DFARS 252.236-7008 Contract prices—bidding schedules.
In plain English: This provision says the government's payment for each item in the Bidding Schedule is full compensation for all plant, labor, equipment, appliances, and materials, plus all operations needed to finish the work as shown in the drawings and specifications. It also requires the contractor to build the cost of every specified item of work into the scheduled prices, even if that work is not separately listed. For a small contractor, this means bid prices must cover the whole job described in the specifications, not just the listed line items. (A summary written by AI from the official text below, which is what governs. Not legal advice.)
When it applies: as prescribed in 236.570(b)(6), which says when contracting officers use it.
Last amended 2016-12-22 · This page's summary last updated 2026-11-07 · Text as of 2026-10-29 (the eCFR copy this page shows) · Official text of DFARS 252.236-7008 ↗
The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.
Open SAM.gov notices that cite DFARS 252.236-7008 · Ask the AI chat about it
In more detail
Applies to: Contractors bidding on construction work using a Bidding Schedule
What it requires
- Include in the Bidding Schedule prices all costs for work called for in the specifications, whether or not that work is separately listed
Key terms: Bidding Schedule · full compensation · plant, labor, equipment, appliances, and materials · drawings and specifications
Written by AI from this section's text. A guide, not legal advice: the text below rules.
The text
As prescribed in 236.570(b)(6), use the following provision:
Contract Prices—Bidding Schedules (DEC 1991)
(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for—
(1) Furnishing all plant, labor, equipment, appliances, and materials; and
(2) Performing all operations required to complete the work in conformity with the drawings and specifications.
(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.
(End of provision)
Sections it refers to
- 236.570 Additional provisions and clauses.
Sections that refer to it
- 236.570 Additional provisions and clauses.
Related DFARS 252.236 sections
- 252.236-7001 Contract drawings and specifications.
- 252.236-7002 Obstruction of navigable waterways.
- 252.236-7003 Payment for mobilization and preparatory work.
- 252.236-7004 Payment for mobilization and demobilization.
- 252.236-7005 Airfield safety precautions.
- 252.236-7006 Cost limitation.
- 252.236-7007 Additive or deductive items.
- 252.236-7009 [Reserved]
- 252.236-7010 Overseas military construction—Preference for United States firms.
- 252.236-7011 Overseas architect-engineer services—Restriction to United States firms.
- 252.236-7012 Military construction on Kwajalein Atoll—evaluation preference.
- 252.236-7013 Requirement for Competition Opportunity for American Steel Producers, Fabricators, and Manufacturers.
← 252.236-7007 Additive or deductive items. · 252.236-7009 [Reserved] →
Rule changes for DFARS Part 252
- Defense Federal Acquisition Regulation Supplement: Modifications to Printed Circuit Board Acquisition Restrictions (DFARS Case 2022-D011) ↗ · proposed 2026-07-02 · comments due 2026-08-31
- Defense Federal Acquisition Regulation Supplement: Certification Requirement for Military Recruitment Advertising (DFARS Case 2024-D022) ↗ · proposed 2026-06-25 · comments due 2026-08-24
- Defense Federal Acquisition Regulation Supplement: Small Purchase Exception for the Acquisition of U.S. Flags (DFARS Case 2024-D013) ↗ · proposed 2026-06-25 · comments due 2026-08-24
- Defense Federal Acquisition Regulation Supplement: Mitigating Risks Related to Foreign Ownership, Control, or Influence (DFARS Case 2021-D011) ↗ · proposed 2026-05-07 · comments due 2026-07-06
- Defense Federal Acquisition Regulation Supplement: Assessing Contractor Implementation of Cybersecurity Requirements (DFARS Case 2019-D041) ↗ · final rule 2025-09-10 · effective 2025-11-10
- Defense Federal Acquisition Regulation Supplement: Limitation on Certain Institutes of Higher Education (DFARS Case 2024-D023); Correction ↗ · final rule 2025-08-28 · effective 2025-08-28
- Defense Federal Acquisition Regulation Supplement: Disclosure of DoD Funding in Technical Publications (DFARS Case 2024-D003) ↗ · proposed 2025-08-25 · comments due 2025-10-24
- Defense Federal Acquisition Regulation Supplement: Limitation on Certain Institutes of Higher Education (DFARS Case 2024-D023) ↗ · final rule 2025-08-25 · effective 2025-08-25
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Plain words for the terms: glossary.