DFARS 252.236-7008 Contract prices—bidding schedules.

In plain English: This provision says the government's payment for each item in the Bidding Schedule is full compensation for all plant, labor, equipment, appliances, and materials, plus all operations needed to finish the work as shown in the drawings and specifications. It also requires the contractor to build the cost of every specified item of work into the scheduled prices, even if that work is not separately listed. For a small contractor, this means bid prices must cover the whole job described in the specifications, not just the listed line items. (A summary written by AI from the official text below, which is what governs. Not legal advice.)

When it applies: as prescribed in 236.570(b)(6), which says when contracting officers use it.

Last amended 2016-12-22 · This page's summary last updated 2026-11-07 · Text as of 2026-10-29 (the eCFR copy this page shows) · Official text of DFARS 252.236-7008 ↗

The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.

Open SAM.gov notices that cite DFARS 252.236-7008 · Ask the AI chat about it

In more detail

Applies to: Contractors bidding on construction work using a Bidding Schedule

What it requires

  • Include in the Bidding Schedule prices all costs for work called for in the specifications, whether or not that work is separately listed

Key terms: Bidding Schedule · full compensation · plant, labor, equipment, appliances, and materials · drawings and specifications

Written by AI from this section's text. A guide, not legal advice: the text below rules.

The text

As prescribed in 236.570(b)(6), use the following provision:

Contract Prices—Bidding Schedules (DEC 1991)

(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for—

(1) Furnishing all plant, labor, equipment, appliances, and materials; and

(2) Performing all operations required to complete the work in conformity with the drawings and specifications.

(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.

(End of provision)

Sections it refers to

  • 236.570 Additional provisions and clauses.

Sections that refer to it

  • 236.570 Additional provisions and clauses.

Related DFARS 252.236 sections

← 252.236-7007 Additive or deductive items. · 252.236-7009 [Reserved] →

Rule changes for DFARS Part 252

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Plain words for the terms: glossary.