Industry · NAICS 336414
Guided Missile and Space Vehicle Manufacturing
Open notices · Coming up for re-bid · Who wins this work · Typical award sizes
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
Agencies buying it, FY2025
Offices buying the most, FY2025
- W6QK Acc-Rsa $12.98B
- Dcma Missiles $6.91B
- Fa8682 Aflcmc Ebjk $3.16B
- Naval Air Systems Command $1.94B
- Fa8219 Afnwc PZBG $1.27B
- Navsea HQ $1.06B
- Nasa Marshall Space Flight Center $982.40M
- Nasa Kennedy Space Center $926.16M
Companies winning it, FY2025
- Lockheed Martin Corp $15.80B
- RTX Corp $10.49B
- Northrop Grumman Corp $2.28B
- Boeing Co $1.35B
- Space Exploration Technologies Corp $1.33B
- Ram-System GMBH $437.32M
- Leidos Holdings, Inc. $381.78M
- Bae Systems PLC $325.17M
- L3Harris Technologies, Inc. $135.38M
- Axiom Space Inc $130.50M
Where the work is, FY2025
- Arizona $9.90B
- Texas $9.56B
- Florida $6.07B
- Alabama $2.25B
- Colorado $1.28B
- Utah $1.27B
- California $866.57M
- Massachusetts $632.94M
Contracts ending in the next 12 months
108 contracts, $22.21B with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| N0001924F0116 FRP-12+ WGU-59A/B GUIDANCE SECTIONS | Bae Systems Information & Electronic Systems Integration Inc | 2026-10-31 | $430.36M |
| 80GSFC20C0059 THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S COMPETITIVELY SELECTED DAVINCI+ MISSION. | Lockheed Martin Corp | 2026-10-31 | $38.33M |
| FA868222F1031 JOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM) ITIK BUY 3 | Lockheed Martin Corporation | 2026-10-31 | $20.03M |
| HQ085125F0008 IIA - SUSTAINING ENGINEERING B&P | Raytheon Company | 2026-10-31 | $3.95M |
| 80GSFC20C0102 THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY. | Southwest Research Institute | 2026-11-05 | $24.07M |
| N0001925F0145 USG GUIDANCE UNIT (GU) 9X & 9X-2 REPAIRS | Raytheon Company | 2026-11-13 | $1.48M |
| W31P4Q26C0007 THE STRATEGIC AND OPERATIONAL ROCKETS AND MISSILES PROJECT OFFICE IN SUPPORT OF HIGH MOBILITY ARTILLERY ROCKET SYSTEM AND MULTIPLE LAUNCH ROCKET SYSTEM. | Lockheed Martin Corporation | 2026-11-14 | $48.96M |
| NNG04EB99C TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | Southwest Research Institute | 2026-11-15 | $391.93M |
| HQ085125F0002 IB FIXED COSTS - RECERT/REPAIR | Raytheon Company | 2026-11-20 | $20.54M |
| FA861224CB010 LOW-COST HIGHLY MANUFACTURABLE LONG-RANGE STRIKE WEAPON PRODUCTION SMALL BUSINESS INDEPENDENT RESEARCH (SBIR) PHASE III | Castelion Corporation | 2026-11-26 | $55.85M |
Open notices
- NASA Launch Services II (NLS-II) 2026 On-Ramp · Sources Sought · due 2026-10-05
- Rocket Systems Launch Program (RSLP) Innovative Delivery of Effects (RIDE) Supplemental Request for Information (RFI) – Industry Statements of Capability (SOCs) · Sources Sought · due 2026-10-09
- Contract Opportunity Network Enabled Weapons Trainer (NEWT) · Sources Sought · due 2026-11-09 · No Set aside used
- Evolved SEASPARROW Missile (ESSM) Next Significant Variant (NSV) Sources Sought · Sources Sought · due 2026-12-03 · No Set aside used
From USAspending.gov prime awards and SAM.gov notices. Sources and limits