DFARS 236.570 Additional provisions and clauses.

The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.

In plain English

This section tells contracting officers which DFARS provisions and clauses to include in fixed-price construction solicitations and contracts. It matters to contractors because it determines which clauses will appear in their construction contracts and what those clauses require. Some clauses apply to all fixed-price construction contracts, while others apply only in specific situations such as work near navigable waterways or airfields.

Applies to: Fixed-price construction solicitations and contracts, and certain military construction solicitations

Key terms: fixed-price construction solicitations and contracts · mobilization · demobilization · statutory cost limitations · military construction appropriations

Written by AI from this section's text. A guide, not legal advice: the text below rules.

The text

(a) Use the following clauses in all fixed-price construction solicitations and contracts—

(1) 252.236-7000, Modification Proposals-Price Breakdown; and

(2) 252.236-7001, Contract Drawings and Specifications.

(b) Use the following provisions and clauses in fixed-price construction contracts and solicitations as applicable—

(1) 252.236-7002, Obstruction of Navigable Waterways, when the contract will involve work near or on navigable waterways.

(2) When the head of the contracting activity has approved use of a separate bid item for mobilization and preparatory work, use either—

(i) 252.236-7003, Payment for Mobilization and Preparatory Work. Use this clause for major construction contracts that require—

(A) Major or special items of plant and equipment; or

(B) Large stockpiles of material which are in excess of the type, kind, and quantity which would be normal for a contractor qualified to undertake the work; or

(ii) 252.236-7004, Payment for Mobilization and Demobilization. Use this clause for contracts involving major mobilization expense, or plant equipment and material (other than the situations covered in paragraph (b)(2)(i) of this section) made necessary by the location or nature of the work.

(A) Generally, allocate 60 percent of the lump sum price in paragraph (a) of the clause to the cost of mobilization.

(B) Vary this percentage to reflect the circumstances of the particular contract, but in no event should mobilization exceed 80 percent of the payment item.

(3) 252.236-7005, Airfield Safety Precautions, when construction will be performed on or near airfields.

(4) 252.236-7006, Cost Limitation, if the solicitation's bid schedule contains one or more items subject to statutory cost limitations, and if a waiver has not been granted (FAR 36.205).

(5) 252.236-7007, Additive or Deductive Items, if the procedures in 236.213 are being used.

(6) 252.236-7008, Contract Prices—Bidding Schedule, if the contract will contain only unit prices for some items.

(c) Use the following provisions in solicitations for military construction contracts that are funded with military construction appropriations and are estimated to exceed $1,000,000:

(1) 252.236-7010, Overseas Military Construction—Preference for United States Firms, when contract performance will be in a United States outlying area in the Pacific or in a country bordering the Arabian Gulf.

(2) 252.236-7012, Military Construction on Kwajalein Atoll—Evaluation Preference, when contract performance will be on Kwajalein Atoll.

(d) Use the clause at 252.236-7013, Requirement for Competition Opportunity for American Steel Producers, Fabricators, and Manufacturers, in solicitations and contracts that—

(1) Use funds appropriated for military construction); and

(2) May require the acquisition of steel as a construction material.

(e) Also see 246.710(4) for an additional clause applicable to construction contracts to be performed in Germany.

Sections it refers to

  • 252.236-7000 Modification proposals—price breakdown.
  • 252.236-7001 Contract drawings and specifications.
  • 252.236-7002 Obstruction of navigable waterways.
  • 252.236-7003 Payment for mobilization and preparatory work.
  • 252.236-7004 Payment for mobilization and demobilization.
  • 252.236-7005 Airfield safety precautions.
  • 252.236-7006 Cost limitation.
  • 36.205 Statutory cost limitations.
  • 252.236-7007 Additive or deductive items.
  • 236.213 Special procedures for sealed bidding in construction contracting.
  • 252.236-7008 Contract prices—bidding schedules.
  • 252.236-7010 Overseas military construction—Preference for United States firms.
  • 252.236-7012 Military construction on Kwajalein Atoll—evaluation preference.
  • 252.236-7013 Requirement for Competition Opportunity for American Steel Producers, Fabricators, and Manufacturers.
  • 246.710 Contract clauses.

Sections that refer to it

← 236.303-1 Phase One. · 236.601 Policy. →

Rule changes for DFARS Part 236

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Plain words for the terms: glossary.

DFARS 236.570 Additional provisions and clauses · SpendQuery