The FAR overhaul, side by side

FAR Part 8: Required Sources of Supplies and Services

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 67 sections, 15,412 words (Part 8 as in force, eCFR as of Oct 29, 2026). Overhaul text: 23 sections, 2,165 words (on acquisition.gov ↗, issued Aug 14, 2025, updated Aug 29, 2025). By number: 0 the same, 7 changed, 60 not in the overhaul, 16 new.

8.405-6: Not in the overhaul

Today: Limiting sources.

This section in plain English

Orders placed or BPAs established under Federal Supply Schedules are exempt from the requirements in part 6. However, an ordering activity must justify its action when restricting consideration in accordance with paragraph (a) or (b) of this section—

(a) Orders or BPAs exceeding the micro-purchase threshold based on a limited sources justification—(1) Circumstances justifying limiting the source. (i) For a proposed order or BPA with an estimated value exceeding the micro-purchase threshold not placed or established in accordance with the procedures in 8.405-1, 8.405-2, or 8.405-3, the only circumstances that may justify the action are—

(A) An urgent and compelling need exists, and following the procedures would result in unacceptable delays;

(B) Only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized; or

(C) In the interest of economy and efficiency, the new work is a logical follow-on to an original Federal Supply Schedule order provided that the original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures. The original order or BPA must not have been previously issued under sole-source or limited-sources procedures.

(ii) See 8.405-6(c) for the content of the justification for an order or BPA exceeding the simplified acquisition threshold.

(2) Posting. (i) Within 14 days after placing an order or establishing a BPA exceeding the simplified acquisition threshold that is supported by a limited-sources justification permitted under any of the circumstances under paragraph (a)(1) of this section, the ordering activity shall—

(A) Publish a notice in accordance with 5.301; and

(B) Post the justification—

(1) At the GPE https://www.sam.gov

(2) On the Web site of the ordering activity agency, which may provide access to the justification by linking to the GPE; and

(3) For a minimum of 30 days.

(ii) In the case of an order or BPA permitted under paragraph (a)(1)(i)(A) of this section, the justification shall be posted within 30 days after award.

(iii) Contracting officers shall carefully screen all justifications for contractor proprietary data and remove all such data, and such references and citations as are necessary to protect the proprietary data, before making the justifications available for public inspection. Contracting officers shall also be guided by the exemptions to disclosure of information contained in the Freedom of Information Act (5 U.S.C. 552) and the prohibitions against disclosure in 24.202 in determining whether other data should be removed. Although the submitter notice process set out in Executive Order 12600 “Predisclosure Notification Procedures for Confidential Commercial Information” does not apply, if the justification appears to contain proprietary data, the contracting officer should provide the contractor that submitted the information an opportunity to review the justification for proprietary data before making the justification available for public inspection, redacted as necessary. This process must not prevent or delay the posting of the justification in accordance with the timeframes required in paragraphs (a)(2)(i) and (ii) of this section.

(iv) This posting requirement does not apply when disclosure would compromise the national security (e.g., would result in disclosure of classified information) or create other security risks.

(b) Items peculiar to one manufacturer. An item peculiar to one manufacturer can be a particular brand name, product, or a feature of a product, peculiar to one manufacturer. A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer.

(1) Brand name specifications shall not be used unless the particular brand name, product, or feature is essential to the Government's requirements, and market research indicates other companies' similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet, the agency's needs.

(2) Documentation. (i) For proposed orders or BPAs with an estimated value exceeding the micro-purchase threshold, but not exceeding the simplified acquisition threshold, the ordering activity contracting officer shall document the basis for restricting consideration to an item peculiar to one manufacturer.

(ii) For proposed orders or BPAs with an estimated value exceeding the simplified acquisition threshold, see paragraph (c) of this section.

(iii) The documentation or justification must be completed and approved at the time the requirement for a brand-name item is determined. In addition, the justification for a brand-name item is required at the order level when a justification for the brand-name item was not completed for the BPA or does not adequately cover the requirements in the order.

(3) Posting. (i) The ordering activity shall post the following information along with the Request for Quotation (RFQ) to eBuy (https://www.ebuy.gsa.gov):

(A) For proposed orders or BPAs with an estimated value exceeding $25,000, but not exceeding the simplified acquisition threshold, the documentation required by paragraph (b)(2)(i) of this section.

(B) For proposed orders or BPAs with an estimated value exceeding the simplified acquisition threshold, the justification required by paragraph (c) of this section.

(C) The documentation in paragraph (b)(2)(i) of this section and the justification in paragraph (c) of this section is subject to the screening requirement in paragraph (a)(2)(iii) of this section.

(ii) The posting requirement of paragraph (b)(3)(i) of this section does not apply when—

(A) Disclosure would compromise the national security (e.g., would result in disclosure of classified information) or create other security risks. The fact that access to classified matter may be necessary to submit a proposal or perform the contract does not, in itself, justify use of this exception;

(B) The nature of the file (e.g., size, format) does not make it cost-effective or practicable for contracting officers to provide access through eBuy; or

(C) The agency's senior procurement executive makes a written determination that access through e-Buy is not in the Government's interest.

(4) When applicable, the documentation and posting requirements in paragraphs (b)(2) and (3) of this section apply only to the portion of the order or BPA that requires a brand-name item. If the justification and approval is to cover only the portion of the acquisition which is brand-name, then it should so state; the approval level requirements will then only apply to that portion.

(c) An order or BPA with an estimated value exceeding the simplified acquisition threshold. (1) For a proposed order or BPA exceeding the simplified acquisition threshold, the requiring activity shall assist the ordering activity contracting officer in the preparation of the justification. The justification shall cite that the acquisition is conducted under the authority of the Multiple-Award Schedule Program (see 8.401).

(2) At a minimum, each justification shall include the following information:

(i) Identification of the agency and the contracting activity, and specific identification of the document as a “Limited-Sources Justification.”

(ii) Nature and/or description of the action being approved.

(iii) A description of the supplies or services required to meet the agency's needs (including the estimated value).

(iv) The authority and supporting rationale (see 8.405-6(a)(1)(i) and (b)(1)) and, if applicable, a demonstration of the proposed contractor's unique qualifications to provide the required supply or service.

(v) A determination by the ordering activity contracting officer that the order represents the best value consistent with 8.404(d).

(vi) A description of the market research conducted among schedule holders and the results or a statement of the reason market research was not conducted.

(vii) Any other facts supporting the justification.

(viii) A statement of the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services is made.

(ix) The ordering activity contracting officer's certification that the justification is accurate and complete to the best of the contracting officer's knowledge and belief.

(x) Evidence that any supporting data that is the responsibility of technical or requirements personnel (e.g., verifying the Government's minimum needs or requirements or other rationale for limited sources) and which form a basis for the justification have been certified as complete and accurate by the technical or requirements personnel.

(xi) For justifications under 8.405-6(a)(1), a written determination by the approving official identifying the circumstance that applies.

(d) Justification approvals. (1) For a proposed order or BPA with an estimated value exceeding the simplified acquisition threshold, but not exceeding $900,000, the ordering activity contracting officer's certification that the justification is accurate and complete to the best of the ordering activity contracting officer's knowledge and belief will serve as approval, unless a higher approval level is established in accordance with agency procedures.

(2) For a proposed order or BPA with an estimated value exceeding $900,000, but not exceeding $20 million, the justification must be approved by the advocate for competition of the activity placing the order, or by an official named in paragraph (d)(3) or (4) of this section. This authority is not delegable.

(3) For a proposed order or BPA with an estimated value exceeding $20 million, but not exceeding $90 million (or, for DoD, NASA, and the Coast Guard, not exceeding $150 million), the justification must be approved by—

(i) The head of the procuring activity placing the order;

(ii) A designee who—

(A) If a member of the armed forces, is a general or flag officer; or

(B) If a civilian, is serving in a position in a grade above GS-15 under the General Schedule (or in a comparable or higher position under another schedule); or

(iii) An official named in paragraph (d)(4) of this section.

(4) For a proposed order or BPA with an estimated value exceeding $90 million (or, for DoD, NASA, and the Coast Guard, over $150 million), the justification must be approved by the senior procurement executive of the agency placing the order. This authority is not delegable, except in the case of the Under Secretary of Defense for Acquisition and Sustainment, acting as the senior procurement executive for the Department of Defense.

Overhaul text

No section with this number.

Section by section

SectionTodayOverhaul textStatusWords
8.000Scope of part.Scope.Changed · 90% alike15 → 14
8.001General.Definitions.Changed · 7% alike32 → 194
8.002Priorities for use of mandatory Government sources.noneNot in the overhaul240 → –
8.003Use of other mandatory sources.noneNot in the overhaul79 → –
8.004Use of other sources.noneNot in the overhaul196 → –
8.005Contract clause.noneNot in the overhaul76 → –
8.101[Reserved]Mandatory sources for specific supplies and services.Changed · 0% alike0 → 55
8.102Policy.Mandatory source for services.Changed · 7% alike50 → 62
8.103Information on available excess personal property.Mandatory sources of supplies.Changed · 11% alike37 → 75
8.104Obtaining nonreportable property.Use of existing contracts.Changed · 5% alike48 → 230
8.105noneContractor use of Government supply sources.New number– → 16
8.105-1noneContractor required use of Government supply sources.New number– → 117
8.105-2noneContractor permitted use of Government supply sources.New number– → 290
8.105-3noneContractor use of GSA Fleet.New number– → 133
8.201noneGeneral.New number– → 40
8.202nonePresolicitation.New number– → 101
8.203noneEvaluation and award.New number– → 30
8.204nonePostaward.New number– → 35
8.301noneGeneral.New number– → 24
8.302noneExclusion.New number– → 85
8.303nonePresolicitation.New number– → 135
8.304noneSolicitation.New number– → 236
8.305noneEvaluation and award.New number– → 53
8.306nonePostaward.New number– → 30
8.401Definitions.General.Changed · 5% alike179 → 108
8.402General.noneNot in the overhaul864 → –
8.403Applicability.noneNot in the overhaul128 → –
8.404Use of Federal Supply Schedules.noneNot in the overhaul1176 → –
8.405Ordering procedures for Federal Supply Schedules.noneNot in the overhaul42 → –
8.405-1Ordering procedures for supplies, and services not requiring a statement of work.noneNot in the overhaul668 → –
8.405-2Ordering procedures for services requiring a statement of work.noneNot in the overhaul854 → –
8.405-3Blanket purchase agreements (BPAs).noneNot in the overhaul2382 → –
8.405-4Price reductions.noneNot in the overhaul72 → –
8.405-5Small business.noneNot in the overhaul320 → –
8.405-6Limiting sources.noneNot in the overhaul1694 → –
8.405-7Payment.noneNot in the overhaul25 → –
8.406Ordering activity responsibilities.noneNot in the overhaul0 → –
8.406-1Order placement.noneNot in the overhaul271 → –
8.406-2Inspection and acceptance.noneNot in the overhaul233 → –
8.406-3Remedies for nonconformance.noneNot in the overhaul95 → –
8.406-4Termination for cause.noneNot in the overhaul475 → –
8.406-5Termination for the Government's convenience.noneNot in the overhaul82 → –
8.406-6Disputes.noneNot in the overhaul177 → –
8.406-7Contractor Performance Evaluation.noneNot in the overhaul38 → –
8.501noneGeneral.New number– → 23
8.502nonePolicy.New number– → 79
8.601General.noneNot in the overhaul122 → –
8.602Policy.noneNot in the overhaul635 → –
8.603Purchase priorities.noneNot in the overhaul81 → –
8.604Waivers.noneNot in the overhaul81 → –
8.605Exceptions.noneNot in the overhaul124 → –
8.606Evaluating FPI performance.noneNot in the overhaul36 → –
8.607Performance as a subcontractor.noneNot in the overhaul82 → –
8.608Protection of classified and sensitive information.noneNot in the overhaul87 → –
8.700Scope of subpart.noneNot in the overhaul51 → –
8.701Definitions.noneNot in the overhaul245 → –
8.702General.noneNot in the overhaul61 → –
8.703Procurement List.noneNot in the overhaul165 → –
8.704Purchase priorities.noneNot in the overhaul158 → –
8.705Procedures.noneNot in the overhaul0 → –
8.705-1General.noneNot in the overhaul106 → –
8.705-2Direct-order process.noneNot in the overhaul68 → –
8.705-3Allocation process.noneNot in the overhaul283 → –
8.705-4Compliance with orders.noneNot in the overhaul248 → –
8.706Purchase exceptions.noneNot in the overhaul175 → –
8.707Prices.noneNot in the overhaul218 → –
8.708Shipping.noneNot in the overhaul133 → –
8.709Payments.noneNot in the overhaul28 → –
8.710Quality of merchandise.noneNot in the overhaul55 → –
8.711Quality complaints.noneNot in the overhaul105 → –
8.712Specification changes.noneNot in the overhaul229 → –
8.713Optional acquisition of supplies and services.noneNot in the overhaul58 → –
8.714Communications with the central nonprofit agencies and the Committee.noneNot in the overhaul65 → –
8.715Replacement commodities.noneNot in the overhaul93 → –
8.716Change-of-name and successor in interest procedures.noneNot in the overhaul103 → –
8.800Scope of subpart.noneNot in the overhaul13 → –
8.801Definitions.noneNot in the overhaul44 → –
8.802Policy.noneNot in the overhaul285 → –
8.1100Scope of subpart.noneNot in the overhaul45 → –
8.1101Definitions.noneNot in the overhaul72 → –
8.1102Presolicitation requirements.noneNot in the overhaul233 → –
8.1103Contract requirements.noneNot in the overhaul130 → –
8.1104Contract clauses.noneNot in the overhaul147 → –