Contracting office · SPRTA1
Dla Aviation at Oklahoma City, Ok
Defense Logistics Agency · Department of Defense
At a glance
- 1,206 active contracts, $3.96B
- 55% of its 353 competed contracts drew a single offer (last 3 years)
- Usually buys through: Single-award IDIQ
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
What it buys, FY2025
- 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing $705.48M
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing $485.19M
- 336412 Aircraft Engine and Engine Parts Manufacturing $384.07M
- 336411 Aircraft Manufacturing $29.63M
- 332510 Hardware Manufacturing $24.20M
- 333999 All Other Miscellaneous General Purpose Machinery Manufacturing $23.03M
- 332722 Bolt, Nut, Screw, Rivet, and Washer Manufacturing $11.04M
- 332991 Ball and Roller Bearing Manufacturing $628.0K
Who it buys from, FY2025
- Boeing Co $705.95M
- RTX Corp $332.42M
- General Electric Co $185.93M
- CFM International, Inc. $123.03M
- Lockheed Martin Corp $61.73M
- Rockmart Fuel Containment, LLC $42.61M
- Acmt, Inc. $31.65M
- Honeywell International Inc $22.86M
- Thomas Instrument, Incorporated $21.90M
- Transaero, Inc. $15.73M
Contracts ending in the next 12 months
131 contracts, $785.90M with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| SPRTA124C0063 MANIFOLD ASSEMBLY | Pti Technologies Inc. | 2026-10-30 | $1.75M |
| SPRTA126C0006 SERVOVALVE, HYDRAULIC | Thomas Instrument, Incorporated | 2026-10-30 | $1.26M |
| SPRTA125C1809 LINER,AUGMENTOR COM AWARD | Acmt, Inc. | 2026-10-30 | $1.23M |
| SPRTA124F0040 NEW MANUFACTURED MATERIAL APPLICABLE TO THE F-100 ENGINE. | RTX Corporation | 2026-10-31 | $43.40M |
| SPRTA124F0060 PACER EDGE 2B: PACER EDGE ADDITIVE MANUFACTURING CAPABILITY AND CAPACITY DEVELOPMENT | General Electric Company | 2026-10-31 | $6.30M |
| SPRTA123C0071 AIR FORCE BUY FOR SPRAYBAR,PILOT AFTE FOR THE J85 | Collins Engine Nozzles, Inc | 2026-11-01 | $3.96M |
| SPRTA125C0074 FLUID FILTER | Eaton Corporation | 2026-11-01 | $1.29M |
| SPRTA126F0217 B-1 REPAIR DELIVERY ORDER | Northrop Grumman Systems Corporation | 2026-11-09 | $1.34M |
| SPRTA124F0331 NEW MANUFACTURED MATERIAL APPLICABLE TO F108 ENGINES | CFM International Inc | 2026-11-30 | $8.18M |
| SPRTA117C0041 PANEL, CONTROL, ELECT | Northrop Grumman Systems Corporation | 2026-11-30 | $7.15M |
Open notices
- New Manufacture of LINKAGE ASSEMBLY /1680010732187RK /16C0101-811 · Solicitation · due 2026-10-05 · No Set aside used
- F110 VALVE ASSEMBLY, NSN: 2995-01-390-3690PR, PN: 1584M19P02 · Solicitation · due 2026-10-05
- F110 VALVE ASSEMBLY, NSN: 2995-01-390-3690PR, PN: 1584M19P02 · Presolicitation · due 2026-10-05
- AUFMENTER FUEL CONTROL_End_Item_F101_NSN_2915011482108JF_PN_7113M62G01-2 · Sources Sought · due 2026-10-06 · No Set aside used
- VALVE ASSEMBLY,MANI_End_Item_F101_NSN_4810011438543JF_PN_721599D · Sources Sought · due 2026-10-06
- CENTRIFUGAL PUMP_End_Item_B-2_NSN_4320013741237FW_PN_U541639 · Sources Sought · due 2026-10-07
- F-100 Bearing, Ball, Annula · Solicitation · due 2026-10-08 · No Set aside used
- TORQUE TUBE ASSEMBLY · Solicitation · due 2026-10-08 · No Set aside used
From USAspending.gov prime awards and SAM.gov notices. Sources and limits