Small Business Innovation Research · Small Business Technology Transfer
Ler Technologies Inc: SBIR & STTR awards
10 awards worth $4.44M to 1 companies since 2003 match these filters. Phase I tests an idea (usually a few hundred thousand dollars); Phase II builds it (often $1M or more).
Ler Technologies Inc's federal contracts and grants · All SBIR & STTR awards
Awards by year
| Year | Phase I | Phase II | Amount |
|---|---|---|---|
| 2022 | 0 | 1 | $1.15M |
| 2021 | 1 | 1 | $861.4K |
| 2019 | 1 | 1 | $1.15M |
| 2018 | 2 | 0 | $274.9K |
| 2014 | 0 | 1 | $749.9K |
| 2013 | 1 | 0 | $149.9K |
| 2003 | 1 | 0 | $100.0K |
The latest year fills in over months: agencies report awards to SBIR.gov with a lag.
By agency
- Department of Energy 3 awards · $2.30M
- Department of Defense 3 awards · $1.01M
- National Science Foundation 3 awards · $999.8K
- National Aeronautics and Space Administration 1 awards · $125.0K
Latest matching awards
| Award | Company | Agency | Phase | Amount | Date |
|---|---|---|---|---|---|
| REAL TIME NON-DESTRUCTIVE EVALUATION DURING 3D MANUFACTURING OF METAL PARTS · topic C46-30g | Ler Technologies Inc · California | Department of Energy | SBIR Phase II | $1.15M | 2022-08-22 |
| Automated Whole Body OML (Outer Mold Line) Defect Assessment · topic AF183-040 | Ler Technologies Inc · California | Department of Defense · Air Force | SBIR Phase II | $750.0K | 2021-05-07 |
| CdZnTe Substrate Screening · topic A20-123 | Ler Technologies Inc · California | Department of Defense · Army | SBIR Phase I | $111.4K | 2020-11-02 |
| Real Time Non-Destructive Evaluation during 3D Manufacturing of Metal Parts · topic 30g | Ler Technologies Inc · California | Department of Energy | SBIR Phase II | $1000.0K | 2019-08-19 |
| Automated Whole Body OML (Outer Mold Line) Defect Assessment · topic AF183-040 | Ler Technologies Inc · California | Department of Defense · Air Force | SBIR Phase I | $150.0K | 2019-04-11 |
| In-Situ Monitoring of In-Space Manufacturing by Multi-Parameter Imaging · topic H7 | Ler Technologies Inc · California | National Aeronautics and Space Administration | SBIR Phase I | $125.0K | 2018-07-27 |
| Real Time Non-Destructive Evaluation during 3D Manufacturing of Metal Parts · topic 30g | Ler Technologies Inc · California | Department of Energy | SBIR Phase I | $150.0K | 2018-07-02 |
| SBIR Phase II: Defect Mapping Instrument for Optimizing Wafer Manufacturing Process · topic NM | Ler Technologies Inc · California | National Science Foundation | SBIR Phase II | $749.9K | 2014-08-01 |
| SBIR Phase I: Defect Mapping Instrument for Optimizing Wafer Manufacturing Process · topic NM | Ler Technologies Inc · California | National Science Foundation | SBIR Phase I | $149.9K | 2013-07-01 |
| SBIR Phase I: Electro-Optic Sensor for Real-Time Defect Detection During Integrated Circuits (IC) and Microelectromechanical Systems (MEMS) Wafer Growth | Ler Technologies Inc · California | National Science Foundation | SBIR Phase I | $100.0K | 2003 |
Source: SBIR.gov award data (SBA) ↗, awards through 2026-08-28. Amounts are as agencies report them to SBA. SBIR/STTR contracts also appear in USAspending as ordinary awards; grants (NIH, NSF, DOE) appear as assistance. Open topics are posted by each agency; see Opportunities for contract notices.