FAR Part 36: Construction and Architect-engineer Contracts

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 81 sections, 9,525 words (Part 36 as in force, eCFR as of Oct 29, 2026). Overhaul text: 26 sections, 4,649 words, titled "Construction and Architect-Engineer Contracts" (on acquisition.gov ↗, issued Jul 24, 2025). By number: 0 the same, 7 changed, 74 not in the overhaul (5 with the same heading under another number), 19 new.

36.301: Changed (7% alike)

Today: Use of two-phase design-build selection procedures.

This section in plain English

(a) During formal or informal acquisition planning (see part 7), if considering the use of two-phase design-build selection procedures, the contracting officer shall conduct the evaluation in paragraph (b) of this section.

(b) The two-phase design-build selection procedures shall be used when the contracting officer determines that this method is appropriate, based on the following:

(1) Three or more offers are anticipated.

(2) Design work must be performed by offerors before developing price or cost proposals, and offerors will incur a substantial amount of expense in preparing offers.

(3) The following criteria have been considered:

(i) The extent to which the project requirements have been adequately defined.

(ii) The time constraints for delivery of the project.

(iii) The capability and experience of potential contractors.

(iv) The suitability of the project for use of the two-phase selection method.

(v) The capability of the agency to manage the two-phase selection process.

(vi) Other criteria established by the head of the contracting activity.

Overhaul text: Responsibilities of contracting officers.

On acquisition.gov ↗

See part 42 for performing general contract administration functions. For construction and architect-engineer services there are additional functions including:

(a) Performance and Deliverables.

(1) Contracting officers can, in writing, request the removal of any contractor employee deemed incompetent, careless, or otherwise objectionable (see 52.236-5).

(2) Contracting officers must provide the contractor with a list of work remaining to be performed or corrected for any portions of the work the Government intends to possess or use, prior to taking possession or using said work (see 52.236-11).

(3) Regarding schedules for construction contracts:

(i) The contracting officer may withhold approval of progress payments if the contractor fails to submit the required schedule.

(ii)

(A) The contracting officer must determine whether the work is progressing with sufficient diligence to meet the contract's specified completion time; and

(B) May terminate the contractor's right to proceed with the work, or any separable part of it, per the default terms of the contract if the contractor fails to recover lost time (see 52.236-15).

(b) Modifications.

(1) Upon receiving written notice of differing site conditions, the contracting officer must—

(i) Promptly investigate the site; and

(ii) Negotiate an equitable adjustment if the conditions materially differ, leading to an increase or decrease in the contractor's costs or performance time. Requests for an equitable adjustment will be allowed only if prior written notice is received or if submitted before final payment (see 52.236-2).

(2) If repairs are not made promptly to damaged existing vegetation, structures, equipment, utilities, or improvements; contracting officers may have the necessary work performed and charge the cost to the contractor (see 52.236-9).

(3) If stakes and marks are destroyed by the contractor, the contracting officer may replace them and deduct the cost from due or future payments (see 52.236-17).

(4) Regarding specifications and drawings for construction—

(i) The contracting officer must—

(A) Make a written determination in the case of a discrepancy in the figures, in the drawings, or in the specifications; and

(B) Approve or disapprove shop drawings, with reasons for disapproval if applicable.

(ii) If the contracting officer approves a shop drawing variation from the contract requirements that is minor or does not impact price or performance time, a contract modification will not be issued. For all other approved variations, the contracting officer must issue a contract modification (see 52.236-21).

(5) If a construction contract needs a modification due to architect-engineer design errors, the contracting officer must—

(i) Assess the architect-engineer's liability, with the advice of technical personnel and legal counsel;

(ii) Seek cost recovery if the amount exceeds administrative costs or if it benefits the Government; and

(iii) Include in the contract file a written statement detailing the recovery decision (see 52.236-23).

(c) Compliance and Reporting.

(1) Contracting officers must ensure compliance with the labor standards requirement of the contract (e.g., payroll reviews, on-site inspections, and employee interviews to determine compliance).

(2) Contracting officers should advise contractors to promptly execute and return any required payment and performance bonds to ensure a notice to proceed is issued to commence work in a timely manner (see part 28).

(3) Contracting officers must, if appropriate, give written consent for the contractor to abandon, without removal, temporary buildings and utilities. (see 52.236-10).

(4) If the contracting officer becomes aware of noncompliance with requirements or conditions that endanger public or Government personnel health or safety, the contracting officer—

(i) Must notify the contractor orally, then in writing, requesting immediate corrective action; and

(ii) May issue a stop-work order if the contractor fails to promptly take satisfactory corrective action. (see 52.236-13).

Section by section

SectionTodayOverhaul textStatusWords
36.000Scope of part.Scope of part.Changed · 49% alike37 → 20
36.001Definitions.Definition.Changed · 14% alike81 → 34
36.002nonePolicy.New number– → 317
36.101Applicability.Construction.Changed · 0% alike98 → 0
36.101-1noneAcquisition Strategy.New number– → 332
36.101-2noneUse of two-phase design-build selection procedures.New number– → 343
36.101-3noneScope of work.New number
Same heading as today's 36.302
– → 70
36.101-4noneAdvance notices and solicitations.New number– → 223
36.101-5noneLiquidated damages.New number
Same heading as today's 36.206
– → 25
36.101-6noneGovernment cost estimate.New number– → 72
36.101-7noneClauses.New number– → 893
36.102Definitions.Architect-Engineer Services.Changed · 0% alike213 → 0
36.102-1nonePublic announcement.New number
Same heading as today's 36.601-1
– → 18
36.102-2noneContracting procedures and competition.New number– → 168
36.102-3noneGovernment cost estimate.New number– → 47
36.102-4noneClauses.New number– → 183
36.103Methods of contracting.noneNot in the overhaul62 → –
36.104Policy.noneNot in the overhaul425 → –
36.201Evaluation of contractor performance.Construction.Changed · 0% alike14 → 0
36.201-1noneLimitations.New number– → 75
36.201-2noneStandard and optional forms.New number– → 204
36.202Specifications.Architect and engineering services.Changed · 0% alike74 → 0
36.202-1noneEvaluation.New number– → 241
36.202-2noneSelection authority.New number
Same heading as today's 36.602-4
– → 168
36.202-3noneAward.New number– → 210
36.202-4noneShort selection process for contracts not to exceed the simplified acquisition threshold.New number
Same heading as today's 36.602-5
– → 218
36.202-5noneStandard and optional forms.New number– → 164
36.203Government estimate of construction costs.noneNot in the overhaul185 → –
36.204Disclosure of the magnitude of construction projects.noneNot in the overhaul107 → –
36.205Statutory cost limitations.noneNot in the overhaul218 → –
36.206Liquidated damages.noneNot in the overhaul
Same heading at 36.101-5
21 → –
36.207Pricing fixed-price construction contracts.noneNot in the overhaul198 → –
36.208Concurrent performance of firm-fixed-price and other types of construction contracts.noneNot in the overhaul58 → –
36.209Construction contracts with architect-engineer firms.noneNot in the overhaul36 → –
36.210Inspection of site and examination of data.noneNot in the overhaul165 → –
36.211Distribution of advance notices and solicitations.noneNot in the overhaul343 → –
36.212Preconstruction orientation.noneNot in the overhaul135 → –
36.213Special procedures for sealed bidding in construction contracting.noneNot in the overhaul0 → –
36.213-1General.noneNot in the overhaul22 → –
36.213-2Presolicitation notices.noneNot in the overhaul192 → –
36.213-3Invitations for bids.noneNot in the overhaul345 → –
36.213-4Notice of award.noneNot in the overhaul79 → –
36.214Special procedures for price negotiation in construction contracting.noneNot in the overhaul225 → –
36.215Special procedures for cost-reimbursement contracts for construction.noneNot in the overhaul36 → –
36.300Scope of subpart.noneNot in the overhaul26 → –
36.301Use of two-phase design-build selection procedures.Responsibilities of contracting officers.Changed · 7% alike166 → 624
36.302Scope of work.noneNot in the overhaul
Same heading at 36.101-3
60 → –
36.303Procedures.noneNot in the overhaul41 → –
36.303-1Phase One.noneNot in the overhaul281 → –
36.303-2Phase Two.noneNot in the overhaul70 → –
36.500Scope of subpart.noneNot in the overhaul60 → –
36.501Performance of work by the contractor.noneNot in the overhaul220 → –
36.502Differing site conditions.noneNot in the overhaul93 → –
36.503Site investigation and conditions affecting the work.noneNot in the overhaul97 → –
36.504Physical data.noneNot in the overhaul43 → –
36.505Material and workmanship.noneNot in the overhaul20 → –
36.506Superintendence by the contractor.noneNot in the overhaul94 → –
36.507Permits and responsibilities.noneNot in the overhaul39 → –
36.508Other contracts.noneNot in the overhaul92 → –
36.509Protection of existing vegetation, structures, equipment, utilities, and improvements.noneNot in the overhaul99 → –
36.510Operations and storage areas.noneNot in the overhaul94 → –
36.511Use and possession prior to completion.noneNot in the overhaul65 → –
36.512Cleaning up.noneNot in the overhaul92 → –
36.513Accident prevention.noneNot in the overhaul201 → –
36.514Availability and use of utility services.noneNot in the overhaul98 → –
36.515Schedules for construction contracts.noneNot in the overhaul104 → –
36.516Quantity surveys.noneNot in the overhaul82 → –
36.517Layout of work.noneNot in the overhaul47 → –
36.518Work oversight in cost-reimbursement construction contracts.noneNot in the overhaul29 → –
36.519Organization and direction of the work.noneNot in the overhaul28 → –
36.520Contracting by negotiation.noneNot in the overhaul22 → –
36.521Specifications and drawings for construction.noneNot in the overhaul135 → –
36.522Preconstruction conference.noneNot in the overhaul48 → –
36.523Site visit.noneNot in the overhaul54 → –
36.600Scope of subpart.noneNot in the overhaul29 → –
36.601Policy.noneNot in the overhaul0 → –
36.601-1Public announcement.noneNot in the overhaul
Same heading at 36.102-1
42 → –
36.601-2Competition.noneNot in the overhaul23 → –
36.601-3Applicable contracting procedures.noneNot in the overhaul265 → –
36.601-4Implementation.noneNot in the overhaul273 → –
36.602Selection of firms for architect-engineer contracts.noneNot in the overhaul0 → –
36.602-1Selection criteria.noneNot in the overhaul212 → –
36.602-2Evaluation boards.noneNot in the overhaul128 → –
36.602-3Evaluation board functions.noneNot in the overhaul147 → –
36.602-4Selection authority.noneNot in the overhaul
Same heading at 36.202-2
193 → –
36.602-5Short selection process for contracts not to exceed the simplified acquisition threshold.noneNot in the overhaul
Same heading at 36.202-4
213 → –
36.603Collecting data on and appraising firms' qualifications.noneNot in the overhaul334 → –
36.604Performance evaluation.noneNot in the overhaul15 → –
36.605Government cost estimate for architect-engineer work.noneNot in the overhaul149 → –
36.606Negotiations.noneNot in the overhaul309 → –
36.607Release of information on firm selection.noneNot in the overhaul149 → –
36.608Liability for Government costs resulting from design errors or deficiencies.noneNot in the overhaul155 → –
36.609Contract clauses.noneNot in the overhaul0 → –
36.609-1Design within funding limitations.noneNot in the overhaul359 → –
36.609-2Redesign responsibility for design errors or deficiencies.noneNot in the overhaul93 → –
36.609-3Work oversight in architect-engineer contracts.noneNot in the overhaul21 → –
36.609-4Requirements for registration of designers.noneNot in the overhaul59 → –
36.700Scope of subpart.noneNot in the overhaul42 → –
36.701Standard and optional forms for use in contracting for construction or dismantling, demolition, or removal of improvements.noneNot in the overhaul202 → –
36.702Forms for use in contracting for architect-engineer services.noneNot in the overhaul144 → –