In plain English

This section explains the delivery term 'f.o.b. destination,' meaning the contractor must deliver supplies to the consignee's specified location at the contractor's expense. The contractor is responsible for packing, marking, shipping, and any loss or damage until the consignee receives the goods. It also requires contracting officers to include the clause at 52.247-34 in solicitations and contracts when this term is used.

Applies to: Contractors delivering supplies f.o.b. destination

What it requires

  • Pack and mark the shipment to comply with contract specifications or, if none, carrier requirements
  • Prepare and distribute commercial bills of lading
  • Deliver the shipment in good order and condition to the specified delivery point
  • Be responsible for loss or damage before the consignee receives the shipment

Key terms: f.o.b. destination · consignee · constructive placement · piggyback · heavy or bulky freight

Written by AI from this section's text. A guide, not legal advice: the text below rules.

The text

(a) Explanation of delivery term. F.o.b. destination means—

(1) Free of expense to the Government delivered, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or constructive placement as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery when required, if transfer to truck is required to complete delivery to consignee.

(b) Contractor responsibilities. The contractor shall—

(1)(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

(c) Contract clause. The contracting officer shall insert in solicitations and contracts the clause at 52.247-34, F.o.b. Destination, when the delivery term is f.o.b. destination.

Sections it refers to

Sections that refer to it

  • 47.303-7 F.o.b. destination, within consignee's premises.
  • 52.247-34 F.o.b. Destination.

← 47.303-5 F.o.b. origin, with differentials. · 47.303-7 F.o.b. destination, within consignee's premises. →

Rule changes for FAR Part 47

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Plain words for the terms: glossary.

FAR 47.303-6 F.o.b. destination · SpendQuery