The FAR overhaul, side by side

FAR Part 9: Contractor Qualifications

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 106 sections, 23,354 words (Part 9 as in force, eCFR as of Oct 29, 2026). Overhaul text: 94 sections, 19,745 words (on acquisition.gov ↗, issued Aug 21, 2025, updated Nov 17, 2026). By number: 22 the same, 71 changed, 13 not in the overhaul, 1 new.

9.406-1: Changed (98% alike)

Today: General.

This section in plain English

(a) It is the suspending and debarring official's responsibility to determine whether debarment is in the Government's interest. The suspending and debarring official may, in the public interest, debar a contractor for any of the causes in 9.406-2, using the procedures in 9.406-3. The existence of a cause for debarment, however, does not necessarily require that the contractor be debarred; the seriousness of the contractor's acts or omissions and any remedial measures, mitigating factors, or aggravating factors should be considered in making any debarment decision. Before arriving at any debarment decision, the suspending and debarring official should consider factors such as the following (some of the factors below could apply to individuals such as contractors that are individuals, and are so marked):

(1) Whether the contractor had effective standards of conduct and internal control systems in place at the time of the activity which constitutes cause for debarment or had adopted such procedures prior to any Government investigation of the activity cited as a cause for debarment.

(2) Whether the contractor (including an individual) brought the activity cited as a cause for debarment to the attention of the appropriate Government agency in a timely manner.

(3) Whether the contractor has fully investigated the circumstances surrounding the cause for debarment (or the individual cooperated with the investigation) and, if so, made the result of the investigation available to the suspending and debarring official.

(4) Whether the contractor (including an individual) cooperated fully with Government agencies during the investigation and any court or administrative action.

(5) Whether the contractor (including an individual) has paid or has agreed to pay all criminal, civil, and administrative liability for the improper activity, including any investigative or administrative costs incurred by the Government, and has made or agreed to make full restitution.

(6) Whether the contractor has taken appropriate disciplinary action against the individuals responsible for the activity which constitutes cause for debarment.

(7) Whether the contractor (including an individual) has implemented or agreed to implement remedial measures, including any identified by the Government.

(8)(i) Whether the contractor has instituted or agreed to institute new or revised review and control procedures, ethics training, or other relevant training programs.

(ii) For an individual, whether the individual has attended relevant remediation training.

(9) Whether the contractor (including an individual) has had adequate time to eliminate the circumstances that led to the cause for debarment.

(10)(i) Whether the contractor's management recognizes, accepts, and understands the seriousness of the misconduct giving rise to the cause for debarment and has implemented programs to prevent recurrence.

(ii) For an individual, whether the individual recognizes, accepts, and understands the seriousness of the misconduct giving rise to the cause for debarment and has adopted practices to prevent recurrence.

(11) Whether the contractor (including an individual) has a pattern or prior history of wrongdoing, the frequency of incidents and/or duration of the wrongdoing, and the actual or potential harm or impact that results, or may result, from the wrongdoing.

(12) Whether and to what extent the contractor (including an individual) planned, initiated, or carried out the wrongdoing, and the kind of positions within the contractor's organization held by the individual involved in the wrongdoing.

(13) Whether the wrongdoing was pervasive within the contractor's organization.

(14) Whether the individual or the contractor's principals tolerated the offense.

(15) Whether the contractor (including an individual) is or has been excluded or disqualified by an agency of the Federal Government or has not been allowed to participate in State or local contracts or assistance agreements on a basis of conduct similar to one or more of the causes for debarment specified in this subpart.

(16) Whether the contractor (including an individual) has entered into an administrative agreement with a Federal agency or a similar agreement with a State or local government that is not Governmentwide but is based on conduct similar to one or more of the causes for debarment specified in this subpart.

(17) Whether there are any other factors to consider for the contractor (including an individual) appropriate to the circumstances of a particular case.

(b) The existence or nonexistence of any aggravating or mitigating factors or remedial measures such as set forth in paragraph (a) of this section is not necessarily determinative of a contractor's present responsibility. Accordingly, if a cause for debarment exists, the contractor has the burden of demonstrating, to the satisfaction of the suspending and debarring official, its present responsibility and that debarment is not necessary.

(c) Debarment constitutes debarment of all divisions or other organizational elements of the contractor, unless the debarment decision is limited by its terms to specific divisions, organizational elements, or commodities. The suspending and debarring official may extend the debarment decision to include any affiliates of the contractor if they are—

(1) Specifically named; and

(2) Given written notice of the proposed debarment and an opportunity to respond (see 9.406-3(c)).

(d) A contractor's debarment, or proposed debarment, shall be effective throughout the executive branch of the Government, unless the agency head or a designee (except see 26.505(e)) states in writing the compelling reasons justifying continued business dealings between that agency and the contractor.

(e)(1) When the suspending and debarring official has authority to debar contractors from both contracts pursuant to the Federal Acquisition Regulation in this chapter and contracts for the purchase of Federal personal property pursuant to the Federal Management Regulation (FMR) in 41 CFR part 102-38, that official shall consider simultaneously debarring the contractor from the award of acquisition contracts and from the purchase of Federal personal property.

(2) When debarring a contractor from the award of acquisition contracts and from the purchase of Federal personal property, the debarment notice shall so indicate and the appropriate FAR and FMR citations shall be included.

Overhaul text: General.

On acquisition.gov ↗

(a) The suspending and debarring official is responsible for determining whether debarment is in the Government's interest. The suspending and debarring official may, in the public interest, debar a contractor for any of the causes in 9.406-2, using the procedures in 9.406-3. The existence of a cause for debarment, however, does not necessarily require that the contractor be debarred; the seriousness of the contractor's acts or omissions and any remedial measures, mitigating factors, or aggravating factors should be considered in making any debarment decision. Before arriving at any debarment decision, the suspending and debarring official should consider factors such as the following (some of the factors below could apply to individuals such as contractors that are individuals, and are so marked):

(1) Whether the contractor had effective standards of conduct and internal control systems in place at the time of the activity which constitutes cause for debarment or had adopted such procedures prior to any Government investigation of the activity cited as a cause for debarment.

(2) Whether the contractor (including an individual) brought the activity cited as a cause for debarment to the attention of the appropriate Government agency in a timely manner.

(3) Whether the contractor has fully investigated the circumstances surrounding the cause for debarment (or the individual cooperated with the investigation) and, if so, made the result of the investigation available to the suspending and debarring official.

(4) Whether the contractor (including an individual) cooperated fully with Government agencies during the investigation and any court or administrative action.

(5) Whether the contractor (including an individual) has paid or has agreed to pay all criminal, civil, and administrative liability for the improper activity, including any investigative or administrative costs incurred by the Government, and has made or agreed to make full restitution.

(6) Whether the contractor has taken appropriate disciplinary action against the individuals responsible for the activity which constitutes cause for debarment.

(7) Whether the contractor (including an individual) has implemented or agreed to implement remedial measures, including any identified by the Government.

(8)

(i) Whether the contractor has instituted or agreed to institute new or revised review and control procedures, ethics training, or other relevant training programs.

(ii) For an individual, whether the individual has attended relevant remediation training.

(9) Whether the contractor (including an individual) has had adequate time to eliminate the circumstances that led to the cause for debarment.

(10)

(i) Whether the contractor's management recognizes, accepts, and understands the seriousness of the misconduct giving rise to the cause for debarment and has implemented programs to prevent recurrence.

(ii) For an individual, whether the individual recognizes, accepts, and understands the seriousness of the misconduct giving rise to the cause for debarment and has adopted practices to prevent recurrence.

(11) Whether the contractor (including an individual) has a pattern or prior history of wrongdoing, the frequency of incidents and/or duration of the wrongdoing, and the actual or potential harm or impact that results, or may result, from the wrongdoing.

(12) Whether and to what extent the contractor (including an individual) planned, initiated, or carried out the wrongdoing, and the kind of positions within the contractor's organization held by the individual involved in the wrongdoing.

(13) Whether the wrongdoing was pervasive within the contractor's organization.

(14) Whether the individual or the contractor's principals tolerated the offense.

(15) Whether the contractor (including an individual) is or has been excluded or disqualified by an agency of the Federal Government or has not been allowed to participate in State or local contracts or assistance agreements on a basis of conduct similar to one or more of the causes for debarment specified in this subpart.

(16) Whether the contractor (including an individual) has entered into an administrative agreement with a Federal agency or a similar agreement with a State or local government that is not Governmentwide but is based on conduct similar to one or more of the causes for debarment specified in this subpart.

(17) Whether any other factors meriting consideration exist for the contractor (including an individual) under the circumstances.

(b) The existence or nonexistence of any aggravating or mitigating factors or remedial measures such as set forth in paragraph (a) of this section is not necessarily determinative of a contractor's present responsibility. Accordingly, if a cause for debarment exists, the contractor has the burden of demonstrating, to the satisfaction of the suspending and debarring official, its present responsibility and that debarment is not necessary.

(c) Debarment constitutes debarment of all divisions or other organizational elements of the contractor, unless the debarment decision is limited by its terms to specific divisions, organizational elements, or commodities. The suspending and debarring official may extend the debarment decision to include any affiliates of the contractor if they are—

(1) Specifically named; and

(2) Given written notice of the proposed debarment and an opportunity to respond (see 9.406-3(c)).

(d) A contractor's debarment, or proposed debarment, is effective throughout the executive branch of the Government, unless the agency head or a designee (except see 26.505(e)) states in writing the compelling reasons justifying continued business dealings between that agency and the contractor.

(e)

(1) When the suspending and debarring official has authority to debar contractors from both contracts pursuant to the Federal Acquisition Regulation in this chapter and contracts for the purchase of Federal personal property pursuant to the Federal Management Regulation (FMR) in 41 CFR part 102-38, that official must consider simultaneously debarring the contractor from the award of acquisition contracts and from the purchase of Federal personal property.

(2) A notice debarring a contractor from the award of acquisition contracts and from the purchase of Federal personal property must include the appropriate FAR and FMR citations.

Section by section

SectionTodayOverhaul textStatusWords
9.000Scope of part.noneNot in the overhaul39 → –
9.100Scope of subpart.noneNot in the overhaul16 → –
9.101Definitions.Definitions.Changed · 84% alike114 → 84
9.102Applicability.Applicability.Changed · 95% alike84 → 82
9.103Policy.Policy.Changed · 44% alike180 → 75
9.104Standards.Standards.Same0 → 0
9.104-1General standards.General standards.Changed · 92% alike211 → 199
9.104-2Special standards.[Reserved]Changed · 0% alike101 → 0
9.104-3Application of standards.Application of standards.Changed · 65% alike559 → 317
9.104-4Subcontractor responsibility.Subcontractor responsibility.Changed · 86% alike123 → 106
9.104-5Representation and certifications regarding responsibility matters.Representation and certifications regarding responsibility matters.Changed · 92% alike402 → 366
9.104-6Federal Awardee Performance and Integrity Information System.Federal Awardee Performance and Integrity Information.Changed · 75% alike602 → 486
9.104-7Solicitation provisions and contract clauses.Solicitation provisions and contract clauses.Changed · 75% alike277 → 177
9.105Procedures.Procedures.Same0 → 0
9.105-1Obtaining information.Obtaining information.Changed · 64% alike474 → 273
9.105-2Determinations and documentation.Determinations and documentation.Changed · 76% alike538 → 484
9.105-3Disclosure of preaward information.Disclosure of preaward information.Changed · 25% alike110 → 32
9.106Preaward surveys.[Reserved]Same0 → 0
9.106-1Conditions for preaward surveys.noneNot in the overhaul178 → –
9.106-2Requests for preaward surveys.noneNot in the overhaul106 → –
9.106-3Interagency preaward surveys.noneNot in the overhaul55 → –
9.106-4Reports.noneNot in the overhaul305 → –
9.107Surveys of nonprofit agencies participating in the AbilityOne Program.[Reserved]Changed · 0% alike243 → 0
9.108Prohibition on contracting with inverted domestic corporations.Prohibition on contracting with inverted domestic corporations.Same0 → 0
9.108-1Definitions.Definitions.Same71 → 71
9.108-2Prohibition.Authority.Changed · 31% alike153 → 33
9.108-3Representation by the offeror.Prohibition.Changed · 20% alike81 → 90
9.108-4Waiver.Representation by the offeror.Changed · 5% alike49 → 76
9.108-5Solicitation provision and contract clause.Waiver.Changed · 15% alike61 → 47
9.108-6noneSolicitation provision and contract clause.New number– → 57
9.109Prohibition on contracting with an entity involved in activities that violate arms control treaties or agreements with the United States.Prohibition on contracting with an entity involved in activities that violate arms control treaties or agreements with the United States.Same0 → 0
9.109-1Authority.Authority.Changed · 77% alike6 → 7
9.109-2Prohibition.Prohibition.Changed · 84% alike51 → 40
9.109-3Exception.Exception.Same96 → 96
9.109-4Certification by the offeror.Certification by the offeror.Changed · 81% alike349 → 335
9.109-5Solicitation provision.Solicitation provision.Changed · 96% alike55 → 51
9.110Reserve Officer Training Corps and military recruiting on campus.Reserve Officer Training Corps and military recruiting on campus.Same0 → 0
9.110-1Definitions.Definitions.Same92 → 92
9.110-2Authority.AuthorityChanged · 77% alike6 → 7
9.110-3Policy.Policy.Changed · 100% alike267 → 267
9.110-4Procedures.Procedures.Changed · 91% alike114 → 117
9.110-5Contract clause.Contract clause.Changed · 89% alike65 → 59
9.200Scope of subpart.Scope of subpart.Changed · 43% alike27 → 10
9.201Definitions.Definitions.Same69 → 69
9.202Policy.Policy.Changed · 86% alike800 → 761
9.203QPL's, QML's, and QBL's.QPL’s, QML’s, and QBL’s.Changed · 98% alike224 → 225
9.204Responsibilities for establishment of a qualification requirement.Responsibilities when establishing qualification requirements.Changed · 92% alike550 → 531
9.205Opportunity for qualification before award.Opportunity for qualification before award.Changed · 91% alike220 → 216
9.206Acquisitions subject to qualification requirements.Acquisitions subject to qualification requirements.Same0 → 0
9.206-1General.General.Changed · 84% alike462 → 376
9.206-2Contract clause.Contract clause.Changed · 91% alike25 → 21
9.206-3Competition.Competition.Changed · 83% alike208 → 166
9.207Changes in status regarding qualification requirements.Changes in status regarding qualification requirements.Changed · 95% alike303 → 293
9.301Definition.Definition.Changed · 96% alike24 → 24
9.302General.General.Changed · 91% alike69 → 60
9.303Use.Use.Changed · 93% alike92 → 88
9.304Exceptions.Exceptions.Changed · 91% alike72 → 69
9.305Risk.Risk.Changed · 81% alike148 → 122
9.306Solicitation requirements.Solicitation requirements.Changed · 91% alike404 → 380
9.307Government administration procedures.Administrative procedures.Changed · 89% alike225 → 196
9.308Contract clauses.Contract clauses.Same0 → 0
9.308-1Testing performed by the contractor.Testing performed by the contractor.Changed · 65% alike270 → 194
9.308-2Testing performed by the Government.Testing performed by the Government.Changed · 65% alike269 → 214
9.400Scope of subpart.Scope of subpart.Changed · 98% alike121 → 121
9.401Applicability.Applicability.Changed · 98% alike98 → 98
9.402Policy.Policy.Changed · 98% alike204 → 204
9.403Definitions.Definitions.Same718 → 718
9.404Exclusions in the System for Award Management.Exclusions in the System for Award Management.Changed · 94% alike383 → 361
9.405Effect of listing.Effect of listing.Changed · 87% alike375 → 354
9.405-1Continuation of current contracts.Continuation of current contracts.Changed · 97% alike222 → 223
9.405-2Restrictions on subcontracting.Restrictions on subcontracting.Changed · 96% alike367 → 363
9.406Debarment.Debarment.Same0 → 0
9.406-1General.General.Changed · 98% alike977 → 961
9.406-2Causes for debarment.Causes for debarment.Changed · 82% alike994 → 742
9.406-3Procedures.Procedures.Changed · 94% alike1390 → 1381
9.406-4Period of debarment.Period of debarment.Changed · 96% alike324 → 325
9.406-5Scope of debarment.Scope of debarment.Changed · 98% alike191 → 189
9.407Suspension.Suspension.Same0 → 0
9.407-1General.General.Changed · 96% alike546 → 536
9.407-2Causes for suspension.Causes for suspension.Changed · 98% alike467 → 484
9.407-3Procedures.Procedures.Changed · 93% alike1329 → 1329
9.407-4Period of suspension.Period of suspension.Changed · 98% alike155 → 155
9.407-5Scope of suspension.Scope of suspension.Changed · 93% alike28 → 28
9.408[Reserved][Reserved]Same0 → 0
9.409Contract clause.Contract clause.Changed · 94% alike38 → 34
9.500Scope of subpart.Scope of subpart.Changed · 94% alike58 → 55
9.501Definition.Definition.Same89 → 89
9.502Applicability.Applicability.Same174 → 174
9.503Waiver.Waiver.Changed · 97% alike75 → 75
9.504Contracting officer responsibilities.Contracting officer responsibilities.Changed · 98% alike272 → 272
9.505General rules.General rules.Same212 → 212
9.505-1Providing systems engineering and technical direction.Providing systems engineering and technical direction.Same166 → 166
9.505-2Preparing specifications or work statements.Preparing specifications or work statements.Changed · 100% alike487 → 487
9.505-3Providing evaluation services.Providing evaluation services.Changed · 98% alike44 → 44
9.505-4Obtaining access to proprietary information.Obtaining access to proprietary information.Changed · 100% alike208 → 208
9.506Procedures.Procedures.Changed · 99% alike354 → 354
9.507Solicitation provisions and contract clause.Solicitation provisions and contract clause.Same0 → 0
9.507-1Solicitation provisions.Solicitation provisions.Changed · 98% alike110 → 111
9.507-2Contract clause.Contract clause.Changed · 98% alike174 → 174
9.508Examples.Examples.Same577 → 577
9.601Definition.noneNot in the overhaul59 → –
9.602General.noneNot in the overhaul103 → –
9.603Policy.noneNot in the overhaul55 → –
9.604Limitations.noneNot in the overhaul104 → –
9.701Definition.noneNot in the overhaul120 → –
9.702Contracting with pools.noneNot in the overhaul215 → –
9.703Contracting with individual pool members.noneNot in the overhaul77 → –