Contracting office · 80MSFC
Nasa Marshall Space Flight Center
National Aeronautics and Space Administration
At a glance
- 314 active contracts, $41.87B
- 25% of its 367 competed contracts drew a single offer (last 3 years)
- Usually buys through: Single-award IDIQ
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (Except Nanotechnology and Biotechnology) $1.96B
- 336414 Guided Missile and Space Vehicle Manufacturing $982.40M
- 336415 Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing $494.77M
- 541712 Research and Development in the Physical, Engineering, and Life Sciences (Except Biotechnology) $353.34M
- 561210 Facilities Support Services $151.83M
- 541710 Research and Development in the Physical, Engineering, and Life Sciences $107.96M
- 541330 Engineering Services $43.92M
- 541219 Other Accounting Services $24.98M
Who it buys from, FY2025
- Boeing Co $1.17B
- Blue Origin Washington, LLC $778.38M
- The Johns Hopkins University Applied Physics Laboratory LLC $413.77M
- L3Harris Technologies, Inc. $314.40M
- Northrop Grumman Corp $293.98M
- Amentum Holdings, Inc. $276.11M
- Space Exploration Technologies Corp $220.54M
- Nova Space Solutions, LLC $90.62M
- Teledyne Technologies Inc $72.20M
- Smithsonian Institution $66.13M
Contracts ending in the next 12 months
94 contracts, $10.44B with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| NNM06AA75C THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HAS SELECTED JUNO NEW FRONTIERS MISSION UNDER THE DIRECTION OF PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON TO CONTINUE DEVELOPMENT WITH THE EXPECTATION THAT THE JUNO MISSION WILL ENTER PHASE B IN EARLY FISCAL YEAR 2006. THE JUNO MISSION WILL BE MANAGED BY THE MARSHALL SPACE FLIGHT CENTER, NEW FRONTIERS PROGRAM OFFICE. KEY JUNO TEAM MEMBERS INCLUDE DR. BOLTON'S HOME INSTITUTION, THE SOUTHWEST RESEARCH INSTITUTE (SWRI), THE JUNO IMPLEMENTATION TEAM LEADER JET PROPULSION LABORATORY (JPL) AND THE SPACECRAFT BUS PROVIDER THE LOCKHEED MARTIN SPACE SYSTEMS DIVISION (LM/SS). THE PI'S TEAM AT SWRI NEEDS TO BEGIN WORK ON A SUBSET OF PHASE B ACTIVITIES AS EARLY IN FY06 AS POSSIBLE. THIS SOW PROVIDES A LIST OF ACTIVITIES THAT ARE NECESSARY TO BEGIN WORK IN FY06 AND THEIR ASSOCIATED DELIVERABLES. THE JUNO MISSION IS A COLLABORATION BETWEEN SOUTHWEST RESEARCH INSTITUTE (SWRI), JPL, LOCKHEED MARTIN (LM), AND A COMPLEMENTARY TEAM OF UNIVERSITIES AND FIELD CENTERS. THE PRINCIPAL INVESTIGATOR, DR. SCOTT BOLTON, IS AT SOUTHWEST RESEARCH INSTITUTE (SWRI) AND IS RESPONSIBLE TO NASA FOR ALL ASPECTS OF THE MISSION INCLUDING ACHIEVING ALL SCIENTIFIC OBJECTIVES AND MISSION GOALS. JPL PROVIDES THE PROJECT MANAGER WHO OVERSEES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT AND WILL REPORT TO THE PI. PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON IS RESPONSIBLE TO NASA FOR MEETING THE SCIENTIFIC OBJECTIVES OF THE JUNO MISSION WITHIN COST AND SCHEDULE. AS PI, DR. BOLTON HAS DIRECT ACCOUNTABILITY TO THE NASA NEW FRONTIERS PROGRAM OFFICE FOR THE IMPLEMENTATION OF JUNO. ALL JUNO SCIENCE CO-IS, THE DEPUTY PI AND PROJECT SCIENTIST, THE SCIENCE INVESTIGATION OFFICE MANAGER, THE E/PO EFFORT, THE JUNO ADVISORY BOARD AND THE PM REPORT DIRECTLY TO DR. BOLTON. THE PI DELEGATES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT TO THE PROJECT MANAGER (PM), RICK GRAMMIER. THE PROJECT SYSTEM ENGINEER, PAYLOAD MANAGER, FLIGHT SYSTEM MANAGER, MISSION MANAGER, SCIENCE OPS CENTER, BUSINESS MANAGER, LM CONTRACT CTM, AND MISSION ASSURANCE MANAGER ALL REPORT DIRECTLY TO THE PM. | Southwest Research Institute | 2026-10-15 | $184.27M |
| 80MSFC24CA015 TECHNOLOGY MATURATION FOR ASTROPHYSICS SPACE TELESCOPES (TECHMAST) | Lockheed Martin Corporation | 2026-10-19 | $4.76M |
| 80MSFC24CA013 ULTRA-STABLE TELESCOPE RESEARCH AND ANALYSIS - CRITICAL TECHNOLOGIES (ULTRA-CT) | Bae Systems Space & Mission Systems Inc. | 2026-10-23 | $8.55M |
| 80MSFC20F0056 THE AEROSPACE CORPORATION WILL PROVIDE SUPPORT TO THE SPACE LAUNCH SYSTEM (SLS) SYSTEMS ENGINEERING AND INTEGRATION OFFICE (SEIO) | The Aerospace Corporation | 2026-10-23 | $2.83M |
| 80MSFC24F0106 NEW TASK ORDER FOR SUPPORT TO EV70 SYSTEMS ENGINEERING AND INTEGRATION DIVISION MOON TO MARS (M2M) ANALYSIS INTEGRATION | The Aerospace Corporation | 2026-10-23 | $1.27M |
| 80MSFC24CA018 THE PURPOSE OF THIS EFFORT IS THE DESIGN, MANUFACTURING, AND DEVELOPMENT TESTING FOR LOW LEAKAGE VALVES CONCEPTS USED TO PRIMARILY SERVICE LIQUID HYDROGEN IN-SPACE APPLICATIONS. THESE IN-SPACE APPLICATIONS INCLUDE ENVISIONED DEEP SPACE TRANSPORTATION | Sierra Space Corp | 2026-10-25 | $3.03M |
| 80MSFC20C0015 THE CONTRACTOR SHALL CAPTURE INSTRUMENT REQUIREMENTS IN A PRELIMINARY INSTRUMENT FUNCTIONAL REQUIREMENTS DOCUMENT, INITIATE LONG-LEAD MATERIALS PROCUREMENT AND HOLD A HERITAGE REQUIREMENTS REVIEW. | Planetary Science Institute | 2026-10-31 | $5.37M |
| 80MSFC25F7004 EHP INTEGRATED TESTING AND COMMUNICATIONS ENGINEERING | The Johns Hopkins University Applied Physics Laboratory LLC | 2026-10-31 | $1.48M |
| 80MSFC23F0085 MSFC BUILDING 4651 AIR STRIPPER. | Civil Works Contracting LLC | 2026-11-02 | $7.86M |
| 80MSFC22F0109 INDEPENDENT VALIDATION AND VERIFICATION (IV&V) ENGINEERING SERVICES | 4M Research, Inc | 2026-11-14 | $9.87M |
Open notices
- Brand Name or Equal to Wisconsin Oven Electrically Heated Batch Walk-In Series Oven, a Model Batch-8/16/8-E10/RM · Sources Sought · due 2026-10-14
- Tugboat Services and Support, Vessel Technical Assessment, and Shipyard Maintenance, Operations, and Support · Sources Sought · due 2026-10-30 · No Set aside used
- AFP for Lease of Discovery Park at Michoud Assembly Facility · Solicitation · due 2026-11-23 · No Set aside used
- TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Freeze-Resistant Hydration System (MSC-TOPS-21) · Special Notice · due 2027-02-27
- TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Space Suit RoboGlove (SSRG) (MSC-TOPS-80) · Special Notice · due 2027-02-27
- TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Upper Body Robotic Exoskeleton (MSC-TOPS-85) · Special Notice · due 2027-02-27
- TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Pressure Sensor Mechanism (MSC-TOPS-56) · Special Notice · due 2027-02-27
- TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Agile RFID Antenna System (MSC-TOPS-79) · Special Notice · due 2027-02-27
From USAspending.gov prime awards and SAM.gov notices. Sources and limits