Small Business Innovation Research · Small Business Technology Transfer
Ues Inc: SBIR & STTR awards
39 awards worth $9.21M to 1 companies since 1983 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Ues Inc's federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2018 | 0 | 1 | $1.00M |
| 2017 | 1 | 0 | $150.0K |
| 2015 | 0 | 1 | $849.9K |
| 2014 | 1 | 1 | $996.1K |
| 2011 | 0 | 1 | $750.0K |
| 2010 | 4 | 0 | $399.9K |
| 2009 | 1 | 0 | $100.0K |
| 2008 | 1 | 0 | $99.9K |
| 2007 | 0 | 1 | $749.9K |
| 2006 | 2 | 0 | $199.6K |
| 2003 | 2 | 1 | $849.8K |
| 2002 | 1 | 0 | $100.0K |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| Joining of Ceramic Composites for Nuclear Applications (18-RD-986) · topic 10b | Ues Inc · Ohio | Department of Energy | SBIR Phase II | $1.00M | 2018-05-21 |
| Joining of Ceramic Composites for Nuclear Applications · topic 10b | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $150.0K | 2017-02-21 |
| Durable High Temperature Coatings For Utility Scale Gas Turbine Hot Gas Path Components · topic 14c | Ues Inc · Ohio | Department of Energy | STTR Phase II | $849.9K | 2015-04-06 |
| High Temperature Unique Low Thermal Conductivity Thermal Barrier Coating (TBC) Architectures · topic 27c | Ues Inc · Ohio | Department of Energy | STTR Phase II | $846.1K | 2014-07-28 |
| Durable High Temperature Coatings for Utility Scale Gas Turbine Hot Gas Path Components · topic 14c | Ues Inc · Ohio | Department of Energy | STTR Phase I | $150.0K | 2014-02-18 |
| High Temperature Unique Low Thermal Conductivity Thermal Barrier Coating (TBC) Architectures · topic 27 c | Ues Inc · Ohio | Department of Energy | STTR Phase II | $750.0K | 2011-08-15 |
| Improved Current Feeders and Current Distribution System for Accelerator Magnets Using High-Temperature Superconductors · topic 62 b | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $100.0K | 2010 |
| Novel YBCO Coated Filaments for Superconducting Magnets · topic 66 c | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $100.0K | 2010 |
| Membrane Materials with Improved Properties · topic 10 a | Ues Inc · Ohio | Department of Energy | STTR Phase I | $100.0K | 2010 |
| High Temperature Unique Low Thermal Conductivity Thermal Barrier Coating (TBC) Architectures · topic 27 c | Ues Inc · Ohio | Department of Energy | STTR Phase I | $99.9K | 2010 |
| YBCO Fibers from Solution Approach - A New Concept · topic 55 c | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $100.0K | 2009 |
| AC Loss Reduction in Coated Conductors · topic 30 a | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $99.9K | 2008 |
| In-Situ Functionally Graded Oxide Matrix Composite for Gas Turbine Applications · topic 28 | Ues Inc · Ohio | Department of Energy | SBIR Phase II | $749.9K | 2007 |
| In-Situ Functionally Graded Oxide Matrix Composite for Gas Turbine Applications · topic 28 | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $99.9K | 2006 |
| High Performance, Simplified, Low-Cost Buffer Layer for Coated Conductor · topic 03 | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $99.7K | 2006 |
| Development of Ion Beam Techniques for Layer Splitting of Oxide Materials | Ues Inc · Ohio | Department of Energy | SBIR Phase II | $749.9K | 2003 |
| Development of Protective Coatings for Single-Crystal Turbine Blades | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $99.9K | 2003 |
| Development of Ion Beam Techniques for Layer Splitting of Oxide Materials | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $0 | 2003 |
| Development of Ion Beam Techniques for Layer Splitting of Oxide Materials | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $100.0K | 2002 |
| Pixel-Cell Neutron Detector and Read-Out System Meeting Requirements of Present and Future Neutron Scattering Facilities | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $100.0K | 2001 |
| Not Available | Ues Inc · Ohio | Department of Energy | SBIR Phase II | $749.9K | 2000 |
| Not Available | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $0 | 2000 |
| Not Available | Ues Inc · Ohio | Department of Energy | SBIR Phase II | $749.8K | 1999 |
| Large Area Filtered Arc Deposition of Carbon and Boron Based Hard Coatings | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $99.8K | 1999 |
| Hard, Wear Resistant Coatings for Die-Casting Dies by and Advanced Filtered Cathodic Arc Deposition Process | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $75.0K | 1998 |
| Development of Long-length Fabrication Technology for High Tc Superconductors Operation in High Magnetic Fields at 77k | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $75.0K | 1997 |
| SURFACE HARDENING OF POLYMERIC COMPOSITES BY HIGH ENERGY ION IRRADIATION | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $74.8K | 1994 |
| STRENGTH, RELIABILITY AND SURFACE HARDNESS IMPROVEMENT OF STRUCTURAL CERAMICS THROUGH ION IMPLANTATIONS | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $50.0K | 1990 |
| CLOSED-LOOP FIGURING OF MIRRORS | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $50.0K | 1988 |
| THYRISTORS CREATED FROM HIGH PURITY FLOAT-ZONE SILICON FOR OPERATION AT GREATER THAN 5000 VOLTS | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $50.0K | 1988 |
| LOW COST HIGH RESISTIVITY FLOAT-ZONE SILICON DIODES | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $50.0K | 1988 |
| SYNTHESIS OF INORGANIC FILMS BY ION BEAM IRRADIATION OF ORGANOSILICON POLYMER FILMS | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $49.9K | 1987 |
| RESISTANCE | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $50.0K | 1986 |
| OF FIRST WALL MATERIALS | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $48.7K | 1985 |
| THE DOPING EFFICIENCY OF BORON IN SILICON SOLAR CELLS IS LIMITED BY THE PRESENCE OF OXYGEN WHICH FORMS A COMPLEX WITH BORON. | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $48.7K | 1985 |
| INDUSTRIAL APPLICATIONS USING HIGH ENERGY ION BEAM MIXING | Ues Inc · Ohio | Department of Energy | SBIR Phase II | $495.0K | 1984 |
| CAPABILITY | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $50.0K | 1984 |
| INDUSTRIAL APPLICATIONS USING HIGH ENERGY ION BEAM MIXING | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $50.0K | 1983 |
| DEVELOPMENT OF HOT CORROSION RESISTANT ALLOYS USING ION BEAMPROCESSING | Ues Inc · Ohio | Department of Energy | SBIR Phase I | $50.0K | 1983 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.