The FAR overhaul, side by side

FAR Part 23: Environment, Sustainable Acquisition, and Material Safety

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 38 sections, 6,071 words (Part 23 as in force, eCFR as of Oct 29, 2026). Overhaul text: 22 sections, 2,412 words, titled "Sustainable Acquisition, Material Safety, and Pollution Prevention" (on acquisition.gov ↗, issued Sep 30, 2025). By number: 0 the same, 22 changed, 16 not in the overhaul, 0 new.

23.303: Changed (97% alike)

Today: Notice of radioactive materials.

This section in plain English

(a) The clause at 52.223-7, Notice of Radioactive Materials, requires the contractor to notify the contracting officer prior to delivery of radioactive material.

(b) Upon receipt of the notice, the contracting officer shall notify receiving activities so that appropriate safeguards can be taken.

(c) The clause permits the contracting officer to waive the notification if the contractor states that the notification on prior deliveries is still current. The contracting officer may waive the notice only after consultation with cognizant technical representatives.

(d) The contracting officer is required to specify in the clause at 52.223-7, the number of days in advance of delivery that the contractor will provide notification. The determination of the number of days should be done in coordination with the installation/facility radiation protection officer (RPO). The RPO is responsible for ensuring the proper license, authorization, or permit is obtained prior to receipt of the radioactive material.

Overhaul text: Notice of radioactive materials.

On acquisition.gov ↗

(a) The clause at 52.223-7, Notice of Radioactive Materials, requires the contractor to notify the contracting officer prior to delivery of radioactive material.

(b) Upon receipt of the notice, the contracting officer must notify receiving activities so that appropriate safeguards can be taken.

(c) The clause permits the contracting officer to waive the notification if the contractor states that the notification on prior deliveries is still current. The contracting officer may waive the notice only after consultation with cognizant technical representatives.

(d) The contracting officer must specify in the clause at 52.223-7, the number of days in advance of delivery that the contractor will provide notification. The determination of the number of days should be done in coordination with the installation/facility radiation protection officer (RPO). The RPO is responsible for ensuring the proper license, authorization, or permit is obtained prior to receiving radioactive material.

Section by section

SectionTodayOverhaul textStatusWords
23.000Scope of part.Scope of part.Changed · 50% alike39 → 21
23.001Definitions.noneNot in the overhaul52 → –
23.002Policy.noneNot in the overhaul44 → –
23.100Scope of subpart.Scope of subpart.Changed · 29% alike52 → 10
23.101Definitions.Definitions.Changed · 32% alike375 → 403
23.102Authorities.Policy.Changed · 5% alike93 → 72
23.103Policy.Procedures.Changed · 9% alike293 → 72
23.104General procedures.Priorities.Changed · 13% alike394 → 99
23.105Exceptions.Exceptions.Changed · 63% alike175 → 194
23.106Exemptions.Restrictions.Changed · 6% alike264 → 81
23.107Statutory purchasing programs.Agency programs.Changed · 2% alike16 → 174
23.107-1Products containing recovered materials.noneNot in the overhaul561 → –
23.107-2Biobased products.noneNot in the overhaul593 → –
23.107-3Energy-consuming products and water-consuming products.noneNot in the overhaul417 → –
23.107-4Products that contain, use, or are manufactured with ozone-depleting substances or products that contain or use high global warming potential hydrofluorocarbons.noneNot in the overhaul329 → –
23.108Required Environmental Protection Agency purchasing programs.Solicitation provisions and contract clauses.Changed · 6% alike38 → 311
23.108-1Water-efficient products.noneNot in the overhaul57 → –
23.108-2Chemically-intensive products.noneNot in the overhaul53 → –
23.108-3Products and services that are subject to EPA Recommendations of Specifications, Standards, and Ecolabels.noneNot in the overhaul98 → –
23.109Solicitation provisions and contract clauses.noneNot in the overhaul592 → –
23.200Scope.Scope of subpart.Changed · 82% alike57 → 43
23.201Authorities.Definition.Changed · 9% alike13 → 124
23.202Policy.Policy.Changed · 55% alike210 → 85
23.300Scope of subpart.Scope of subpart.Changed · 89% alike45 → 36
23.301Definition.Definition.Changed · 39% alike38 → 28
23.302Hazardous material identification and notice of material safety data.Hazardous material identification and safety data.Changed · 73% alike243 → 153
23.303Notice of radioactive materials.Notice of radioactive materials.Changed · 97% alike152 → 148
23.304Contract clauses.Contract clauses.Changed · 97% alike160 → 152
23.400Scope of subpart.Scope of subpart.Changed · 50% alike38 → 42
23.401Definitions.Definitions.Changed · 38% alike34 → 99
23.402Authorities.Emergency planning and toxic chemical release reporting.Changed · 15% alike46 → 35
23.403Emergency planning and toxic release reporting.Contract clauses.Changed · 18% alike60 → 30
23.404Environmental management systems.noneNot in the overhaul116 → –
23.405Waste reduction program.noneNot in the overhaul54 → –
23.406Contract clauses.noneNot in the overhaul142 → –
23.500Scope of subpart.noneNot in the overhaul12 → –
23.501Policy.noneNot in the overhaul78 → –
23.502Solicitation provision.noneNot in the overhaul38 → –