAND AN ECOLOGICALLY IMPORTANT ROOKERY ISLAND THAT HAS EXPERIENCED DECADES OF EROSION AND HABITAT LOSS. THIS EFFORT ADVANCES THE U.S. FISH AND WILDLIFE SERVICES COMMITMENT TO DELIVERING SUPERIOR SERVICE BY IMPROVING SAFE PUBLIC ACCESS WHILE ENSURING RESPONSIBLE COASTAL STEWARDSHIP. BUILDING UPON A FEASIBILITY STUDY COMPLETED IN FY2025 THIS PROJECT WILL DEVELOP 30 PERCENT ENGINEERING DESIGNS CONDUCT ENVIRONMENTAL AND HYDROGRAPHIC SURVEYS AND SECURE REGULATORY PERMITS FOR CONSTRUCTION OF A 60 FOOT WIDE 3700 FOOT LONG NAVIGATION CHANNEL AND ASSOCIATED LAUNCHING BASIN. THE PREFERRED ALTERNATIVE INCLUDES BENEFICIAL PLACEMENT OF DREDGED MATERIAL AT CAUSEWAY BIRD ISLAND LOCATED APPROXIMATELY 1.5 MILES FROM THE DREDGING AREA. THE ISLAND IS ALREADY AUTHORIZED TO RECEIVE UP TO 110000 CUBIC YARDS OF SEDIMENT FOR HABITAT RESTORATION AND REPRESENTS THE MOST PRACTICAL AND COST EFFECTIVE BENEFICIAL USE SITE DUE TO ITS PROXIMITY EXISTING PERMITS AND NEED FOR RESTORATION. RESTORATION OF CAUSEWAY BIRD ISLAND WILL ENHANCE NESTING HABITAT FOR COLONIAL WATERBIRDS INCLUDING PELICANS SPOONBILLS IBIS HERONS EGRETS TERNS AND SEVERAL TEXAS SPECIES OF GREATEST CONSERVATION NEED SUCH AS THE REDDISH EGRET LEAST TERN BLACK SKIMMER EASTERN WILLET AND SOOTY TERN. ENHANCED ROOKERY HABITAT WILL IMPROVE NESTING SUCCESS INCREASE BIODIVERSITY AND STRENGTHEN THE RESILIENCE OF THE REGIONS ESTUARINE ECOSYSTEM. THE PROJECT DEMONSTRATES HOW NAVIGATION IMPROVEMENTS AND HABITAT RESTORATION CAN BE INTEGRATED TO PROVIDE ENVIRONMENTAL ECONOMIC AND COMMUNITY BENEFITS. DELIVERABLES WILL INCLUDE ENVIRONMENTAL SURVEY REPORTS GIS DATA 30 PERCENT ENGINEERING DESIGNS PERMIT APPLICATION PACKAGES AND REGULATORY COORDINATION DOCUMENTATION. UPON COMPLETION THE PROJECT WILL BE READY TO ADVANCE INTO FINAL ENGINEERING AND DESIGN POSITIONING IT FOR FUTURE CONSTRUCTION AND IMPLEMENTATION. | $45.0K |
| F26AC01959↗ | Department of the Interior | COASTAL BEND BAYS & ESTUARIES PROGRAM, INC. | COOPERATIVE AGREEMENT | 2026-08-21 | 2026-08-21 | 1 | THE COASTAL BEND BAYS AND ESTUARIES PROGRAM (CBBEP) IS SEEKING FUNDING AND TECHNICAL SUPPORT FOR THE IMPLEMENTATION OF HABITAT MANAGEMENT ACTIVITIES ON COSTA GRANDE RANCH TO RESTORE CRITICAL COASTAL HABITATS ALONG ESPIRITU SANTO BAY. THIS PROJECT WILL ENHANCE ECOSYSTEM RESILIENCE IMPROVE WILDLIFE HABITAT AND CONTRIBUTE TO THE RECOVERY OF FEDERALLY LISTED SPECIES FOR GENERATIONS TO COME. COSTA GRANDE RANCH IS A 2232 ACRE PROPERTY IN CALHOUN COUNTY TEXAS CONTAINING EXTENSIVE FRESHWATER AND SALTWATER WETLANDS TIDAL FLATS COASTAL MARSHES AND UPLAND GRASSLANDS THAT PROVIDE IMPORTANT HABITAT FOR NUMEROUS SPECIES OF CONSERVATION CONCERN INCLUDING THE ENDANGERED WHOOPING CRANE AND THREATENED BLACK RAIL. THIS PROJECT SERVES AS AN EXAMPLE OF THE SERVICES PROACTIVE AND INNOVATIVE APPLICATION THE ENDANGERED SPECIES ACT USING ITS AUTHORITIES EARLY IN PLANNING TO SUPPORT CONSERVATION OF SPECIES OF CONCERN AND INCORPORATE HABITAT ENHANCING MEASURES DIRECTLY INTO PROJECT DESIGN. THIS PROJECT WILL RESTORE APPROXIMATELY 400 ACRES OF DEGRADED COASTAL GRASSLAND THROUGH TREATMENT OF INVASIVE RUNNING LIVE OAK. THIS AGGRESSIVE WOODY SPECIES FORMS DENSE THICKETS THAT REDUCE PLANT DIVERSITY LIMIT WILDLIFE USE AND DIMINISH THE OPEN GRASSLAND CONDITIONS REQUIRED BY MANY COASTAL SPECIES. CBBEP AND USFWS WILL IDENTIFY PRIORITY MANAGEMENT UNITS AND CONTRACT WITH A LICENSED APPLICATOR TO IMPLEMENT HERBICIDE TREATMENTS THAT HAVE PROVEN EFFECTIVE IN CONTROLLING RUNNING LIVE OAK AND RESTORING NATIVE HABITAT STRUCTURE. | $45.0K |
| F22AC02089↗ | Department of the Interior | COASTAL BEND BAYS & ESTUARIES PROGRAM, INC. | COOPERATIVE AGREEMENT | 2026-08-19 | 2026-08-19 | 1 | COASTAL BEND BAYS ESTUARIES PROGRAM, INC (CBBEP) IS PROPOSING TO CONTRACT WITH LOCAL SCHOOLS TO INSTALL THREE OUTDOOR CLASSROOMS PER YEAR FOR A TOTAL OF 15 OUTDOOR CLASSROOMS OVER A FIVE-YEAR PERIOD. WHILE EVERY OUTDOOR CLASSROOM CONTAINS ITS OWN UNIQUE DESIGN CHARACTERISTICS, CBBEP WILL STRIVE TO ENSURE THAT THEY ALL OBSERVE THE FOLLOWING KEY ELEMENTS: ECOLOGICALLY SOUND, BENEFIT WILDLIFE AND PEOPLE, INTEGRATED INTO CURRICULUM, DESIGNED TO ENCOURAGE LONG-TERM STEWARDSHIP. SCHOOLS WILL BE ENCOURAGED TO FOLLOW THE PROCESS DESCRIBED IN THE UNITED STATES FISH WILDLIFE SERVICE (USFWS) SCHOOLYARD HABITAT PROJECT GUIDE FOR THE DEVELOPMENT OF OUTDOOR CLASSROOMS, AND CBBEP STAFF WILL BE AVAILABLE TO ASSIST THEM WITH THIS PROCESS. | $18.0K |
| F19AC00054↗ | Department of the Interior | COASTAL BEND BAYS & ESTUARIES PROGRAM, INC. | COOPERATIVE AGREEMENT (B) | 2026-02-02 | 2026-02-02 | 1 | FUNDS UNDER THIS AWARD ARE TO BE USED TO: ADDRESS EROSION THAT OCCURRED DURING HURRICANE HARVEY ON THE BLACKJACK AND MATAGORDA ISLAND UNITS OF THE ARANSAS NATIONAL WILDLIFE REFUGE (NWR), ARANSAS AND CALHOUN COUNTIES, TEXAS. IMPACTED AREAS INCLUDED A PORTION OF THE SHORELINE THAT CONSISTS OF A REMNANT SANDY BEACHFRONT RIDGE THAT FORMS A BLUFF, AN AREA ALONG THE GULF INTRACOASTAL WATERWAY THAT CONSISTS OF TIDAL FLAT POOL COMMUNITY, AND LEVEES WATER MANAGEMENT FACILITIES ON MATAGORDA ISLAND. THE SANDY BLUFF CURRENTLY SUPPORTS A COASTAL WOODLAND PLANT COMMUNITY THAT IS IMPORTANT HABITAT FOR MIGRATORY BIRDS AND OTHER WILDLIFE. THE SERVICE WILL BE SUBSTANTIALLY INVOLVED IN PROJECTS UNDER THE FUNDING OPPORTUNITY. IN PARTICULAR, THE SERVICE WILL BE RESPONSIBLE FOR THE FOLLOWING: 1) PROVIDING FUNDING TO ASSIST COASTAL BEND BAYS AND ESTUARIES PROGRAM (CBBEP) WITH SHORELINE PROTECTION AND THE RESTORATION AND ENHANCEMENT OF LEVEES AND WATER CONTROL STRUCTURES THAT BENEFIT FEDERAL TRUST RESOURCES, PRIMARILY MIGRATORY BIRDS ALONG THE TEXAS COAST AS DESCRIBED HEREIN 2) THE SERVICE WILL PROVIDE OVERSIGHT, ACCESS, FACILITATE WORKGROUP MEETINGS AND PROJECT ASSESSMENTS 3) PROVIDE TECHNICAL ASSISTANCE, WHICH MAY INCLUDE BUT IS NOT LIMITED TO: A) SITE ASSESSMENTS AND LOGISTIC SUPPORT B) DEVELOP MANAGEMENT RECOMMENDATIONS AND IMPLEMENTATION STRATEGIES C) EVALUATE AND MONITOR MANAGEMENT STRATEGY EFFECTIVENESS D) CONDUCT SURVEY ASSESSMENTS AS NEEDED AND E) OTHER ASSISTANCE AS NECESSARY TO FACILITATE SUCCESSFUL IMPLEMENTATION OF THE PROJECT AS PROPOSED 4) ASSIST CBBEP WITH DEVELOPMENT OF CONCEPTUAL DESIGNS FOR THE PROJECT 5) ASSIST CBBEP WITH COMPILING ALTERNATIVES AND DETERMINING THE PREFERRED ALTERNATIVE 6) ASSIST CBBEP STAFF WITH SELECTING A QUALIFIED ENGINEERING FIRM 7) ASSIST CBBEP STAFF AND ENGINEERING FIRM TO DEVELOP CRITERIA FOR DESIGNING EROSION PROTECTION PLANS FOR ARANSAS NWR SHORELINE AND REPAIR REPLACEMENT OF LEVEES AND WATER MANAGEMENT FACILITIES ON THE MATAGORDA ISLAND UNIT 8) ASSIST CBBEP WITH DEVELOPMENT OF CONCEPTUAL DESIGNS FOR THE PROJECT 9) ASSIST CBBEP WITH SELECTION OF QUALIFIED CONTRACTOR FOR THE CONSTRUCTION PHASE OF THE PROJECT AND 10) PROVIDE AN EMPLOYEE INSPECTOR TO AID IN THE DAILY PROCESSES OF CONDUCTING AND COMPLETING WORK ON THE ARANSAS NWR TO ENSURE COMPLIANCE WITH ALL PROVISIONS AND PROTECTION OF WILDLIFE AND ARCHAEOLOGICAL RESOURCES TIMES, THE RECIPIENT, CBBEP, WILL BE RESPONSIBLE FOR MANAGING ALL ASPECTS OF THIS AGREEMENT ALONG WITH THE SERVICE S OVERSIGHT. CBBEP WILL BE RESPONSIBLE FOR SCHEDULING AND OVERSEEING THE WORK DESCRIBED IN THIS AGREEMENT AND WILL PROVIDE CONSTRUCTION OVERSIGHT FOR THE PROJECT. CBBEP HAS WORKED WITH THE SERVICE PREVIOUSLY ON IDENTIFYING SHORELINE PROTECTION PROJECTS AND RECENTLY ASSISTED WITH WATER MANAGEMENT FACILITIES ON MATAGORDA ISLAND. | $0 |