The FAR overhaul, side by side
FAR Part 36: Construction and Architect-engineer Contracts
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 81 sections, 9,525 words (Part 36 as in force, eCFR as of Oct 29, 2026). Overhaul text: 26 sections, 4,649 words, titled "Construction and Architect-Engineer Contracts" (on acquisition.gov ↗, issued Jul 24, 2025). By number: 0 the same, 7 changed, 74 not in the overhaul (5 with the same heading under another number), 19 new.
36.104: Not in the overhaul
Today: Policy.
(a) Unless the traditional acquisition approach of design-bid-build established under 40 U.S.C. chapter 11, Selection of Architects and Engineers, or another acquisition procedure authorized by law is used, the contracting officer shall use the two-phase selection procedures authorized by 10 U.S.C. 3241 or 41 U.S.C. 3309 when entering into a contract for the design and construction of a public building, facility, or work, if the contracting officer makes a determination that the procedures are appropriate for use (see subpart 36.3). Other acquisition procedures authorized by law include the procedures established in this part and other parts of this chapter and, for DoD, the design-build process described in 10 U.S.C. 2862.
(b) Agencies shall implement high-performance sustainable building design, construction, renovation, repair, commissioning, operation and maintenance, management, and deconstruction practices so as to—
(1) Ensure that—
(i) All new construction and modernization projects greater than 25,000 gross square feet are designed, constructed, and maintained to meet and, wherever practicable, exceed Federal sustainable design and operations principles for new construction and modernization projects in accordance with the Council on Environmental Quality's Guiding Principles for Sustainable Federal Buildings and Associated Instructions (Guiding Principles) (available at https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf); and
(ii) All renovation projects of existing Federal buildings must use, to the greatest extent technically feasible and practicable, Federal sustainable design and operations principles for existing buildings in accordance with the Guiding Principles;
(2) Identify alternatives to renovation that reduce existing assets' deferred maintenance costs;
(3) Ensure that rehabilitation of Federally-owned historic buildings utilizes best practices and technologies in retrofitting to promote long-term viability of the buildings; and
(4) Ensure pollution prevention and eliminate waste by diverting at least 50 percent of non-hazardous construction and demolition materials and debris.
(c)(1) Agencies shall require the use of a project labor agreement for Federal construction projects with a total estimated construction cost at or above $35 million, unless an exception applies (see subpart 22.5).
(2) Contracting officers conducting market research for Federal construction contracts, valued at or above the threshold in paragraph (c)(1) of this section, shall ensure that the procedures at 10.002(b)(1) involve a current and proactive examination of the market conditions in the project area to determine national, regional, and local entity interest in participating on a project that requires a project labor agreement, and to understand the availability of unions, and unionized and non-unionized contractors. Contracting officers may coordinate with agency labor advisors, as appropriate.
Overhaul text
No section with this number.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 36.000 | Scope of part. | Scope of part. | Changed · 49% alike | 37 → 20 |
| 36.001 | Definitions. | Definition. | Changed · 14% alike | 81 → 34 |
| 36.002 | none | Policy. | New number | – → 317 |
| 36.101 | Applicability. | Construction. | Changed · 0% alike | 98 → 0 |
| 36.101-1 | none | Acquisition Strategy. | New number | – → 332 |
| 36.101-2 | none | Use of two-phase design-build selection procedures. | New number | – → 343 |
| 36.101-3 | none | Scope of work. | New number Same heading as today's 36.302 | – → 70 |
