The FAR overhaul, side by side
FAR Part 36: Construction and Architect-engineer Contracts
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 81 sections, 9,525 words (Part 36 as in force, eCFR as of Oct 29, 2026). Overhaul text: 26 sections, 4,649 words, titled "Construction and Architect-Engineer Contracts" (on acquisition.gov ↗, issued Jul 24, 2025). By number: 0 the same, 7 changed, 74 not in the overhaul (5 with the same heading under another number), 19 new.
36.609-1: Not in the overhaul
Today: Design within funding limitations.
(a) The Government may require the architect-engineer contractor to design the project so that construction costs will not exceed a contractually specified dollar limit (funding limitation). If the price of construction proposed in response to a Government solicitation exceeds the construction funding limitation in the architect-engineer contract, the firm shall be solely responsible for redesigning the project within the funding limitation. These additional services shall be performed at no increase in the price of this contract. However, if the cost of proposed construction is affected by events beyond the firm's reasonable control (e.g., if there is an increase in material costs which could not have been anticipated, or an undue delay by the Government in issuing a construction solicitation), the firm shall not be obligated to redesign at no cost to the Government. If a firm's design fails to meet the contractual limitation on construction cost and the Government determines that the firm should not redesign the project, a written statement of the reasons for that determination shall be placed in the contract file.
(b) The amount of the construction funding limitation (to be inserted in paragraph (c) of the clause at 52.236-22) is to be established during negotiations between the contractor and the Government. This estimated construction contract price shall take into account any statutory or other limitations and exclude any allowances for Government supervision and overhead and any amounts set aside by the Government for contingencies. In negotiating the amount, the contracting officer should make available to the contractor the information upon which the Government has based its initial construction estimate and any subsequently acquired information that may affect the construction costs.
(c) The contracting officer shall insert the clause at 52.236-22, Design Within Funding Limitations, in fixed-price architect-engineer contracts except when (1) the head of the contracting activity or a designee determines in writing that cost limitations are secondary to performance considerations and additional project funding can be expected, if necessary, (2) the design is for a standard structure and is not intended for a specific location, or (3) there is little or no design effort involved.
Overhaul text
No section with this number.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 36.000 | Scope of part. | Scope of part. | Changed · 49% alike | 37 → 20 |
| 36.001 | Definitions. | Definition. | Changed · 14% alike | 81 → 34 |
| 36.002 | none | Policy. | New number | – → 317 |
| 36.101 | Applicability. | Construction. | Changed · 0% alike | 98 → 0 |
| 36.101-1 | none | Acquisition Strategy. | New number | – → 332 |
| 36.101-2 | none | Use of two-phase design-build selection procedures. | New number | – → 343 |
| 36.101-3 | none | Scope of work. | New number Same heading as today's 36.302 | – → 70 |
| 36.101-4 | none | Advance notices and solicitations. | New number | – → 223 |
| 36.101-5 | none | Liquidated damages. | New number Same heading as today's 36.206 | – → 25 |
| 36.101-6 | none | Government cost estimate. | New number | – → 72 |
| 36.101-7 | none | Clauses. | New number | – → 893 |
| 36.102 | Definitions. | Architect-Engineer Services. | Changed · 0% alike | 213 → 0 |
| 36.102-1 | none | Public announcement. | New number Same heading as today's 36.601-1 | – → 18 |
| 36.102-2 | none | Contracting procedures and competition. | New number | – → 168 |
| 36.102-3 | none | Government cost estimate. | New number | – → 47 |
| 36.102-4 | none | Clauses. | New number | – → 183 |
| 36.103 | Methods of contracting. | none | Not in the overhaul | 62 → – |
| 36.104 | Policy. | none | Not in the overhaul | 425 → – |
| 36.201 | Evaluation of contractor performance. | Construction. | Changed · 0% alike | 14 → 0 |
| 36.201-1 | none | Limitations. | New number | – → 75 |
| 36.201-2 | none | Standard and optional forms. | New number | – → 204 |
| 36.202 | Specifications. | Architect and engineering services. | Changed · 0% alike | 74 → 0 |
| 36.202-1 | none | Evaluation. | New number | – → 241 |
| 36.202-2 | none | Selection authority. | New number Same heading as today's 36.602-4 | – → 168 |
| 36.202-3 | none | Award. | New number | – → 210 |
| 36.202-4 | none | Short selection process for contracts not to exceed the simplified acquisition threshold. | New number Same heading as today's 36.602-5 | – → 218 |
| 36.202-5 | none | Standard and optional forms. | New number | – → 164 |
| 36.203 | Government estimate of construction costs. | none | Not in the overhaul | 185 → – |
| 36.204 | Disclosure of the magnitude of construction projects. | none | Not in the overhaul | 107 → – |
| 36.205 | Statutory cost limitations. | none | Not in the overhaul | 218 → – |
| 36.206 | Liquidated damages. | none | Not in the overhaul Same heading at 36.101-5 | 21 → – |
| 36.207 | Pricing fixed-price construction contracts. | none | Not in the overhaul | 198 → – |
| 36.208 | Concurrent performance of firm-fixed-price and other types of construction contracts. | none | Not in the overhaul | 58 → – |
| 36.209 | Construction contracts with architect-engineer firms. | none | Not in the overhaul | 36 → – |
| 36.210 | Inspection of site and examination of data. | none | Not in the overhaul | 165 → – |
| 36.211 | Distribution of advance notices and solicitations. | none | Not in the overhaul | 343 → – |
| 36.212 | Preconstruction orientation. | none | Not in the overhaul | 135 → – |
| 36.213 | Special procedures for sealed bidding in construction contracting. | none | Not in the overhaul | 0 → – |
| 36.213-1 | General. | none | Not in the overhaul | 22 → – |
| 36.213-2 | Presolicitation notices. | none | Not in the overhaul | 192 → – |
| 36.213-3 | Invitations for bids. | none | Not in the overhaul | 345 → – |
| 36.213-4 | Notice of award. | none | Not in the overhaul | 79 → – |
| 36.214 | Special procedures for price negotiation in construction contracting. | none | Not in the overhaul | 225 → – |
| 36.215 | Special procedures for cost-reimbursement contracts for construction. | none | Not in the overhaul | 36 → – |
| 36.300 | Scope of subpart. | none | Not in the overhaul | 26 → – |
| 36.301 | Use of two-phase design-build selection procedures. | Responsibilities of contracting officers. | Changed · 7% alike | 166 → 624 |
| 36.302 | Scope of work. | none | Not in the overhaul Same heading at 36.101-3 | 60 → – |
| 36.303 | Procedures. | none | Not in the overhaul | 41 → – |
| 36.303-1 | Phase One. | none | Not in the overhaul | 281 → – |
| 36.303-2 | Phase Two. | none | Not in the overhaul | 70 → – |
| 36.500 | Scope of subpart. | none | Not in the overhaul | 60 → – |
| 36.501 | Performance of work by the contractor. | none | Not in the overhaul | 220 → – |
| 36.502 | Differing site conditions. | none | Not in the overhaul | 93 → – |
| 36.503 | Site investigation and conditions affecting the work. | none | Not in the overhaul | 97 → – |
| 36.504 | Physical data. | none | Not in the overhaul | 43 → – |
| 36.505 | Material and workmanship. | none | Not in the overhaul | 20 → – |
| 36.506 | Superintendence by the contractor. | none | Not in the overhaul | 94 → – |
| 36.507 | Permits and responsibilities. | none | Not in the overhaul | 39 → – |
| 36.508 | Other contracts. | none | Not in the overhaul | 92 → – |
| 36.509 | Protection of existing vegetation, structures, equipment, utilities, and improvements. | none | Not in the overhaul | 99 → – |
| 36.510 | Operations and storage areas. | none | Not in the overhaul | 94 → – |
| 36.511 | Use and possession prior to completion. | none | Not in the overhaul | 65 → – |
| 36.512 | Cleaning up. | none | Not in the overhaul | 92 → – |
| 36.513 | Accident prevention. | none | Not in the overhaul | 201 → – |
| 36.514 | Availability and use of utility services. | none | Not in the overhaul | 98 → – |
| 36.515 | Schedules for construction contracts. | none | Not in the overhaul | 104 → – |
| 36.516 | Quantity surveys. | none | Not in the overhaul | 82 → – |
| 36.517 | Layout of work. | none | Not in the overhaul | 47 → – |
| 36.518 | Work oversight in cost-reimbursement construction contracts. | none | Not in the overhaul | 29 → – |
| 36.519 | Organization and direction of the work. | none | Not in the overhaul | 28 → – |
| 36.520 | Contracting by negotiation. | none | Not in the overhaul | 22 → – |
| 36.521 | Specifications and drawings for construction. | none | Not in the overhaul | 135 → – |
| 36.522 | Preconstruction conference. | none | Not in the overhaul | 48 → – |
| 36.523 | Site visit. | none | Not in the overhaul | 54 → – |
| 36.600 | Scope of subpart. | none | Not in the overhaul | 29 → – |
| 36.601 | Policy. | none | Not in the overhaul | 0 → – |
| 36.601-1 | Public announcement. | none | Not in the overhaul Same heading at 36.102-1 | 42 → – |
| 36.601-2 | Competition. | none | Not in the overhaul | 23 → – |
| 36.601-3 | Applicable contracting procedures. | none | Not in the overhaul | 265 → – |
| 36.601-4 | Implementation. | none | Not in the overhaul | 273 → – |
| 36.602 | Selection of firms for architect-engineer contracts. | none | Not in the overhaul | 0 → – |
| 36.602-1 | Selection criteria. | none | Not in the overhaul | 212 → – |
| 36.602-2 | Evaluation boards. | none | Not in the overhaul | 128 → – |
| 36.602-3 | Evaluation board functions. | none | Not in the overhaul | 147 → – |
| 36.602-4 | Selection authority. | none | Not in the overhaul Same heading at 36.202-2 | 193 → – |
| 36.602-5 | Short selection process for contracts not to exceed the simplified acquisition threshold. | none | Not in the overhaul Same heading at 36.202-4 | 213 → – |
| 36.603 | Collecting data on and appraising firms' qualifications. | none | Not in the overhaul | 334 → – |
| 36.604 | Performance evaluation. | none | Not in the overhaul | 15 → – |
| 36.605 | Government cost estimate for architect-engineer work. | none | Not in the overhaul | 149 → – |
| 36.606 | Negotiations. | none | Not in the overhaul | 309 → – |
| 36.607 | Release of information on firm selection. | none | Not in the overhaul | 149 → – |
| 36.608 | Liability for Government costs resulting from design errors or deficiencies. | none | Not in the overhaul | 155 → – |
| 36.609 | Contract clauses. | none | Not in the overhaul | 0 → – |
| 36.609-1 | Design within funding limitations. | none | Not in the overhaul | 359 → – |
| 36.609-2 | Redesign responsibility for design errors or deficiencies. | none | Not in the overhaul | 93 → – |
| 36.609-3 | Work oversight in architect-engineer contracts. | none | Not in the overhaul | 21 → – |
| 36.609-4 | Requirements for registration of designers. | none | Not in the overhaul | 59 → – |
| 36.700 | Scope of subpart. | none | Not in the overhaul | 42 → – |
| 36.701 | Standard and optional forms for use in contracting for construction or dismantling, demolition, or removal of improvements. | none | Not in the overhaul | 202 → – |
| 36.702 | Forms for use in contracting for architect-engineer services. | none | Not in the overhaul | 144 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress