| CA-2026-118↗ | Department of Transportation | LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY | FORMULA GRANT (A) | 2026-08-10 | 2026-08-10 | 1 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO SUPPORT LA METROS REMAINING FY26 AND FY27 PREVENTIVE MAINTENANCE ACTIVITIES APPLIED TO RAIL VEHICLES FACILITIES AND SYSTEMS INCLUDING LIGHT RAIL AND HEAVY RAIL WAYSIDE MAINTENANCE MAINTENANCE SUPPORT NON-REVENUE VEHICLES MAINTENANCE AND OTHER MAINTENANCE WITHIN LOS ANGELES COUNTY DURING THE PERIOD OF DECEMBER 1 2025 THROUGH JUNE 30 2027.; ACTIVITIES PERFORMED: FUNDS WILL BE USED FOR RAIL PM EQUIPMENT/MATERIALS/SUPPLIES (SUCH AS TRACTION MOTORS AUXILIARY POWER UNIT INVERTERS LUBRICATING BOXES NUT AND PIN ASSEMBLY SCREWS TRAVELING CAR NUTS ETC.) AND ACTIVITIES OF RAIL VEHICLES FACILITIES AND SYSTEMS INCLUDING LIGHT RAIL AND HEAVY RAIL WAYSIDE MAINTENANCE MAINTENANCE SUPPORT NON-REVENUE VEHICLES MAINTENANCE AND OTHER MAINTENANCE IN LOS ANGELES COUNTY DURING THE PERIOD OF DECEMBER 1 2025 THROUGH JUNE 30 2027.; EXPECTED OUTCOMES: FUNDING FOR RAIL PM ACTIVITIES IS CRITICAL TO ENSURE THE LA METRO RAIL SYSTEM INCLUDING VEHICLES AND FACILITIES IS MAINTAINED IN A STATE OF GOOD REPAIR SO THAT IT OPERATES SAFELY EFFICIENTLY RELIABLY AND SUSTAINABLY. THESE ACTIVITIES WILL ALSO SUSTAIN LOWER FLEET OPERATING COSTS LOWER EQUIPMENT OPERATING COSTS AND LOWER FACILITY OPERATING COSTS. THEY WILL ALSO REDUCE UNSCHEDULED REPAIRS.; INTENDED BENEFICIARIES: RAIL RIDERS INCLUDING SENIORS PERSONS WITH DISABILITIES LOW-INCOME AND TRANSIT DEPENDENT INDIVIDUALS AND THOSE WHO DO NOT HAVE ALTERNATIVE OPTIONS FOR ESSENTIAL TRIPS. THE ACTIVITIES UNDER THE RAIL PM PROGRAM ARE CRITICAL TO ENSURE THAT LA METROS RAIL VEHICLES ARE MAINTAINED IN A STATE OF GOOD REPAIR TO ENHANCE SAFETY AVAILABILITY RELIABILITY AND SYSTEM-WIDE COMPATIBILITY. IF LA METRO IS UNABLE TO PROVIDE PREVENTIVE MAINTENANCE SERVICES RAIL VEHICLES WILL BREAK DOWN AND SERVICE WILL BE SIGNIFICANTLY IMPACTED.; SUBRECIPIENT ACTIVITIES: NONE | $343.26M |
| CA-2026-104↗ | Department of Transportation | LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY | FORMULA GRANT (A) | 2026-07-31 | 2026-07-31 | 1 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO FULLY FUND ONE YEAR OF BUS PREVENTIVE MAINTENANCE FOR LACMTA TO ASSIST IT IN FIXED-ROUTE TRANSIT OPERATIONS DURING THE PERIOD OF 7/1/2025 TO 6/302026.; ACTIVITIES PERFORMED: FUNDS WILL BE USED TO COVER ELIGIBLE BUS PREVENTIVE MAINTENANCE ACTIVITIES FOR VEHICLES AND FACILITIES.; EXPECTED OUTCOMES: THE PREVENTIVE MAINTENANCE IS ESSENTIAL TO THE SAFE AND EFFICIENT OPERATIONS OF METROS VEHICLE FLEET. IT WILL REDUCE ACCIDENTS DOWNTIME AND MAINTENANCE COSTS AS WELL AS IMPROVE DRIVER MORALE AND PUBLIC RELATIONS.; INTENDED BENEFICIARIES: BUS AND RAIL RIDERS INCLUDING SENIORS PERSONS WITH DISABILITIES LOW-INCOME AND TRANSIT-DEPENDENT INDIVIDUALS AND THOSE WHO DO NOT HAVE ALTERNATIVE OPTIONS FOR ESSENTIAL TRIPS.; SUBRECIPIENT ACTIVITIES: LACMTA DOES NOT INTEND TO SUBAWARD FUNDS. | $283.44M |
| CA-2026-166↗ | Department of Transportation | LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY | PROJECT GRANT (B) | 2026-08-27 | 2026-08-27 | 1 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO FUND THE CONSTRUCTION OF THE VERMONT AVENUE BRT PROJECT. THE PROJECT WILL FUND THE DESIGN AND CONSTRUCTION OF A 12.4-MILE NORTH-SOUTH BUS RAPID TRANSIT (BRT) LINE ALONG VERMONT AVENUE RUNNING FROM SUNSET BOULEVARD IN THE NORTH TO 120TH STREET IN THE SOUTH. THE PROJECT WILL IMPROVE SPEED RELIABILITY AND ACCESS FOR OVER 36000 DAILY RIDERS CONNECTING DIVERSE COMMUNITIES TO JOBS SCHOOLS AND REGIONAL TRANSIT; ACTIVITIES PERFORMED: $149900000 IN SMALL STARTS FUNDS AND $98083655 IN LOCAL MATCH WILL BE USED FOR CONSTRUCTION AND PHASE 1 PRE-CONSTRUCTION SERVICES IN SUPPORT OF THE 12.4-MILE VERMONT AVENUE BRT PROJECT.; EXPECTED OUTCOMES: CONSTRUCTION OF A 12.4-MILE BRT CORRIDOR THAT WILL IMPROVE AIR QUALITY TRANSIT SPEED RELIABILITY AND PASSENGER CAPACITY ALONG ONE OF THE BUSIEST NORTH-SOUTH TRANSIT CORRIDORS IN LOS ANGELES.; INTENDED BENEFICIARIES: POPULACE OF THE LACMTA TRANSIT SERVICE AREA AND LOCAL AREA COMMUTERS.; SUBRECIPIENT ACTIVITIES: NONE. | $149.90M |
| CA-2026-216↗ | Department of Transportation | LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY | FORMULA GRANT (A) | 2026-09-22 | 2026-09-22 | 1 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO FUND THE CONSTRUCTION OF THE VERMONT AVENUE BRT PROJECT. THE PROJECT WILL FUND THE DESIGN AND CONSTRUCTION OF A 12.4-MILE NORTH-SOUTH BUS RAPID TRANSIT (BRT) LINE ALONG VERMONT AVENUE RUNNING FROM SUNSET BOULEVARD IN THE NORTH TO 120TH STREET IN THE SOUTH. THE PROJECT WILL IMPROVE SPEED RELIABILITY AND ACCESS FOR OVER 36000 DAILY RIDERS CONNECTING DIVERSE COMMUNITIES TO JOBS SCHOOLS AND REGIONAL TRANSIT; ACTIVITIES PERFORMED: $106339000 IN CMAQ FUNDS AND $13777345 IN LOCAL MATCH WILL BE USED FOR CONSTRUCTION AND PHASE 1 PRE-CONSTRUCTION SERVICES IN SUPPORT OF THE 12.4-MILE VERMONT AVENUE BRT PROJECT.; EXPECTED OUTCOMES: CONSTRUCTION OF A 12.4-MILE BRT CORRIDOR THAT WILL IMPROVE AIR QUALITY TRANSIT SPEED RELIABILITY AND PASSENGER CAPACITY ALONG ONE OF THE BUSIEST NORTH-SOUTH TRANSIT CORRIDORS IN LOS ANGELES.; INTENDED BENEFICIARIES: POPULACE OF THE LACMTA TRANSIT SERVICE AREA AND LOCAL AREA COMMUTERS.; SUBRECIPIENT ACTIVITIES: NONE. | $106.34M |
| CA-2026-022↗ | Department of Transportation | LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY | FORMULA GRANT (A) | 2026-03-04 | 2026-07-21 | 2 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO FULLY FUND ONE YEAR OF BUS PREVENTIVE MAINTENANCE FOR LACMTA TO ASSIST IT IN FIXED ROUTE TRANSIT OPERATIONS DURING THE PERIOD OF 7/1/2024 TO 6/302025.; ACTIVITIES PERFORMED: FUNDS WILL BE USED TO COVER ELIGIBLE BUS PREVENTIVE MAINTENANCE ACTIVITIES FOR VEHICLES.; EXPECTED OUTCOMES: THE PREVENTIVE MAINTENANCE IS ESSENTIAL TO THE SAFE AND EFFICIENT OPERATIONS OF METROS VEHICLE FLEET. IT WILL REDUCE ACCIDENTS DOWNTIME AND MAINTENANCE COSTS AS WELL AS IMPROVE DRIVER MORALE AND PUBLIC RELATIONS.; INTENDED BENEFICIARIES: BUS AND RAIL RIDERS INCLUDING SENIORS PERSONS WITH DISABILITIES LOW-INCOME AND TRANSIT-DEPENDENT INDIVIDUALS AND THOSE WHO DO NOT HAVE ALTERNATIVE OPTIONS FOR ESSENTIAL TRIPS.; SUBRECIPIENT ACTIVITIES: LACMTA DOES NOT INTEND TO SUBAWARD FUNDS. | $104.00M |
| CA-2026-141↗ | Department of Transportation | LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY | FORMULA GRANT (A) | 2026-08-17 | 2026-08-17 | 1 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE OPERATING ASSISTANCE TO ASSIST IN FIXED ROUTE HEAVY RAIL TRANSIT OPERATIONS FOR THE METRO D (PURPLE) LINE WESTSIDE EXTENSION PROJECT.; ACTIVITIES PERFORMED: FUNDS WILL BE USED TO COVER ALL ELIGIBLE OPERATING EXPENSES SUCH AS METRO LABOR INDIRECT EXPENSES CONTRACTS AND MATERIALS AND SUPPLIES.; EXPECTED OUTCOMES: THE METRO D (PURPLE) LINE WESTSIDE EXTENSION PROJECT EXTENDS THE D LINE FOR NINE MILES FROM THE CURRENT TERMINUS AT WILSHIRE/WESTERN TO THE WESTWOOD/VA HOSPITAL AND INCLUDES SEVEN NEW UNDERGROUND STATIONS. THE PROJECT WAS DESIGNED AND BUILT WITH THE HELP OF COMMUNITY INPUT AND LOCAL VOICES TO PROVIDE A FASTER MORE CONVENIENT AND RELIABLE WAY TO CONNECT TO SEVERAL MAJOR DESTINATIONS WITH STOPS NEAR THE LA BREA TAR PITS THE LOS ANGELES COUNTY MUSEUM OF ART BEVERLY HILLS AND THE CAMPUS OF THE UNIVERSITY OF CALIFORNIA LOS ANGELES. ALL STATIONS PROVIDE SAFE AND CONVENIENT CUSTOMER INTERFACES AND SITE CONNECTIVITY AND REFLECT METROS SYSTEMWIDE STATE-OF-THE-ART DESIGN STANDARD.; INTENDED BENEFICIARIES: BUS AND RAIL TRANSIT RIDERS INCLUDING SENIORS PERSONS WITH DISABILITIES LOW-INCOME TRANSIT-DEPENDENT INDIVIDUALS AND THOSE WHO DO NOT HAVE ALTERNATIVE OPTIONS FOR ESSENTIAL TRIPS.; SUBRECIPIENT ACTIVITIES: NONE | $92.00M |
| CA-2026-079↗ | Department of Transportation | LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY | FORMULA GRANT (A) | 2026-07-07 | 2026-07-07 | 1 | APPLICATION PURPOSE: THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) HEREBY SUBMITS THIS GRANT APPLICATION REQUESTING $68972000 OF FY2024 CMAQ FUNDS APPORTIONED TO THE LOS ANGELES LONG BEACH-ANAHEIM UZA (60020). THESE FUNDS ARE BEING REQUESTED FOR BUS REPLACEMENTS AND THE DESIGN/CONSTRUCTION OF CHARGING INFRASTRUCTURES.; ACTIVITIES PERFORMED: FUNDS WILL BE USED TO FUND LACMTAS ACQUISITION OF ZERO-EMISSION BUSES (ZEBS) AND DESIGN/ CONSTRUCTION OF DIVISION 7 ELECTRIC TRANSIT VEHICLE CHARGING INFRASTRUCTURE.; EXPECTED OUTCOMES: THESE PROJECTS ARE ESSENTIAL TO THE SAFE AND EFFICIENT OPERATIONS OF LACMTAS VEHICLE FLEET. IT WILL REDUCE ACCIDENTS DOWNTIME AND MAINTENANCE COSTS AS WELL AS IMPROVE DRIVER MORALE AND PUBLIC RELATIONS. THE PRIMARY BENEFITS FROM THE REPLACEMENT OF THE CNG BUSES WITH ZEBS AND ASSOCIATED CHARGING INFRASTRUCTURE ARE REDUCED ENERGY CONSUMPTION REDUCED HARMFUL EMISSIONS AND REDUCED DIRECT CARBON EMISSIONS. LACMTAS CONVERSION TO A ZEB FLEET WILL IMPROVE THE CONDITION OF ITS BUS SYSTEM IMPROVE THE RELIABILITY OF IMPORTANT ROUTES ENHANCE OVERALL ACCESS AND MOBILITY WITHIN CORRIDORS THAT SERVICE DISADVANTAGED COMMUNITIES AND ACCELERATE IMPLEMENTATION OF METROS TRANSITION TO BE 100% ZERO EMISSION. THE NEW ZEBS WILL REDUCE THE NUMBER OF ROAD CALLS AND ASSOCIATED REPAIR COSTS AS WELL INCONVENIENCE AND DELAYS FOR PATRONS DUE TO SERVICE INTERRUPTIONS. IT WILL ALSO IMPROVE VEHICLE EFFICIENCY AND WORKING CONDITIONS AND RETENTION FOR VEHICLE OPERATORS AND MECHANICS THROUGH IMPROVED RUN CUTTING USING ZEBS. THE PROJECT WILL ACCELERATE INNOVATION IN THE DEVELOPMENT OF ZEBS TRANSIT SERVICE ON A LARGE SCALE IN A LARGE URBAN BUS NETWORK CONTRIBUTING TO OVERALL SERVICE AND OPERATION ENHANCEMENT.; INTENDED BENEFICIARIES: BUS AND RAIL RIDERS INCLUDING SENIORS PERSONS WITH DISABILITIES LOW-INCOME AND TRANSIT DEPENDENT INDIVIDUALS AND THOSE WHO DO NOT HAVE ALTERNATIVE OPTIONS FOR ESSENTIAL TRIPS.; SUBRECIPIENT ACTIVITIES: NONE | $68.97M |
| CA-2026-099↗ | Department of Transportation | LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY | FORMULA GRANT (A) | 2026-07-31 | 2026-07-31 | 1 | APPLICATION PURPOSE: THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) HEREBY SUBMITS THIS GRANT APPLICATION REQUESTING $64749000 OF STBG AND CRP FUNDS APPORTIONED TO LOS ANGELES UZA (#60020). THESE FUNDS ARE BEING REQUESTED FOR BUS REPLACEMENTS DESIGN/CONSTRUCTION OF CHARGING INFRASTRUCTURE AND PROCUREMENT OF CHARGING EQUIPMENT.; ACTIVITIES PERFORMED: FUNDS WILL BE USED TO FUND LACMTAS ACQUISITION OF BUSES DESIGN/CONSTRUCTION OF METRO DIVISION 18 CHARGING INFRASTRUCTURE AND PROCUREMENT AND INSTALLATION OF CHARGING EQUIPMENT.; EXPECTED OUTCOMES: THIS PROJECT IS ESSENTIAL TO THE SAFE AND EFFICIENT OPERATIONS OF LACMTAS VEHICLE FLEET. IT WILL REDUCE ACCIDENTS DOWNTIME AND MAINTENANCE COSTS AS WELL AS IMPROVE DRIVER MORALE AND PUBLIC RELATIONS. LACMTAS PROJECT WILL IMPROVE THE CONDITION OF ITS BUS SYSTEM IMPROVE THE RELIABILITY OF IMPORTANT ROUTES ENHANCE OVERALL ACCESS AND MOBILITY. THIS PROJECT WILL REDUCE THE NUMBER OF ROAD CALLS AND ASSOCIATED REPAIR COSTS AS WELL INCONVENIENCE AND DELAYS FOR PATRONS DUE TO SERVICE INTERRUPTIONS. IT WILL ALSO IMPROVE VEHICLE EFFICIENCY AND WORKING CONDITIONS AND RETENTION FOR VEHICLE OPERATORS AND MECHANICS THROUGH IMPROVED RUN CUTTING. THE PROJECT WILL CONTRIBUTE TO OVERALL SERVICE AND OPERATION ENHANCEMENT.; INTENDED BENEFICIARIES: BUS AND RAIL RIDERS INCLUDING SENIORS PERSONS WITH DISABILITIES LOW-INCOME AND TRANSIT DEPENDENT INDIVIDUALS AND THOSE WHO DO NOT HAVE ALTERNATIVE OPTIONS FOR ESSENTIAL TRIPS.; SUBRECIPIENT ACTIVITIES: LACMTA DOES NOT INTEND TO SUBAWARD FUNDS. | $64.75M |