| 36.101-4 | none | Advance notices and solicitations. | New number | – → 223 |
| 36.101-5 | none | Liquidated damages. | New number Same heading as today's 36.206 | – → 25 |
| 36.101-6 | none | Government cost estimate. | New number | – → 72 |
| 36.101-7 | none | Clauses. | New number | – → 893 |
| 36.102 | Definitions. | Architect-Engineer Services. | Changed · 0% alike | 213 → 0 |
| 36.102-1 | none | Public announcement. | New number Same heading as today's 36.601-1 | – → 18 |
| 36.102-2 | none | Contracting procedures and competition. | New number | – → 168 |
| 36.102-3 | none | Government cost estimate. | New number | – → 47 |
| 36.102-4 | none | Clauses. | New number | – → 183 |
| 36.103 | Methods of contracting. | none | Not in the overhaul | 62 → – |
| 36.104 | Policy. | none | Not in the overhaul | 425 → – |
| 36.201 | Evaluation of contractor performance. | Construction. | Changed · 0% alike | 14 → 0 |
| 36.201-1 | none | Limitations. | New number | – → 75 |
| 36.201-2 | none | Standard and optional forms. | New number | – → 204 |
| 36.202 | Specifications. | Architect and engineering services. | Changed · 0% alike | 74 → 0 |
| 36.202-1 | none | Evaluation. | New number | – → 241 |
| 36.202-2 | none | Selection authority. | New number Same heading as today's 36.602-4 | – → 168 |
| 36.202-3 | none | Award. | New number | – → 210 |
| 36.202-4 | none | Short selection process for contracts not to exceed the simplified acquisition threshold. | New number Same heading as today's 36.602-5 | – → 218 |
| 36.202-5 | none | Standard and optional forms. | New number | – → 164 |
| 36.203 | Government estimate of construction costs. | none | Not in the overhaul | 185 → – |
| 36.204 | Disclosure of the magnitude of construction projects. | none | Not in the overhaul | 107 → – |
| 36.205 | Statutory cost limitations. | none | Not in the overhaul | 218 → – |
| 36.206 | Liquidated damages. | none | Not in the overhaul Same heading at 36.101-5 | 21 → – |
| 36.207 | Pricing fixed-price construction contracts. | none | Not in the overhaul | 198 → – |
| 36.208 | Concurrent performance of firm-fixed-price and other types of construction contracts. | none | Not in the overhaul | 58 → – |
| 36.209 | Construction contracts with architect-engineer firms. | none | Not in the overhaul | 36 → – |
| 36.210 | Inspection of site and examination of data. | none | Not in the overhaul | 165 → – |
| 36.211 | Distribution of advance notices and solicitations. | none | Not in the overhaul | 343 → – |
| 36.212 | Preconstruction orientation. | none | Not in the overhaul | 135 → – |
| 36.213 | Special procedures for sealed bidding in construction contracting. | none | Not in the overhaul | 0 → – |
| 36.213-1 | General. | none | Not in the overhaul | 22 → – |
| 36.213-2 | Presolicitation notices. | none | Not in the overhaul | 192 → – |
| 36.213-3 | Invitations for bids. | none | Not in the overhaul | 345 → – |
| 36.213-4 | Notice of award. | none | Not in the overhaul | 79 → – |
| 36.214 | Special procedures for price negotiation in construction contracting. | none | Not in the overhaul | 225 → – |
| 36.215 | Special procedures for cost-reimbursement contracts for construction. | none | Not in the overhaul | 36 → – |
| 36.300 | Scope of subpart. | none | Not in the overhaul | 26 → – |
| 36.301 | Use of two-phase design-build selection procedures. | Responsibilities of contracting officers. | Changed · 7% alike | 166 → 624 |
| 36.302 | Scope of work. | none | Not in the overhaul Same heading at 36.101-3 | 60 → – |
| 36.303 | Procedures. | none | Not in the overhaul | 41 → – |
| 36.303-1 | Phase One. | none | Not in the overhaul | 281 → – |
| 36.303-2 | Phase Two. | none | Not in the overhaul | 70 → – |
| 36.500 | Scope of subpart. | none | Not in the overhaul | 60 → – |
| 36.501 | Performance of work by the contractor. | none | Not in the overhaul | 220 → – |
| 36.502 | Differing site conditions. | none | Not in the overhaul | 93 → – |
| 36.503 | Site investigation and conditions affecting the work. | none | Not in the overhaul | 97 → – |
| 36.504 | Physical data. | none | Not in the overhaul | 43 → – |
