The FAR overhaul, side by side
FAR Part 30: Cost Accounting Standards Administration
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 30 sections, 8,190 words (Part 30 as in force, eCFR as of Oct 29, 2026). Overhaul text: 19 sections, 7,406 words (on acquisition.gov ↗, issued Aug 28, 2025). By number: 0 the same, 5 changed, 25 not in the overhaul (10 with the same heading under another number), 14 new.
30.604: Not in the overhaul
Today: Processing changes to disclosed or established cost accounting practices.
(a) Scope. This section applies to required, unilateral, and desirable changes in cost accounting practices.
(b) Procedures. Upon receipt of the contractor's notification and description of the change in cost accounting practice, the CFAO should review the proposed change concurrently for adequacy and compliance. The CFAO shall—
(1) If the description of the change is both adequate and compliant, notify the contractor in writing and—
(i) For required or unilateral changes (except those requested to be determined desirable changes), request the contractor submit a general dollar magnitude (GDM) proposal by a specified date, unless the CFAO determines the cost impact is immaterial; or
(ii) For unilateral changes that the contractor requests to be determined desirable changes, inform the contractor that the request shall include supporting rationale and—
(A) For any request based on the criteria in 30.603-2(b)(3)(ii), the data necessary to demonstrate the required cost savings; or
(B) For any request other than those based on the criteria in 30.603-2(b)(3)(ii), a GDM proposal and any other data necessary for the CFAO to determine if the change is a desirable change;
(2) If the description of the change is inadequate, request a revised description of the new cost accounting practice; and
(3) If the disclosed practice is noncompliant, notify the contractor in writing that, if implemented, the CFAO will determine the cost accounting practice to be noncompliant and process it accordingly.
(c) Evaluating requests for desirable changes. (1) When a contractor requests a unilateral change be determined a desirable change, the CFAO shall promptly evaluate the contractor's request and, as soon as practical, notify the contractor in writing whether the change is a desirable change or the request is denied.
(2) If the CFAO determines the change is a desirable change, the CFAO shall negotiate any cost or price adjustments that may be needed to resolve the cost impact (see 30.606).
(3) If the request is denied, the change is a unilateral change and shall be processed accordingly.
(d) General dollar magnitude proposal. The GDM proposal—
(1) Provides information to the CFAO on the estimated overall impact of a change in cost accounting practice on affected CAS-covered contracts and subcontracts that were awarded based on the previous cost accounting practice;
(2) Assists the CFAO in determining whether individual contract price or cost adjustments are required; and
(3) The contractor may submit a detailed cost-impact (DCI) proposal in lieu of a GDM proposal provided the DCI proposal is in accordance with paragraph (g) of this section.
(e) General dollar magnitude proposal content. The GDM proposal—
(1) Shall calculate the cost impact in accordance with paragraph (h) of this section;
(2) May use one or more of the following methods to determine the increase or decrease in cost accumulations:
(i) A representative sample of affected CAS-covered contracts and subcontracts.
(ii) The change in indirect rates multiplied by the total estimated base computed for each of the following groups:
(A) Fixed-price contracts and subcontracts.
(B) Flexibly-priced contracts and subcontracts.
(iii) Any other method that provides a reasonable approximation of the total increase or decrease in cost accumulations for all affected fixed-price and flexibly-priced contracts and subcontracts.
(3) May be in any format acceptable to the CFAO but, as a minimum, shall include the following data:
(i) A general dollar magnitude estimate of the total increase or decrease in cost accumulations by Executive agency, including any impact the change may have on contract and subcontract incentives, fees, and profits, for each of the following groups:
(A) Fixed-price contracts and subcontracts.
(B) Flexibly-priced contracts and subcontracts.
(ii) For unilateral changes, the increased or decreased costs to the Government for each of the following groups:
(A) Fixed-price contracts and subcontracts.
(B) Flexibly-priced contracts and subcontracts; and
(4) When requested by the CFAO, shall identify all affected CAS-covered contracts and subcontracts.
(f) General dollar magnitude proposal evaluation. The CFAO shall promptly evaluate the GDM proposal. If the cost impact is immaterial, the CFAO shall notify the contractor in writing and conclude the cost-impact process with no contract adjustments. Otherwise, the CFAO shall—
(1) Negotiate and resolve the cost impact (see 30.606). If necessary, the CFAO may request that the contractor submit a revised GDM proposal by a specified date with specific additional data needed to resolve the cost impact (e.g., an expanded sample of affected CAS-covered contracts and subcontracts or a revised method of computing the increase or decrease in cost accumulations); or
(2) Request that the contractor submit a DCI proposal by a specified date if the CFAO determines that the GDM proposal is not sufficient to resolve the cost impact.
(g) Detailed cost-impact proposal. If the contractor is required to submit a DCI proposal, the CFAO shall promptly evaluate the DCI proposal and follow the procedures at 30.606 to negotiate and resolve the cost impact. The DCI proposal—
(1) Shall calculate the cost impact in accordance with paragraph (h) of this section;
(2) Shall show the estimated increase or decrease in cost accumulations for each affected CAS-covered contract and subcontract unless the CFAO and contractor agree to—
(i) Include only those affected CAS-covered contracts and subcontracts exceeding a specified amount; and
(ii) Estimate the total increase or decrease in cost accumulations for all affected CAS-covered contracts and subcontracts, using the results in paragraph (g)(2)(i) of this section;
(3) May be in any format acceptable to the CFAO but, as a minimum, shall include the requirements at paragraphs (e)(3)(i) and (ii) of this section; and
(4) When requested by the CFAO, shall identify all affected contracts and subcontracts.
(h) Calculating cost impacts. The cost impact calculation shall—
(1) Include all affected CAS-covered contracts and subcontracts regardless of their status (i.e., open or closed) or the fiscal year(s) in which the costs are incurred (i.e., whether or not the final indirect rates have been established);
(2) Combine the cost impact for all affected CAS-covered contracts and subcontracts for all segments if the effect of a change results in costs flowing between those segments;
(3) For unilateral changes—
(i) Determine the increased or decreased cost to the Government for flexibly-priced contracts and subcontracts as follows:
(A) When the estimated cost to complete using the changed practice exceeds the estimated cost to complete using the current practice, the difference is increased cost to the Government.
(B) When the estimated costs to complete using the changed practice is less than the estimated cost to complete using the current practice, the difference is decreased cost to the Government.
(ii) Determine the increased or decreased cost to the Government for fixed-price contracts and subcontracts as follows:
(A) When the estimated cost to complete using the changed practice is less than the estimated cost to complete using the current practice, the difference is increased cost to the Government.
(B) When the estimated cost to complete using the changed practice exceeds the estimated cost to complete using the current practice, the difference is decreased cost to the Government.
(iii) Calculate the total increase or decrease in contract and subcontract incentives, fees, and profits associated with the increased or decreased cost to the Government in accordance with 48 CFR 9903.306(c). The associated increase or decrease is based on the difference between the negotiated incentives, fees and profits and the amounts that would have been negotiated had the cost impact been known at the time the contracts and subcontracts were negotiated.
(iv) Calculate the increased cost to the Government in the aggregate.
(4) For required or desirable changes, negotiate an equitable adjustment as provided in the Changes clause of the contract.
(i) Remedies. If the contractor does not submit the accounting change description or the proposals required in paragraph (d) or (g) of this section within the specified time, or any extension granted by the CFAO, the CFAO shall—
(1) Estimate the general dollar magnitude of the cost impact on affected CAS-covered contracts and subcontracts; and
(2) Take one or both of the following actions:
(i) Withhold an amount not to exceed 10 percent of each subsequent payment related to the contractor's CAS-covered contracts (up to the estimated general dollar magnitude of the cost impact), until the contractor furnishes the required information.
(ii) Issue a final decision in accordance with 33.211 and unilaterally adjust the contract(s) by the estimated amount of the cost impact.
Overhaul text
No section with this number.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 30.000 | Scope of part. | Scope of part. | Changed · 63% alike | 56 → 26 |
| 30.001 | Definitions. | Definitions. | Changed · 89% alike | 496 → 532 |
| 30.101 | Cost Accounting Standards. | Cost Accounting Standards. | Changed · 65% alike | 92 → 186 |
| 30.102 | Cost Accounting Standards Board publication. | none | Not in the overhaul | 51 → – |
| 30.201 | Contract requirements. | Applicability. | Changed · 26% alike | 66 → 128 |
| 30.201-1 | CAS applicability. | none | Not in the overhaul | 51 → – |
| 30.201-2 | Types of CAS coverage. | none | Not in the overhaul | 5 → – |
| 30.201-3 | Solicitation provisions. | none | Not in the overhaul Same heading at 30.204 | 124 → – |
| 30.201-4 | Contract clauses. | none | Not in the overhaul Same heading at 30.205 | 491 → – |
| 30.201-5 | Waiver. | none | Not in the overhaul | 430 → – |
| 30.201-6 | Findings. | none | Not in the overhaul | 5 → – |
| 30.201-7 | Cognizant Federal agency responsibilities. | none | Not in the overhaul | 5 → – |
| 30.202 | Disclosure requirements. | Waiver. | Changed · 0% alike | 0 → 413 |
| 30.202-1 | General requirements. | none | Not in the overhaul | 5 → – |
| 30.202-2 | Impracticality of submission. | none | Not in the overhaul | 5 → – |
| 30.202-3 | Amendments and revisions. | none | Not in the overhaul | 5 → – |
| 30.202-4 | Privileged and confidential information. | none | Not in the overhaul | 5 → – |
| 30.202-5 | Filing disclosure statements. | none | Not in the overhaul | 5 → – |
| 30.202-6 | Responsibilities. | none | Not in the overhaul | 176 → – |
| 30.202-7 | Determinations. | none | Not in the overhaul | 299 → – |
| 30.202-8 | Subcontractor disclosure statements. | none | Not in the overhaul | 70 → – |
| 30.203 | none | Exemption. | New number | – → 29 |
| 30.204 | none | Solicitation provisions. | New number Same heading as today's 30.201-3 | – → 53 |
| 30.205 | none | Contract clauses. | New number Same heading as today's 30.201-4 | – → 472 |
| 30.301 | none | Contractor disclosure statements. | New number | – → 130 |
| 30.302 | none | Changes to disclosed or established cost accounting practices. | New number Same heading as today's 30.603 | – → 0 |
| 30.302-1 | none | Required changes. | New number Same heading as today's 30.603-1 | – → 454 |
| 30.302-2 | none | Unilateral and desirable changes. | New number Same heading as today's 30.603-2 | – → 561 |
| 30.302-3 | none | Processing changes to disclosed or established cost accounting practices. | New number Same heading as today's 30.604 | – → 339 |
| 30.401 | none | CAS administration. | New number | – → 148 |
| 30.402 | none | Materiality. | New number Same heading as today's 30.602 | – → 153 |
| 30.403 | none | Changes to disclosed or established cost accounting practices. | New number Same heading as today's 30.603 | – → 1028 |
| 30.404 | none | Processing noncompliances. | New number Same heading as today's 30.605 | – → 1602 |
| 30.405 | none | Resolving cost impacts. | New number Same heading as today's 30.606 | – → 1066 |
| 30.406 | none | Subcontract administration. | New number Same heading as today's 30.607 | – → 86 |
| 30.601 | Responsibility. | none | Not in the overhaul | 155 → – |
| 30.602 | Materiality. | none | Not in the overhaul Same heading at 30.402 | 155 → – |
| 30.603 | Changes to disclosed or established cost accounting practices. | none | Not in the overhaul Same heading at 30.302 | 0 → – |
| 30.603-1 | Required changes. | none | Not in the overhaul Same heading at 30.302-1 | 450 → – |
| 30.603-2 | Unilateral and desirable changes. | none | Not in the overhaul Same heading at 30.302-2 | 557 → – |
| 30.604 | Processing changes to disclosed or established cost accounting practices. | none | Not in the overhaul Same heading at 30.302-3 | 1422 → – |
| 30.605 | Processing noncompliances. | none | Not in the overhaul Same heading at 30.404 | 1713 → – |
| 30.606 | Resolving cost impacts. | none | Not in the overhaul Same heading at 30.405 | 1208 → – |
| 30.607 | Subcontract administration. | none | Not in the overhaul Same heading at 30.406 | 88 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress