Industry · NAICS 333314
Optical Instrument and Lens Manufacturing
Open notices · Coming up for re-bid · Who wins this work · Typical award sizes
Money by year
Obligations (money committed) in prime awards, from USAspending.gov.
Agencies buying it, FY2025
- Department of Defense $213.66M
- National Aeronautics and Space Administration $76.22M
- Department of Health and Human Services $2.79M
- Department of Veterans Affairs $553.6K
- Department of Homeland Security $547.1K
- Department of Agriculture $286.0K
- Department of the Treasury $207.8K
- Department of Justice $186.8K
Offices buying the most, FY2025
- W6QK Acc-Apg $153.18M
- Nasa Goddard Space Flight Center $76.26M
- W6QK Acc-Ri-Picatinny $21.13M
- W6QK Acc-Apg Natick $13.08M
- Commander $10.41M
- Dla Land Warren $5.44M
- NSWC Crane $4.60M
- W6QK Acc- Dta $4.32M
Companies winning it, FY2025
- Leonardo S.P.A. $143.29M
- Association of Universities for Research in Astronomy, Inc. $73.71M
- L3Harris Technologies, Inc. $30.44M
- Wilcox Industries Corp. $16.12M
- Seiler Instrument and Manufacturing Company, Incorporated $5.29M
- Trijicon, Inc. $4.97M
- Northrop Grumman Corp $4.37M
- Nikon Corporation $3.38M
- Elbit Systems of America - Night Vision LLC $3.13M
- Lightforce USA, Incorporated $2.88M
Where the work is, FY2025
Contracts ending in the next 12 months
18 contracts, $3.29B with options. The largest:
| Contract | Incumbent | Ends | Value with options |
|---|---|---|---|
| GSFC0198106DNAS526555 THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20 | Association of Universities for Research in Astronomy, Inc. | 2026-10-31 | $2.61B |
| W911QY24F0065 EQUIPMENT | L3 Technologies, Inc. | 2026-11-30 | $11.46M |
| N0038321F0ZM0 CIWS LONG TERM CONTRACT | Raytheon Company | 2026-12-31 | $62.60M |
| W91CRB22C5012 1. THIS IS A FFP CONTRACT UNDER FMS REQUIREMENT FOR THE GOVERNMENT OF LITHUANIA UNDER FMS CASES LH-B0-UDG. 2. THIS CONTRACT IS SOLE-SOURCE TO FLIR SYSTEMS INC. FOR TACFLIR 230/VIK/MAST/DISPLAY, INSTALLATION AND TRAINING. | Teledyne Flir Defense, Inc. | 2026-12-31 | $11.92M |
| 75N98026F00356 NIKON AX-R LIFETIME CONFOCAL SYSTEM | Nikon Instruments Inc | 2027-01-15 | $1.40M |
| W15QKN25F0314 REQUIREMENT FOR M240 MACHINE-GUN MOUNTED OPTIC. | Raytheon Canada Limited | 2027-01-26 | $3.49M |
| 75N98026F00329 NHLBI: SUPPLY: NIKON AXR-NSPARC-ABLATION-FLIM MICROSCOPY SYSTEM PURCHASE | Nikon Instruments Inc | 2027-01-27 | $1.34M |
| 75N98026F00255 NIAMS:SUPPLY:CONFOCAL MICROSCOPY SYSTEM LEICA STELLARIS WLL DIVE:N/A | Leica Microsystems Inc. | 2027-01-29 | $1.50M |
| 80GSFC19C0021 OPTICAL TELESCOPE ASSEMBLY (OTA) THIS CONTRACT PROVIDES FOR ALL EFFORTS AND RESPONSIBILITIES FOR THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO BUILD, REFURBISH, OR MODIFY THE OTA AS REQUIRED TO MEET THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) PERFORMANCE REQUIREMENTS. | L3Harris Technologies, Inc. | 2027-01-31 | $378.91M |
| W91CRB25FA250 FWS-I SYSTEMS | DRS Network & Imaging Systems LLC | 2027-01-31 | $63.81M |
Open notices
None open right now. Set an alert for the next one.
From USAspending.gov prime awards and SAM.gov notices. Sources and limits