| 36.505 | Material and workmanship. | none | Not in the overhaul | 20 → – |
| 36.506 | Superintendence by the contractor. | none | Not in the overhaul | 94 → – |
| 36.507 | Permits and responsibilities. | none | Not in the overhaul | 39 → – |
| 36.508 | Other contracts. | none | Not in the overhaul | 92 → – |
| 36.509 | Protection of existing vegetation, structures, equipment, utilities, and improvements. | none | Not in the overhaul | 99 → – |
| 36.510 | Operations and storage areas. | none | Not in the overhaul | 94 → – |
| 36.511 | Use and possession prior to completion. | none | Not in the overhaul | 65 → – |
| 36.512 | Cleaning up. | none | Not in the overhaul | 92 → – |
| 36.513 | Accident prevention. | none | Not in the overhaul | 201 → – |
| 36.514 | Availability and use of utility services. | none | Not in the overhaul | 98 → – |
| 36.515 | Schedules for construction contracts. | none | Not in the overhaul | 104 → – |
| 36.516 | Quantity surveys. | none | Not in the overhaul | 82 → – |
| 36.517 | Layout of work. | none | Not in the overhaul | 47 → – |
| 36.518 | Work oversight in cost-reimbursement construction contracts. | none | Not in the overhaul | 29 → – |
| 36.519 | Organization and direction of the work. | none | Not in the overhaul | 28 → – |
| 36.520 | Contracting by negotiation. | none | Not in the overhaul | 22 → – |
| 36.521 | Specifications and drawings for construction. | none | Not in the overhaul | 135 → – |
| 36.522 | Preconstruction conference. | none | Not in the overhaul | 48 → – |
| 36.523 | Site visit. | none | Not in the overhaul | 54 → – |
| 36.600 | Scope of subpart. | none | Not in the overhaul | 29 → – |
| 36.601 | Policy. | none | Not in the overhaul | 0 → – |
| 36.601-1 | Public announcement. | none | Not in the overhaul Same heading at 36.102-1 | 42 → – |
| 36.601-2 | Competition. | none | Not in the overhaul | 23 → – |
| 36.601-3 | Applicable contracting procedures. | none | Not in the overhaul | 265 → – |
| 36.601-4 | Implementation. | none | Not in the overhaul | 273 → – |
| 36.602 | Selection of firms for architect-engineer contracts. | none | Not in the overhaul | 0 → – |
| 36.602-1 | Selection criteria. | none | Not in the overhaul | 212 → – |
| 36.602-2 | Evaluation boards. | none | Not in the overhaul | 128 → – |
| 36.602-3 | Evaluation board functions. | none | Not in the overhaul | 147 → – |
| 36.602-4 | Selection authority. | none | Not in the overhaul Same heading at 36.202-2 | 193 → – |
| 36.602-5 | Short selection process for contracts not to exceed the simplified acquisition threshold. | none | Not in the overhaul Same heading at 36.202-4 | 213 → – |
| 36.603 | Collecting data on and appraising firms' qualifications. | none | Not in the overhaul | 334 → – |
| 36.604 | Performance evaluation. | none | Not in the overhaul | 15 → – |
| 36.605 | Government cost estimate for architect-engineer work. | none | Not in the overhaul | 149 → – |
| 36.606 | Negotiations. | none | Not in the overhaul | 309 → – |
| 36.607 | Release of information on firm selection. | none | Not in the overhaul | 149 → – |
| 36.608 | Liability for Government costs resulting from design errors or deficiencies. | none | Not in the overhaul | 155 → – |
| 36.609 | Contract clauses. | none | Not in the overhaul | 0 → – |
| 36.609-1 | Design within funding limitations. | none | Not in the overhaul | 359 → – |
| 36.609-2 | Redesign responsibility for design errors or deficiencies. | none | Not in the overhaul | 93 → – |
| 36.609-3 | Work oversight in architect-engineer contracts. | none | Not in the overhaul | 21 → – |
| 36.609-4 | Requirements for registration of designers. | none | Not in the overhaul | 59 → – |
| 36.700 | Scope of subpart. | none | Not in the overhaul | 42 → – |
| 36.701 | Standard and optional forms for use in contracting for construction or dismantling, demolition, or removal of improvements. | none | Not in the overhaul | 202 → – |
| 36.702 | Forms for use in contracting for architect-engineer services. | none | Not in the overhaul | 144 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress