The FAR overhaul, side by side
FAR Part 32: Contract Financing
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 175 sections, 36,904 words (Part 32 as in force, eCFR as of Oct 29, 2026). Overhaul text: 171 sections, 34,567 words (on acquisition.gov ↗, issued Sep 30, 2025). By number: 52 the same, 115 changed, 8 not in the overhaul, 4 new.
32.503-6: Changed (92% alike)
Today: Suspension or reduction of payments.
(a) General. The Progress Payments clause provides a Government right to reduce or suspend progress payments, or to increase the liquidation rate, under specified conditions. These conditions and actions are discussed in paragraphs (b) through (g) below.
(1) The contracting officer shall take these actions only in accordance with the contract terms and never precipitately or arbitrarily. These actions should be taken only after—
(i) Notifying the contractor of the intended action and providing an opportunity for discussion;
(ii) Evaluating the effect of the action on the contractor's operations, based on the contractor's financial condition, projected cash requirements, and the existing or available credit arrangements; and
(iii) Considering the general equities of the particular situation.
(2) The contracting officer shall take immediate unilateral action only if warranted by circumstances such as overpayments or unsatisfactory contract performance.
(3) In all cases, the contracting officer shall—
(i) Act fairly and reasonably;
(ii) Base decisions on substantial evidence; and
(iii) Document the contract file. Findings made under paragraph (c) of the Progress Payments clause shall be in writing.
(b) Contractor noncompliance. (1) The contractor must comply with all material requirements of the contract. This includes the requirement to maintain an efficient and reliable accounting system and controls, adequate for the proper administration of progress payments. If the system or controls are deemed inadequate, progress payments shall be suspended (or the portion of progress payments associated with the unacceptable portion of the contractor's accounting system shall be suspended) until the necessary changes have been made.
(2) If the contractor fails to comply with the contract without fault or negligence, the contracting officer will not take action permitted by paragraph (c)(1) of the Progress Payments clause, other than to correct overpayments and collect amounts due from the contractor.
(c) Unsatisfactory financial condition. (1) If the contracting officer finds that contract performance (including full liquidation of progress payments) is endangered by the contractor's financial condition, or by a failure to make progress, the contracting officer shall require the contractor to make additional operating or financial arrangements adequate for completing the contract without loss to the Government.
(2) If the contracting officer concludes that further progress payments would increase the probable loss to the Government, the contracting officer shall suspend progress payments and all other payments until the unliquidated balance of progress payments is eliminated.
(d) Excessive inventory. If the inventory allocated to the contract exceeds reasonable requirements (including a reasonable accumulation of inventory for continuity of operations), the contracting officer should, in addition to requiring the transfer of excessive inventory from the contract, take one or more of the following actions, as necessary, to avoid or correct overpayment:
(1) Eliminate the costs of the excessive inventory from the costs eligible for progress payments, with appropriate reduction in progress payments outstanding.
(2) Apply additional deductions to billings for deliveries (increase liquidation).
(e) Delinquency in payment of costs of performance. (1) If the contractor is delinquent in paying the costs of contract performance in the ordinary course of business, the contracting officer shall evaluate whether the delinquency is caused by an unsatisfactory financial condition and, if so, shall apply the guidance in paragraph (c) above. If the contractor's financial condition is satisfactory, the contracting officer shall not deny progress payments if the contractor agrees to—
(i) Cure the payment delinquencies;
(ii) Avoid further delinquencies; and
(iii) Make additional arrangements adequate for completing the contract without loss to the Government.
(2) If the contractor has, in good faith, disputed amounts claimed by subcontractors, suppliers, or others, the contracting officer shall not consider the payments delinquent until the amounts due are established by the parties through litigation or arbitration. However, the amounts shall be excluded from costs eligible for progress payments so long as they are disputed.
(3) Determinations of delinquency in making contributions under employee pension, profit sharing, or stock ownership plans, and exclusion of costs for such contributions from progress payment requests, shall be in accordance with paragraph (a)(3) of the clause at 52.232-16, Progress Payments, without regard to the provisions of 32.503-6.
(f) Fair value of undelivered work. Progress payments must be commensurate with the fair value of work accomplished in accordance with contract requirements. The contracting officer must adjust progress payments when necessary to ensure that the fair value of undelivered work equals or exceeds the amount of unliquidated progress payments. On loss contracts, the application of a loss ratio as provided at paragraph (g) of this subsection constitutes this adjustment.
(g) Loss contracts. (1) If the sum of the total costs incurred under a contract plus the estimated costs to complete the performance are likely to exceed the contract price, the contracting officer shall compute a loss ratio factor and adjust future progress payments to exclude the element of loss. The loss ratio factor is computed as follows:
(i) Revise the current contract price used in progress payment computations (the current ceiling price under fixed-price incentive contracts) to include the not-to-exceed amount for any pending change orders and unpriced orders.
(ii) Divide the revised contract price by the sum of the total costs incurred to date plus the estimated additional costs of completing the contract performance.
(2) If the contracting officer believes a loss is probable, future progress payment requests shall be modified as follows:
(i) The contract price shall be the revised amount computed under subparagraph (1)(i) above.
(ii) The total costs eligible for progress payments shall be the product of (A) the sum of paid costs eligible for progress payments times (B) the loss ratio factor computed under subparagraph (1)(ii) above.
(iii) The costs applicable to items delivered, invoiced, and accepted shall not include costs in excess of the contract price of the items.
(3) The contracting officer may use audit assistance, technical services, management reports, and other sources of pertinent data to evaluate progress payment requests. If the contracting officer concludes that the contractor's figures in the contractor's progress payment request are not correct, the contracting officer shall—
(i) In the manner prescribed in paragraph (4) below, prepare a supplementary analysis to be attached to the contractor's request;
(ii) Advise the contractor in writing of the differences; and
(iii) Adjust all further progress payments in accordance with paragraph (1) above, using the contracting officer's figures, until the difference is resolved.
(4) The following is an example of the supplementary analysis required in paragraph (g)(3) of this subsection:
* This amount must be the same as the contract price of the items delivered.
Overhaul text: Suspension or reduction of payments.
(a) General. The Progress Payments clause provides a Government right to reduce or suspend progress payments, or to increase the liquidation rate, under specified conditions. These conditions and actions are discussed in paragraphs (b) through (g) of this subsection.
(1) The contracting officer must take these actions only in accordance with the contract terms and never precipitately or arbitrarily. These actions should be taken only after-
(i) Notifying the contractor of the intended action and providing an opportunity for discussion;
(ii) Evaluating the effect of the action on the contractor’s operations, based on the contractor’s financial condition, projected cash requirements, and the existing or available credit arrangements; and
(iii) Considering the general equities of the particular situation.
(2) The contracting officer must take immediate unilateral action only if warranted by circumstances such as overpayments or unsatisfactory contract performance.
(3) In all cases, the contracting officer must-
(i) Act fairly and reasonably;
(ii) Base decisions on substantial evidence; and
(iii) Document the contract file. Findings made under paragraph (c) of the Progress Payments clause must be in writing.
(b) Contractor noncompliance.
(1) The contractor must comply with all material requirements of the contract. This includes the requirement to maintain an efficient and reliable accounting system and controls, adequate for the proper administration of progress payments. If the system or controls are deemed inadequate, progress payments must be suspended (or the portion of progress payments associated with the unacceptable portion of the contractor’s accounting system must be suspended) until the necessary changes have been made.
(2) If the contractor fails to comply with the contract without fault or negligence, the contracting officer will not take action permitted by paragraph (c)(1) of the Progress Payments clause, other than to correct overpayments and collect amounts due from the contractor.
(c) Unsatisfactory financial condition.
(1) If the contracting officer finds that contract performance (including full liquidation of progress payments) is endangered by the contractor’s financial condition, or by a failure to make progress, the contracting officer must require the contractor to make additional operating or financial arrangements adequate for completing the contract without loss to the Government.
(2) If the contracting officer concludes that further progress payments would increase the probable loss to the Government, the contracting officer must suspend progress payments and all other payments until the unliquidated balance of progress payments is eliminated.
(d) Excessive inventory. If the inventory allocated to the contract exceeds reasonable requirements (including a reasonable accumulation of inventory for continuity of operations), the contracting officer should, in addition to requiring the transfer of excessive inventory from the contract, take one or more of the following actions, as necessary, to avoid or correct overpayment:
(1) Eliminate the costs of the excessive inventory from the costs eligible for progress payments, with appropriate reduction in progress payments outstanding.
(2) Apply additional deductions to billings for deliveries (increase liquidation).
(e) Delinquency in payment of costs of performance.
(1) If the contractor is delinquent in paying the costs of contract performance in the ordinary course of business, the contracting officer must evaluate whether the delinquency is caused by an unsatisfactory financial condition and, if so, must apply the guidance in paragraph (c) of this section. If the contractor’s financial condition is satisfactory, the contracting officer must not deny progress payments if the contractor agrees to-
(i) Cure the payment delinquencies;
(ii) Avoid further delinquencies; and
(iii) Make additional arrangements adequate for completing the contract without loss to the Government.
(2) If the contractor has, in good faith, disputed amounts claimed by subcontractors, suppliers, or others, the contracting officer must not consider the payments delinquent until the amounts due are established by the parties through litigation or arbitration. However, the amounts must be excluded from costs eligible for progress payments so long as they are disputed.
(3) Determinations of delinquency in making contributions under employee pension, profit sharing, or stock ownership plans, and exclusion of costs for such contributions from progress payment requests, must be in accordance with paragraph (a)(3) of the clause at 52.232-16, Progress Payments, without regard to the provisions of 32.503-6.
(f) Fair value of undelivered work . Progress payments must be commensurate with the fair value of work accomplished in accordance with contract requirements. The contracting officer must adjust progress payments when necessary to ensure that the fair value of undelivered work equals or exceeds the amount of unliquidated progress payments. On loss contracts, the application of a loss ratio as provided at paragraph (g) of this section constitutes this adjustment.
(g) Loss contracts.
(1) If the sum of the total costs incurred under a contract plus the estimated costs to complete the performance are likely to exceed the contract price, the contracting officer must compute a loss ratio factor and adjust future progress payments to exclude the element of loss. The loss ratio factor is computed as follows:
(i) Revise the current contract price used in progress payment computations (the current ceiling price under fixed-price incentive contracts) to include the not-to-exceed amount for any pending change orders and unpriced orders.
(ii) Divide the revised contract price by the sum of the total costs incurred to date plus the estimated additional costs of completing the contract performance.
(2) If the contracting officer believes a loss is probable, future progress payment requests must be modified as follows:
(i) The contract price must be the revised amount computed under paragraph (g)(1)(i) of this section.
(ii) The total costs eligible for progress payments must be the product of
(A) The sum of paid costs eligible for progress payments times
(B) The loss ratio factor computed under paragraph (g)(1)(ii) of this section.
(iii) The costs applicable to items delivered, invoiced, and accepted must not include costs in excess of the contract price of the items.
(3) The contracting officer may use audit assistance, technical services, management reports, and other sources of pertinent data to evaluate progress payment requests. If the contracting officer concludes that the contractor’s figures in the contractor’s progress payment request are not correct, the contracting officer must-
(i) In the manner prescribed in paragraph (4) of this section, prepare a supplementary analysis to be attached to the contractor’s request;
(ii) Advise the contractor in writing of the differences; and
(iii) Adjust all further progress payments in accordance with paragraph (1) of this section, using the contracting officer’s figures, until the difference is resolved.
(4) The following is an example of the supplementary analysis required in paragraph (g)(3) of this section:
Section I:
Contract price $2,850,000
Change orders and unpriced orders (to extent funds have been obligated) $150,000
Revised contract price $3,000,000
Section II:
Total costs incurred to date $2,700,000
Estimated additional costs to complete $900,000
Total costs to complete $3,600,000
Total costs eligible for progress payments $2,700,000
Loss ratio factor 83.3%
Recognized costs for progress payments $2,249,100
Progress payment rate 80.0%
Alternate amount to be used $1,799,280
Section III:
Factored costs of items delivered* $750,000
Recognized costs applicable to undelivered items ($2,249,100–$750,000) $1,499,100
*This amount must be the same as the contract price of the items delivered.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 32.000 | Scope of part. | Scope of part. | Changed · 83% alike | 100 → 132 |
| 32.001 | Definitions. | Definitions. | Changed · 96% alike | 677 → 634 |
| 32.002 | Applicability of subparts. | Applicability of subparts. | Changed · 93% alike | 139 → 135 |
| 32.003 | Simplified acquisition procedures financing. | Simplified acquisition procedures financing. | Changed · 95% alike | 20 → 20 |
| 32.004 | Contract performance in foreign countries. | Contract performance in foreign countries. | Changed · 98% alike | 63 → 63 |
| 32.005 | Consideration for contract financing. | Consideration for contract financing. | Changed · 98% alike | 254 → 256 |
| 32.006 | Reduction or suspension of contract payments upon finding of fraud. | Reduction or suspension of contract payments upon finding of fraud. | Same | 0 → 0 |
| 32.006-1 | General. | General. | Changed · 100% alike | 196 → 197 |
| 32.006-2 | Definition. | Definition. | Same | 52 → 52 |
| 32.006-3 | Responsibilities. | Responsibilities. | Changed · 94% alike | 34 → 34 |
| 32.006-4 | Procedures. | Procedures. | Changed · 95% alike | 489 → 489 |
| 32.006-5 | Reporting. | Reporting. | Changed · 93% alike | 109 → 105 |
| 32.007 | Contract financing payments. | Contract financing payments. | Changed · 40% alike | 271 → 99 |
| 32.008 | Notification of overpayment. | Notification of overpayment. | Changed · 96% alike | 27 → 27 |
| 32.009 | Providing accelerated payments to small business contractors and to prime contractors that subcontract with a small business concern. | Providing accelerated payments to small business contractors and to prime contractors that subcontract with a small business concern. | Same | 0 → 0 |
| 32.009-1 | General. | General. | Changed · 99% alike | 292 → 292 |
| 32.009-2 | Contract clause. | Contract clause. | Same | 16 → 16 |
| 32.100 | Scope of subpart. | Scope of subpart. | Changed · 97% alike | 29 → 29 |
| 32.101 | Authority. | Authority. | Changed · 87% alike | 39 → 37 |
| 32.102 | Description of contract financing methods. | Description of contract financing methods. | Changed · 82% alike | 420 → 304 |
| 32.103 | Progress payments under construction contracts. | Progress payments under construction contracts. | Changed · 94% alike | 158 → 154 |
| 32.104 | Providing contract financing. | Providing contract financing. | Changed · 99% alike | 520 → 523 |
| 32.105 | Uses of contract financing. | Uses of contract financing. | Changed · 99% alike | 123 → 123 |
| 32.106 | Order of preference. | Order of preference. | Same | 96 → 96 |
| 32.107 | Need for contract financing not a deterrent. | Need for contract financing not a deterrent. | Changed · 99% alike | 71 → 71 |
| 32.108 | Financial consultation. | Financial consultation. | Changed · 90% alike | 62 → 72 |
| 32.109 | Termination financing. | Termination financing. | Changed · 96% alike | 54 → 54 |
| 32.110 | Payment of subcontractors under cost-reimbursement prime contracts. | Payment of subcontractors under cost-reimbursement prime contracts. | Same | 157 → 157 |
| 32.111 | Contract clauses for noncommercial purchases. | Contract clauses for noncommercial purchases. | Changed · 99% alike | 495 → 495 |
| 32.112 | Nonpayment of subcontractors under contracts other than for commercial products and commercial services. | Nonpayment of subcontractors under contracts other than for commercial products and commercial services. | Same | 0 → 0 |
| 32.112-1 | Subcontractor assertions of nonpayment. | Subcontractor assertions of nonpayment. | Changed · 94% alike | 293 → 281 |
| 32.112-2 | Subcontractor requests for information. | Subcontractor requests for information. | Changed · 93% alike | 153 → 143 |
| 32.113 | Customary contract financing. | Customary contract financing. | Same | 261 → 261 |
| 32.114 | Unusual contract financing. | Unusual contract financing. | Changed · 97% alike | 35 → 35 |
| 32.200 | Scope of subpart. | Scope of subpart. | Same | 17 → 17 |
| 32.201 | Statutory authority. | Statutory authority. | Changed · 69% alike | 49 → 87 |
| 32.202 | General. | General. | Same | 0 → 0 |
| 32.202-1 | Policy. | Policy. | Changed · 99% alike | 479 → 479 |
| 32.202-2 | Types of payments for commercial product and commercial service purchases. | Types of payments for commercial product and commercial service purchases. | Changed · 88% alike | 107 → 104 |
| 32.202-3 | Conducting market research about financing terms. | Conducting market research about financing terms. | Same | 114 → 114 |
| 32.202-4 | Security for Government financing. | Security for Government financing. | Changed · 98% alike | 617 → 617 |
| 32.203 | Determining contract financing terms. | Determining contract financing terms. | Same | 65 → 65 |
| 32.204 | Procedures for contracting officer-specified commercial contract financing. | Procedures for contracting officer-specified commercial contract financing. | Changed · 96% alike | 131 → 131 |
| 32.205 | Procedures for offeror-proposed commercial contract financing. | Procedures for offeror-proposed commercial contract financing. | Changed · 100% alike | 373 → 373 |
| 32.206 | Solicitation provisions and contract clauses. | Solicitation provisions and contract clauses. | Changed · 94% alike | 1156 → 1077 |
| 32.207 | Administration and payment of commercial financing payments. | Administration and payment of commercial financing payments. | Changed · 95% alike | 142 → 139 |
| 32.300 | Scope of subpart. | Scope of subpart. | Changed · 87% alike | 28 → 25 |
| 32.301 | Definitions. | Definitions. | Changed · 66% alike | 113 → 56 |
| 32.302 | Authority. | Authority. | Changed · 95% alike | 95 → 88 |
| 32.303 | General. | General. | Changed · 73% alike | 430 → 259 |
| 32.304 | Procedures. | [Reserved] | Same | 0 → 0 |
| 32.304-1 | Application for guarantee. | none | Not in the overhaul | 221 → – |
| 32.304-2 | Certificate of eligibility. | none | Not in the overhaul | 637 → – |
| 32.304-3 | Asset formula. | none | Not in the overhaul | 154 → – |
| 32.304-4 | Guarantee amount and maturity. | none | Not in the overhaul | 123 → – |
| 32.304-5 | Assignment of claims under contracts. | none | Not in the overhaul | 263 → – |
| 32.304-6 | Other collateral security. | none | Not in the overhaul | 48 → – |
| 32.304-7 | Contract surety bonds and loan guarantees. | none | Not in the overhaul | 171 → – |
| 32.304-8 | Other borrowing. | none | Not in the overhaul | 156 → – |
| 32.305 | Loan guarantees for terminated contracts. | [Reserved] | Changed · 0% alike | 183 → 0 |
| 32.306 | Loan guarantees for subcontracts. | [Reserved] | Changed · 0% alike | 85 → 0 |
| 32.400 | Scope of subpart. | Scope of subpart. | Changed · 85% alike | 47 → 38 |
| 32.401 | Statutory authority. | Statutory authority. | Changed · 90% alike | 62 → 58 |
| 32.402 | General. | General. | Changed · 94% alike | 444 → 427 |
| 32.403 | Applicability. | [Reserved] | Changed · 0% alike | 238 → 0 |
| 32.404 | Exclusions. | Exclusions. | Changed · 97% alike | 133 → 132 |
| 32.405 | Applying Pub. L. 85-804 to advance payments under sealed bid contracts. | Applying Pub.L.85-804 to advance payments under sealed bid contracts. | Changed · 99% alike | 168 → 168 |
| 32.406 | Letters of credit. | Letters of credit. | Changed · 95% alike | 372 → 355 |
| 32.407 | Interest. | Interest. | Changed · 95% alike | 387 → 389 |
| 32.408 | Application for advance payments. | Application for advance payments. | Changed · 91% alike | 299 → 276 |
| 32.409 | Contracting officer action. | Contracting officer action. | Changed · 97% alike | 34 → 34 |
| 32.409-1 | Recommendation for approval. | Recommendation for approval. | Changed · 99% alike | 159 → 159 |
| 32.409-2 | Recommendation for disapproval. | Recommendation for disapproval. | Changed · 97% alike | 31 → 31 |
| 32.409-3 | Security, supervision, and covenants. | Security, supervision, and covenants. | Changed · 99% alike | 444 → 446 |
| 32.410 | Findings, determination, and authorization. | Findings, determination, and authorization. | Changed · 96% alike | 733 → 729 |
| 32.411 | Agreement for special account at a financial institution. | Agreement for special account at a financial institution. | Changed · 99% alike | 636 → 637 |
| 32.412 | Contract clause. | Contract clause. | Changed · 96% alike | 182 → 178 |
| 32.500 | Scope of subpart. | Scope of subpart. | Changed · 96% alike | 76 → 81 |
| 32.501 | General. | General. | Changed · 98% alike | 81 → 81 |
| 32.501-1 | Customary progress payment rates. | Customary progress payment rates. | Same | 152 → 152 |
| 32.501-2 | Unusual progress payments. | Unusual progress payments. | Same | 124 → 124 |
| 32.501-3 | Contract price. | Contract price. | Changed · 99% alike | 205 → 205 |
| 32.501-4 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 32.501-5 | Other protective terms. | Other protective terms. | Changed · 99% alike | 97 → 95 |
| 32.502 | Preaward matters. | Preaward matters. | Same | 34 → 34 |
| 32.502-1 | Use of customary progress payments. | Use of customary progress payments. | Same | 39 → 39 |
| 32.502-2 | Contract finance office clearance. | Contract finance office clearance. | Changed · 99% alike | 116 → 116 |
| 32.502-3 | Solicitation provisions. | Solicitation provisions. | Changed · 93% alike | 150 → 140 |
| 32.502-4 | Contract clauses. | Contract clauses. | Changed · 100% alike | 334 → 334 |
| 32.503 | Postaward matters. | Postaward matters. | Same | 34 → 34 |
| 32.503-1 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 32.503-2 | Supervision of progress payments. | Supervision of progress payments. | Changed · 100% alike | 257 → 257 |
| 32.503-3 | Initiation of progress payments and review of accounting system. | Initiation of progress payments and review of accounting system. | Changed · 99% alike | 152 → 152 |
| 32.503-4 | Approval of progress payment requests. | Approval of progress payment requests. | Changed · 100% alike | 169 → 168 |
| 32.503-5 | Administration of progress payments. | Administration of progress payments. | Changed · 99% alike | 237 → 236 |
| 32.503-6 | Suspension or reduction of payments. | Suspension or reduction of payments. | Changed · 92% alike | 1099 → 1220 |
| 32.503-7 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 32.503-8 | Liquidation rates—ordinary method. | Liquidation rates-ordinary method. | Same | 77 → 77 |
| 32.503-9 | Liquidation rates—alternate method. | Liquidation rates—alternate method. | Changed · 98% alike | 442 → 442 |
| 32.503-10 | Establishing alternate liquidation rates. | Establishing alternate liquidation rates. | Same | 260 → 260 |
| 32.503-11 | Adjustments for price reduction. | Adjustments for price reduction. | Changed · 98% alike | 97 → 97 |
| 32.503-12 | Maximum unliquidated amount. | Maximum unliquidated amount. | Changed · 98% alike | 158 → 160 |
| 32.503-13 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 32.503-14 | Protection of Government title. | Protection of Government title. | Changed · 100% alike | 210 → 210 |
| 32.503-15 | Application of Government title terms. | Application of Government title terms. | Changed · 99% alike | 256 → 258 |
| 32.503-16 | Risk of loss. | Risk of loss. | Same | 153 → 153 |
| 32.504 | Subcontracts under prime contracts providing progress payments. | Subcontracts under prime contracts providing progress payments. | Changed · 99% alike | 656 → 658 |
| 32.600 | Scope of subpart. | Scope of subpart. | Same | 48 → 48 |
| 32.601 | General. | General. | Same | 260 → 260 |
| 32.602 | Responsibilities. | Responsibilities. | Changed · 99% alike | 109 → 109 |
| 32.603 | Debt determination. | Debt determination. | Changed · 98% alike | 105 → 105 |
| 32.604 | Demand for payment. | Demand for payment. | Changed · 99% alike | 1007 → 1007 |
| 32.605 | Final decisions. | Final decisions. | Changed · 98% alike | 172 → 172 |
| 32.606 | Debt collection. | Debt collection. | Changed · 98% alike | 155 → 155 |
| 32.607 | Installment payments and deferment of collection. | Installment payments and deferment of collection. | Changed · 98% alike | 232 → 231 |
| 32.607-1 | Installment payments. | Installment payments. | Changed · 97% alike | 30 → 30 |
| 32.607-2 | Deferment of collection. | Deferment of collection. | Changed · 69% alike | 649 → 353 |
| 32.608 | Interest. | Interest. | Same | 0 → 0 |
| 32.608-1 | Interest charges. | Interest charges. | Changed · 98% alike | 53 → 53 |
| 32.608-2 | Interest credits. | Interest credits. | Changed · 98% alike | 257 → 257 |
| 32.609 | Delays in receipt of notices or demands. | Delays in receipt of notices or demands. | Changed · 98% alike | 61 → 61 |
| 32.610 | Compromising debts. | Compromising debts. | Same | 40 → 40 |
| 32.611 | Contract clause. | Contract clause. | Changed · 98% alike | 130 → 126 |
| 32.700 | Scope of subpart. | Scope of subpart. | Changed · 97% alike | 33 → 31 |
| 32.701 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 32.702 | Policy. | Policy. | Changed · 97% alike | 71 → 69 |
| 32.703 | Contract funding requirements. | Contract funding requirements. | Same | 0 → 0 |
| 32.703-1 | General. | General. | Same | 55 → 55 |
| 32.703-2 | Contracts conditioned upon availability of funds. | Contracts conditioned upon availability of funds. | Changed · 99% alike | 208 → 209 |
| 32.703-3 | Contracts crossing fiscal years. | Contracts crossing fiscal years. | Changed · 96% alike | 158 → 155 |
| 32.704 | Limitation of cost or funds. | Limitation of cost or funds. | Changed · 97% alike | 353 → 347 |
| 32.705 | Unenforceability of unauthorized obligations. | Unenforceability of unauthorized obligations. | Changed · 99% alike | 100 → 102 |
| 32.706 | Contract clauses. | Contract clauses. | Same | 0 → 0 |
| 32.706-1 | Clauses for contracting in advance of funds. | Clauses for contracting in advance of funds. | Changed · 98% alike | 99 → 95 |
| 32.706-2 | Clauses for limitation of cost or funds. | Clauses for limitation of cost or funds. | Changed · 71% alike | 65 → 96 |
| 32.706-3 | Clause for unenforceability of unauthorized obligations. | Clause for unenforceability of unauthorized obligations. | Changed · 88% alike | 19 → 15 |
| 32.800 | Scope of subpart. | Scope of subpart. | Changed · 97% alike | 34 → 32 |
| 32.801 | Definitions. | Definitions. | Same | 72 → 72 |
| 32.802 | Conditions. | Conditions. | Same | 170 → 170 |
| 32.803 | Policies. | Policies. | Same | 350 → 350 |
| 32.804 | Extent of assignee's protection. | Extent of assignee's protection. | Changed · 99% alike | 238 → 240 |
| 32.805 | Procedure. | Procedure. | Changed · 97% alike | 680 → 707 |
| 32.806 | Contract clauses. | Contract clauses. | Changed · 98% alike | 151 → 151 |
| 32.900 | Scope of subpart. | Scope of subpart. | Same | 23 → 23 |
| 32.901 | Applicability. | Applicability. | Same | 42 → 42 |
| 32.902 | Definitions. | Definitions. | Same | 88 → 88 |
| 32.903 | Responsibilities. | Responsibilities. | Same | 195 → 195 |
| 32.904 | Determining payment due dates. | Determining payment due dates. | Changed · 93% alike | 1949 → 2221 |
| 32.905 | Payment documentation and process. | Payment documentation and process. | Changed · 100% alike | 741 → 741 |
| 32.906 | Making payments. | Making payments. | Same | 467 → 467 |
| 32.907 | Interest penalties. | Interest penalties. | Changed · 100% alike | 588 → 587 |
| 32.908 | Contract clauses. | Contract clauses. | Same | 468 → 468 |
| 32.909 | Contractor inquiries. | Contractor inquiries. | Same | 94 → 94 |
| 32.1000 | Scope of subpart. | Scope of subpart. | Same | 17 → 17 |
| 32.1001 | Policy. | Policy. | Changed · 99% alike | 149 → 149 |
| 32.1002 | Bases for performance-based payments. | Bases for performance-based payments. | Same | 30 → 30 |
| 32.1003 | Criteria for use. | Criteria for use. | Same | 70 → 70 |
| 32.1004 | Procedures. | Procedures. | Changed · 98% alike | 1206 → 1206 |
| 32.1005 | Solicitation provision and contract clause. | Solicitation provision and contract clause. | Same | 91 → 91 |
| 32.1006 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 32.1007 | Administration and payment of performance-based payments. | Administration and payment of performance-based payments. | Changed · 98% alike | 295 → 295 |
| 32.1008 | Suspension or reduction of performance-based payments. | Suspension or reduction of performance-based payments. | Changed · 98% alike | 51 → 51 |
| 32.1009 | Title. | Title. | Changed · 99% alike | 182 → 182 |
| 32.1010 | Risk of loss. | Risk of loss. | Same | 202 → 202 |
| 32.1100 | Scope of subpart. | Scope of subpart. | Same | 20 → 20 |
| 32.1101 | Statutory requirements. | Statutory requirements. | Same | 28 → 28 |
| 32.1102 | Definitions. | Definitions. | Changed · 99% alike | 125 → 125 |
| 32.1103 | Applicability. | Applicability. | Changed · 99% alike | 313 → 313 |
| 32.1104 | Protection of EFT information. | Protection of EFT information. | Changed · 91% alike | 11 → 11 |
| 32.1105 | Assignment of claims. | Assignment of claims. | Same | 73 → 73 |
| 32.1106 | EFT mechanisms. | EFT mechanisms. | Changed · 99% alike | 172 → 172 |
| 32.1107 | Payment information. | Payment information. | Changed · 97% alike | 33 → 33 |
| 32.1108 | Payment by Governmentwide commercial purchase card. | Payment by Governmentwide commercial purchase card. | Changed · 99% alike | 542 → 543 |
| 32.1109 | EFT information submitted by offerors. | EFT information submitted by offerors. | Changed · 98% alike | 58 → 58 |
| 32.1110 | Solicitation provision and contract clauses. | Solicitation provision and contract clauses. | Changed · 97% alike | 721 → 687 |
| 32.1201 | none | General. | New number | – → 128 |
| 32.1202 | none | Conditions for use. | New number | – → 209 |
| 32.1203 | none | Preparation and execution of orders. | New number | – → 129 |
| 32.1204 | none | Contract clause. | New number | – → 59 |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress