The FAR overhaul, side by side
FAR Part 7: Acquisition Planning
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 34 sections, 9,536 words (Part 7 as in force, eCFR as of Oct 29, 2026). Overhaul text: 26 sections, 4,822 words (on acquisition.gov ↗, issued Sep 4, 2025). By number: 5 the same, 21 changed, 8 not in the overhaul, 0 new.
7.103: Changed (17% alike)
Today: Agency-head responsibilities.
The agency head or a designee shall prescribe procedures for the following:
(a) Promoting and providing for full and open competition (see part 6) or, when full and open competition is not required in accordance with part 6, for obtaining competition to the maximum extent practicable, with due regard to the nature of the supplies and services to be acquired (10 U.S.C. 3206(a)(1) and 41 U.S.C. 3306(a)(1)).
(b) Encouraging offerors to supply commercial products or commercial services, or to the extent that commercial products suitable to meet the agency needs are not available, nondevelopmental items in response to agency solicitations (10 U.S.C. 3453 and 41 U.S.C 3307).
(c) Ensuring that acquisition planners address the requirement to specify needs, develop specifications, and to solicit offers in such a manner to promote and provide for full and open competition with due regard to the nature of the supplies and services to be acquired (10 U.S.C. 3206(a)(1) and 41 U.S.C. 3306(a)(1)). (See part 6 and 10.002.)
(d) Ensuring that acquisition planners document the file to support the selection of the contract type in accordance with subpart 16.1.
(e) Establishing criteria and thresholds at which increasingly greater detail and formality in the planning process is required as the acquisition becomes more complex and costly, including for cost-reimbursement and other high-risk contracts (e.g., other than firm-fixed-price contracts) requiring a written acquisition plan. A written plan shall be prepared for cost reimbursement and other high-risk contracts other than firm-fixed-price contracts, although written plans may be required for firm-fixed-price contracts as appropriate.
(f) Ensuring that the statement of work is closely aligned with performance outcomes and cost estimates.
(g) Writing plans either on a systems basis, on an individual contract basis, or on an individual order basis, depending upon the acquisition.
(h) Ensuring that the principles of this subpart are used, as appropriate, for those acquisitions that do not require a written plan as well as for those that do.
(i) Designating planners for acquisitions.
(j) Reviewing and approving acquisition plans and revisions to these plans to ensure compliance with FAR requirements including 7.104 and part 16. For other than firm-fixed-price contracts, ensuring that the plan is approved and signed at least one level above the contracting officer.
(k) Establishing criteria and thresholds at which design-to-cost and life-cycle-cost techniques will be used.
(l) Establishing standard acquisition plan formats, if desired, suitable to agency needs.
(m) Waiving requirements of detail and formality, as necessary, in planning for acquisitions having compressed delivery or performance schedules because of the urgency of the need.
(n) Assuring that the contracting officer, prior to contracting, reviews:
(1) The acquisition history of the supplies and services; and
(2) A description of the supplies, including, when necessary for adequate description, a picture, drawing, diagram, or other graphic representation.
(o) Ensuring that agency planners include use of the metric system of measurement in proposed acquisitions in accordance with 15 U.S.C. 205b (see 11.002(b)) and agency metric plans and guidelines.
(p) Ensuring that agency planners—
(1) Comply with the policy in 11.002(d) regarding procurement of sustainable products and services (as defined in 2.101) in accordance with subpart 23.1;
(2) Comply with the Guiding Principles for Sustainable Federal Buildings and Associated Instructions (Guiding Principles), for the design, construction, renovation, repair, or deconstruction of Federal buildings (see 36.104). The Guiding Principles can be accessed at https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf; and
(3) Require contractor compliance with Federal environmental requirements, when the contractor is operating Government-owned facilities or vehicles, to the same extent as the agency would be required to comply if the agency operated the facilities or vehicles.
(q) Ensuring that acquisition planners specify needs and develop plans, drawings, work statements, specifications, or other product or service requirements (e.g., help desks, call centers, training services, and automated self-service technical support) descriptions that address information and communication technology (ICT) accessibility standards (see 36 CFR 1194.1) in proposed acquisitions and that these standards are included in requirements planning (see subpart 39.2).
(r) Making a determination, prior to issuance of a solicitation for advisory and assistance services involving the analysis and evaluation of proposals submitted in response to a solicitation, that a sufficient number of covered personnel with the training and capability to perform an evaluation and analysis of proposals submitted in response to a solicitation are not readily available within the agency or from another Federal agency in accordance with the guidelines at 37.204.
(s) Ensuring that no purchase request is initiated or contract entered into that would result in the performance of an inherently governmental function by a contractor and that all contracts or orders are adequately managed so as to ensure effective official control over contract or order performance.
(t) Ensuring that knowledge gained from prior acquisitions is used to further refine requirements and acquisition strategies. For services, greater use of performance-based acquisition methods should occur for follow-on acquisitions.
(u) Ensuring that acquisition planners, to the maximum extent practicable—
(1) Structure contract requirements to facilitate competition by and among small business concerns; and
(2) Avoid unnecessary and unjustified consolidation or bundling (see 7.107) (15 U.S.C. 631(j) and 15 U.S.C. 657q).
(v) Ensuring that agency planners on information technology acquisitions comply with the capital planning and investment control requirements in 40 U.S.C. 11312 and OMB Circular A-130.
(w) Ensuring that agency planners on information technology acquisitions comply with the information technology security requirements in the Federal Information Security Management Act (44 U.S.C. 3544), OMB's implementing policies including Appendix III of OMB Circular A-130, and guidance and standards from the Department of Commerce's National Institute of Standards and Technology.
(x) Ensuring that agency planners use project labor agreements when required (see subpart 22.5 and 36.104).
(y) Ensuring that contracting officers consult the Disaster Response Registry via https://www.sam.gov, Search Records, Advanced Search, Disaster Response Registry Search as a part of acquisition planning for debris removal, distribution of supplies, reconstruction, and other disaster or emergency relief activities inside the United States and outlying areas. (See 26.205).
Overhaul text: Agency-head responsibilities.
(a) The agency head must establish agency acquisition planning criteria and thresholds for when increasingly greater detail and formality in the planning process is required. The agency procedures must—
(1) Create streamlined acquisition planning procedures for using Governmentwide acquisition contracts or multi-agency contracts for requirements that are not complex, including for orders, particularly for repetitive orders;
(2) Create streamlined acquisition planning procedures when an acquisition plan has been developed for a single indefinite delivery indefinite quantity contract to allow the resulting orders to be covered by and reference the same acquisition plan;
(3) Allow for acquisition planning at the program level that covers multiple procurement actions. Acquisition plans may be on a system basis, individual contract basis, or individual order basis depending on the acquisition;
(4) Consider streamlined acquisition planning procedures for procurements for commercial services and products, including COTS;
(5) Establish criteria for identifying high-risk contracts;
(6) Identify when design-to-cost and life-cycle-cost techniques will be used; and
(7) Provide procedures to waive planning requirements for acquisitions because of an urgent need.
(b) The agency head or designee are responsible for ensuring:
(1) Market research is conducted to define requirements and that the statement of work, statement of objectives, or performance work statement closely aligns with needed outcomes and cost estimates.
(2) The principles of this subpart are used, as appropriate, for all acquisitions, whether a written plan is required or not.
(3) Small business opportunities are considered in acquisitions to the maximum extent practicable (see 7.107 and part 19).
(4) No purchase request is started or contract entered into that would result in the performance of an inherently governmental function by a contractor, and that all contracts or orders are adequately managed to ensure effective official control over contract or order performance (see subpart 7.5).
(5) Effective agency responsiveness to disaster and emergencies using the authorities and flexibilities at parts 18 and 26.
(6) Information security and supply chain security requirements (see part 40) and information and communication technology (ICT) accessibility standards (see part 39) are considered, as appropriate.
(7) Before issuing a solicitation for advisory and assistance services for analyzing and evaluating solicitation proposals, a determination is made that there are insufficient covered personnel within the agency or from another Federal agency with the training and capability to do the analyzing and evaluating (see part 37).
(8) Agency planners on information technology acquisitions comply with the capital planning and investment control requirements in 40 U.S.C. 11312 and OMB Circular A-130.
(9) Acquisition plans and revisions to these plans are reviewed and approved to ensure compliance with FAR requirements.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 7.000 | Scope of part. | Scope of part. | Changed · 85% alike | 48 → 49 |
| 7.101 | Definitions. | Definitions. | Changed · 65% alike | 161 → 84 |
| 7.102 | Policy. | Requirements. | Changed · 50% alike | 231 → 278 |
| 7.103 | Agency-head responsibilities. | Agency-head responsibilities. | Changed · 17% alike | 1040 → 440 |
| 7.104 | General procedures. | General procedures. | Changed · 34% alike | 390 → 303 |
| 7.105 | Contents of written acquisition plans. | [Reserved] | Changed · 0% alike | 2381 → 0 |
| 7.106 | Additional requirements for major systems. | Additional requirements for major systems. | Changed · 95% alike | 311 → 306 |
| 7.107 | Additional requirements for acquisitions involving consolidation, bundling, or substantial bundling. | Additional requirements for acquisitions involving consolidation, bundling, or substantial bundling. | Same | 0 → 0 |
| 7.107-1 | General. | General. | Changed · 33% alike | 181 → 379 |
| 7.107-2 | Consolidation. | Policy. | Changed · 43% alike | 527 → 576 |
| 7.107-3 | Bundling. | Notifications. | Changed · 11% alike | 464 → 385 |
| 7.107-4 | Substantial bundling. | Solicitation provision. | Changed · 7% alike | 254 → 44 |
| 7.107-5 | Notifications. | none | Not in the overhaul | 564 → – |
| 7.107-6 | Solicitation provision. | none | Not in the overhaul | 47 → – |
| 7.108 | Additional requirements for telecommuting. | Additional requirements for teleworking. | Changed · 36% alike | 147 → 87 |
| 7.200 | Scope of subpart. | [Reserved] | Changed · 0% alike | 27 → 0 |
| 7.201 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 7.202 | Policy. | Policy. | Changed · 49% alike | 139 → 49 |
| 7.203 | Solicitation provision. | Solicitation provision. | Changed · 95% alike | 75 → 72 |
| 7.204 | Responsibilities of contracting officers. | none | Not in the overhaul | 183 → – |
| 7.300 | [Reserved] | none | Not in the overhaul | 0 → – |
| 7.301 | Definitions. | none | Not in the overhaul | 41 → – |
| 7.302 | Policy. | none | Not in the overhaul | 152 → – |
| 7.303-7.304 | [Reserved] | none | Not in the overhaul | 0 → – |
| 7.305 | Solicitation provisions and contract clause. | none | Not in the overhaul | 129 → – |
| 7.400 | Scope of subpart. | Scope of subpart. | Same | 59 → 59 |
| 7.401 | Acquisition considerations. | Acquisition considerations. | Changed · 97% alike | 360 → 360 |
| 7.402 | Acquisition methods. | Acquisition methods. | Changed · 74% alike | 211 → 182 |
| 7.403 | General Services Administration assistance and OMB guidance. | OMB guidance. | Changed · 53% alike | 193 → 103 |
| 7.404 | Contract clause. | Contract clause. | Changed · 94% alike | 34 → 30 |
| 7.500 | Scope of subpart. | Scope of subpart. | Same | 22 → 22 |
| 7.501 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 7.502 | Applicability. | Applicability. | Changed · 92% alike | 33 → 30 |
| 7.503 | Policy. | Policy. | Changed · 84% alike | 1132 → 984 |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress